IDOT contract 62X67 bid tabulation
Section 2024-1028-RS. Let by Illinois DOT on June 13, 2025, Kane, District 01. 3 bids received; low bid $2,654,662 by Curran Contracting Company.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 57
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Curran Contracting Company | $2,654,662 | Low |
| 2 | Plote Construction, Inc. | $2,840,000 | +7.0% |
| 3 | Builders Paving, LLC | $3,248,805 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Curran Contracting Company | 2. Plote Construction, Inc. | 3. Builders Paving, LLC |
|---|---|---|---|---|---|---|
| 1 | Tree care (K0026700) | EACH | 50 | $150.00 | $450.00 | $150.00 |
| 2 | Grading & shap SHLDRS (X2020110) | UNIT | 27 | $125.00 | $300.00 | $75.00 |
| 3 | CC&G RMVL repl < = 10 (X4400501) | LF | 150 | $89.50 | $80.00 | $80.00 |
| 4 | CC&G RMVL repl > 10FT (X4400503) | LF | 1,300 | $75.85 | $70.00 | $80.00 |
| 5 | SS cleaned 12 (X5537800) | LF | 120 | $20.00 | $20.00 | $1.00 |
| 6 | FR & lids adjust SPL (X6030310) | EACH | 1 | $6,500.00 | $6,500.00 | $2,500.00 |
| 7 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $2,250.00 | $4,500.00 | $3,500.00 |
| 8 | Temp info signing (X7200061) | SF | 220 | $20.00 | $20.00 | $20.00 |
| 9 | Det loop repl (X8860105) | LF | 66 | $35.43 | $39.87 | $40.00 |
| 10 | Drainage STR cleaned (Z0018500) | EACH | 8 | $800.00 | $800.00 | $500.00 |
| 11 | Bit matls tack CT (40600290) | LB | 51,443 | $1.00 | $0.01 | $0.01 |
| 12 | Long joint sealant (40600370) | LF | 29,243 | $2.55 | $3.80 | $3.75 |
| 13 | Mix CR JTS flangewys (40600400) | TON | 129 | $250.00 | $250.00 | $300.00 |
| 14 | HMA surf rem butt JT (40600982) | SY | 167 | $20.00 | $5.00 | $45.00 |
| 15 | HMA repl over patch (40601005) | TON | 863 | $140.00 | $70.00 | $75.00 |
| 16 | P HMA BC IL-4.75 N50 (40603200) | TON | 2,420 | $89.00 | $102.00 | $95.00 |
| 17 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 8,365 | $100.00 | $110.00 | $115.00 |
| 18 | Protective coat (42001300) | SY | 323 | $1.00 | $5.00 | $0.10 |
| 19 | HMA surf rem 1 3/4 (44000156) | SY | 27,749 | $2.25 | $2.10 | $4.00 |
| 20 | HMA surf rem 2 1/2 (44000159) | SY | 57,599 | $3.60 | $2.70 | $5.00 |
| 21 | HMA RM OV patch 4 (44002216) | SY | 2,218 | $10.00 | $10.00 | $10.00 |
| 22 | HMA RM OV patch 9 (44002236) | SY | 727 | $18.50 | $15.00 | $20.00 |
| 23 | CL D patch T2 12 (44201789) | SY | 1,428 | $155.00 | $70.00 | $50.00 |
| 24 | CL D patch T3 12 (44201794) | SY | 200 | $130.00 | $70.00 | $50.00 |
| 25 | CL D patch T4 12 (44201796) | SY | 590 | $105.00 | $70.00 | $50.00 |
| 26 | CL D patch T2 15 (44201827) | SY | 477 | $182.50 | $110.00 | $75.00 |
| 27 | CL D patch T3 15 (44201831) | SY | 50 | $155.00 | $110.00 | $75.00 |
| 28 | CL D patch T4 15 (44201833) | SY | 200 | $117.50 | $110.00 | $75.00 |
| 29 | Agg wedge SHLD type B (48102100) | TON | 634 | $60.00 | $50.00 | $45.00 |
| 30 | FR & grates adjust (60300105) | EACH | 3 | $1,500.00 | $1,500.00 | $1,000.00 |
| 31 | Shoulder rum strip 8 (64200108) | LF | 39,279 | $0.45 | $0.40 | $0.75 |
| 32 | Mobilization (67100100) | LS | 1 | $190,000 | $169,000 | $780,000 |
| 33 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 34 | Traf cont-prot 701306 (70100460) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 35 | TR cont & prot 701501 (70102620) | LS | 1 | $10,950 | $420,434 | $25,000 |
| 36 | TR cont & prot 701502 (70102622) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 37 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 38 | Short term pavt mking (70300100) | LF | 39,620 | $0.30 | $0.01 | $1.00 |
| 39 | SHRT TRM pavt MK rem (70300150) | SF | 3,105 | $3.10 | $0.01 | $0.01 |
| 40 | Temp PVT MK LTR & sym paint (70300211) | SF | 760 | $0.01 | $0.01 | $1.00 |
| 41 | Temp PVT MK line 4 - paint (70300221) | LF | 430,016 | $0.01 | $0.01 | $0.01 |
| 42 | Temp PVT MK line 6 - paint (70300241) | LF | 3,770 | $0.01 | $0.01 | $0.50 |
| 43 | Temp PVT MK line 12 - paint (70300261) | LF | 1,062 | $0.01 | $0.01 | $1.00 |
| 44 | Temp PVT MK line 24 - paint (70300281) | LF | 1,026 | $0.01 | $0.01 | $2.00 |
| 45 | Terminal marker - DA (72501000) | EACH | 2 | $149.99 | $100.00 | $150.00 |
| 46 | THPL PVT MK LTR & sym (78000100) | SF | 224 | $5.00 | $5.00 | $5.00 |
| 47 | THPL PVT MK line 4 (78000200) | LF | 87,904 | $0.77 | $0.77 | $0.77 |
| 48 | THPL PVT MK line 6 (78000400) | LF | 1,191 | $1.19 | $1.19 | $1.20 |
| 49 | THPL PVT MK line 12 (78000600) | LF | 267 | $2.39 | $2.39 | $2.40 |
| 50 | THPL PVT MK line 24 (78000650) | LF | 171 | $4.77 | $4.77 | $4.75 |
| 51 | Raised refl pavt MKR (78100100) | EACH | 637 | $42.50 | $42.50 | $42.50 |
| 52 | Raised ref PVT MK rem (78300200) | EACH | 637 | $15.00 | $5.00 | $20.00 |
| 53 | PVT MKG rem WTR blast (78300202) | SF | 5,460 | $0.01 | $3.00 | $3.00 |
| 54 | Main EX TR sig instal (85000200) | EACH | 1 | $11,211 | $1,650.00 | $1,650.00 |
| 55 | Elcbl C lead 14 1PR (87301305) | LF | 1,034 | $5.00 | $3.55 | $3.55 |
| 56 | Inductive loop detect (88500100) | EACH | 2 | $160.80 | $610.00 | $610.00 |
| 57 | Det loop T1 (88600100) | LF | 66 | $34.45 | $39.87 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.