IDOT contract 78A39 bid tabulation
Section (110,101)N-1. Let by Illinois DOT on June 13, 2025, Gallatin, District 09. 2 bids received; low bid $1,697,173 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 82
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $1,697,173 | Low |
| 2 | E. T. Simonds Construction Company | $1,697,696 | 0.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Mowing SPL (X2503110) | ACRE | 0.75 | $3,000.00 | $2,070.08 |
| 2 | Prof DMD GRND con PVT (X4202010) | SY | 2,887 | $15.00 | $10.89 |
| 3 | Temp pavt removal (X4400110) | SY | 93 | $12.00 | $17.28 |
| 4 | Memb WTRPRF sys B STR (X5810103) | SY | 44 | $12.00 | $132.57 |
| 5 | TC-prot 701321 SPL (X7010202) | EACH | 1 | $77,013 | $26,481 |
| 6 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $25,000 | $3,375.90 |
| 7 | Detour signing (X7200203) | LS | 1 | $10,000 | $24,292 |
| 8 | Wood pole 25 CL 4 (X8302125) | EACH | 1 | $2,500.00 | $1,835.12 |
| 9 | Construction layout (Z0013798) | LS | 1 | $33,000 | $22,869 |
| 10 | Rock fill - foundatn (Z0054517) | TON | 69 | $35.00 | $48.45 |
| 11 | Earth excavation (20200100) | CY | 2,203 | $34.00 | $40.57 |
| 12 | Seeding CL 2A (25000210) | ACRE | 0.75 | $5,700.00 | $4,867.51 |
| 13 | Seeding CL 7 (25000350) | ACRE | 0.75 | $1,500.00 | $1,485.00 |
| 14 | Nitrogen fert nutr (25000400) | LB | 68 | $2.00 | $1.82 |
| 15 | Phosphorus fert nutr (25000500) | LB | 68 | $2.00 | $1.82 |
| 16 | Potassium fert nutr (25000600) | LB | 68 | $2.00 | $1.82 |
| 17 | Erosion contr blanket (25100630) | SY | 3,512 | $2.25 | $2.15 |
| 18 | Temp eros contr seed (28000250) | LB | 150 | $3.00 | $1.65 |
| 19 | Temp ditch checks (28000305) | LF | 126 | $20.00 | $15.18 |
| 20 | Perimeter eros bar (28000400) | LF | 942 | $5.00 | $5.18 |
| 21 | Inlet & pipe protect (28000500) | EACH | 1 | $200.00 | $151.37 |
| 22 | Stone riprap CL A4 (28100107) | SY | 52 | $90.00 | $65.01 |
| 23 | Stone riprap CL A4 (28100207) | TON | 7 | $45.00 | $114.17 |
| 24 | Filter fabric (28200200) | SY | 62 | $10.00 | $8.25 |
| 25 | Agg subgrade impr 12 (30300112) | SY | 3,980 | $28.00 | $26.89 |
| 26 | Stab subbase 4 (31200100) | SY | 3,980 | $36.00 | $35.51 |
| 27 | PCC base cse W 9 (35400400) | SY | 355 | $140.00 | $148.61 |
| 28 | PCC PVT 9 jointed (42000401) | SY | 2,887 | $110.00 | $118.22 |
| 29 | Pavement rem (44000100) | SY | 2,154 | $21.00 | $25.78 |
| 30 | Paved SHLD removal (44004250) | SY | 240 | $12.00 | $22.33 |
| 31 | Dowel bars 1 1/4 (44201298) | EACH | 88 | $30.00 | $6.76 |
| 32 | Agg wedge SHLD type B (48102100) | TON | 78 | $90.00 | $62.40 |
| 33 | PCC shoulders 9 (48300400) | SY | 925 | $95.00 | $122.84 |
| 34 | Conc headwall removal (50104400) | EACH | 2 | $250.00 | $439.60 |
| 35 | Pipe culvert remov (50105220) | LF | 16 | $80.00 | $33.48 |
| 36 | Structure excavation (50200100) | CY | 54.50 | $35.00 | $56.30 |
| 37 | Rem/disp uns matl-STR (50200450) | CY | 40 | $40.00 | $68.48 |
| 38 | Reinf bars, epoxy CTD (50800205) | LB | 10,360 | $2.00 | $2.32 |
| 39 | Perm SHT piling (52200015) | SF | 1,309 | $70.00 | $76.44 |
