IDOT contract 78A92 bid tabulation
Section 11SLP-1. Let by Illinois DOT on June 13, 2025, Union, District 09. 2 bids received; low bid $92,263 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 17
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $92,263 | Low |
| 2 | K. D. Crain and Sons, Inc. | $118,760 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. K. D. Crain and Sons, Inc. |
|---|---|---|---|---|---|
| 1 | Rock excavation (20200200) | CY | 30 | $300.00 | $110.00 |
| 2 | Rem & disp uns matl (20201200) | CY | 279 | $60.00 | $95.00 |
| 3 | Grading & shap ditch (21400100) | LF | 500 | $15.00 | $19.00 |
| 4 | Seeding CL 2 (25000200) | ACRE | 0.30 | $0.01 | $9,500.00 |
| 5 | Seeding CL 7 (25000350) | ACRE | 0.30 | $0.01 | $8,800.00 |
| 6 | Nitrogen fert nutr (25000400) | LB | 22 | $2.00 | $9.00 |
| 7 | Phosphorus fert nutr (25000500) | LB | 22 | $2.00 | $9.00 |
| 8 | Potassium fert nutr (25000600) | LB | 22 | $2.00 | $9.00 |
| 9 | Agr ground limestone (25000700) | TON | 0.90 | $0.01 | $700.00 |
| 10 | Mulch method 2 (25100115) | ACRE | 0.30 | $0.01 | $11,000 |
| 11 | Erosion contr blanket (25100630) | SY | 575 | $5.00 | $3.00 |
| 12 | Temp eros contr seed (28000250) | LB | 24 | $0.01 | $25.00 |
| 13 | Stone riprap CL A3 (28100205) | TON | 335 | $60.00 | $68.00 |
| 14 | Filter fabric (28200200) | SY | 308 | $2.00 | $7.00 |
| 15 | Mobilization (67100100) | LS | 1 | $5,500.00 | $9,200.00 |
| 16 | Traf cont-prot 701201 (70100450) | LS | 1 | $27,000 | $25,000 |
| 17 | Changeable message SN (70107025) | CAL DAY | 28 | $100.00 | $285.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.