| 40 | Expan bolts 3/4 (54002020) | EACH | 52 | $70.00 | $413.03 |
| 41 | Conc box cul (54003000) | CY | 53 | $2,200.00 | $2,018.15 |
| 42 | P cul CL A 1 24 (542A0229) | LF | 52 | $250.00 | $160.45 |
| 43 | PRC flar end sec 24 (54213669) | EACH | 2 | $1,900.00 | $2,450.42 |
| 44 | Geocomposite wall DR (59100100) | SY | 44 | $30.00 | $26.26 |
| 45 | Engr field office A (67000400) | CAL MO | 12 | $2,000.00 | $1,800.00 |
| 46 | Mobilization (67100100) | LS | 1 | $99,000 | $129,560 |
| 47 | Traf cont-prot 701201 (70100450) | LS | 1 | $10,000 | $8,033.37 |
| 48 | Traf cont-prot 701306 (70100460) | LS | 1 | $0.01 | $0.01 |
| 49 | Traf cont-prot 701326 (70100500) | LS | 1 | $0.01 | $6,372.01 |
| 50 | TR cont & prot 701701 (70102635) | LS | 1 | $5,000.00 | $0.01 |
| 51 | TR cont surveillance (70103815) | CAL DAY | 14 | $0.01 | $0.01 |
| 52 | Temp BR traf signals (70106500) | EACH | 1 | $55,000 | $21,725 |
| 53 | Temp rumble strips (70106700) | EACH | 12 | $1,300.00 | $1,303.07 |
| 54 | Changeable message SN (70107025) | CAL DAY | 152 | $0.01 | $56.38 |
| 55 | Short term pavt mking (70300100) | LF | 219 | $2.00 | $1.31 |
| 56 | SHRT TRM pavt MK rem (70300150) | SF | 73 | $5.00 | $31.66 |
| 57 | Temp PVT MK line 4 - paint (70300221) | LF | 2,758 | $0.01 | $0.01 |
| 58 | Temp PVT MK line 24 - paint (70300281) | LF | 142 | $0.01 | $0.01 |
| 59 | Temp conc barrier (70400100) | LF | 800 | $40.00 | $29.64 |
| 60 | Pin temp conc barrier (70400125) | EACH | 150 | $25.00 | $31.24 |
| 61 | Rel temp conc barrier (70400200) | LF | 662.50 | $3.00 | $8.91 |
| 62 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $6,000.00 | $6,641.25 |
| 63 | Imp attn rel NRN TL3 (70600352) | EACH | 2 | $1,500.00 | $2,514.79 |
| 64 | Metal post TY A (72900100) | LF | 23 | $18.00 | $3.59 |
| 65 | Wood sin support (73000100) | LF | 200 | $62.00 | $24.14 |
| 66 | Mod ureth PM line 4 (78009004) | LF | 2,758 | $6.00 | $5.08 |
| 67 | Mod ureth PM line 24 (78009024) | LF | 142 | $36.00 | $30.80 |
| 68 | Raised refl pavt MKR (78100100) | EACH | 32 | $250.00 | $211.20 |
| 69 | Barr wall ref type C (78200011) | EACH | 91 | $10.00 | $13.42 |
| 70 | Raised ref PVT MK rem (78300200) | EACH | 17 | $25.00 | $31.26 |
| 71 | PVT MKG rem WTR blast (78300202) | SF | 1,851 | $0.01 | $5.78 |
| 72 | Serv install TY A (80500100) | EACH | 1 | $4,000.00 | $3,045.23 |
| 73 | Undrgrd C PVC 2 (81028350) | LF | 10 | $72.00 | $61.71 |
| 74 | FL cont (85800100) | EACH | 1 | $1,600.00 | $1,319.69 |
| 75 | Uninter power sup ext (86200300) | EACH | 1 | $3,800.00 | $0.01 |
| 76 | Elcbl C signal 14 3C (87301225) | LF | 106 | $6.00 | $4.62 |
| 77 | Elcbl C egrdc 6 1C (87301900) | LF | 18 | $11.00 | $9.35 |
| 78 | S maa & P 55 (87700320) | EACH | 1 | $43,000 | $37,568 |
| 79 | Conc FDN TY E 36D (87800415) | LF | 15 | $450.00 | $369.94 |
| 80 | SH P LED 4F 1S mam (88040410) | EACH | 1 | $2,200.00 | $1,864.80 |
| 81 | Remov EX TS equip (89502375) | EACH | 2 | $2,000.00 | $1,768.12 |
| 82 | Remov EX conc FDN (89502385) | EACH | 1 | $1,400.00 | $1,178.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.