IDOT contract 80B27 bid tabulation
Section 2025-2008-RS. Let by Illinois DOT on April 24, 2026, Cook, District 01. 4 bids received; low bid $5,915,339 by Plote Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 133
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Plote Construction, Inc. | $5,915,339 | Low |
| 2 | K-Five Construction Corporation | $6,102,006 | +3.0% |
| 3 | Peter Baker & Son Co. | $6,425,726 | +9.0% |
| 4 | Builders Paving, LLC | $7,145,573 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Plote Construction, Inc. | 2. K-Five Construction Corporation | 3. Peter Baker & Son Co. | 4. Builders Paving, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $29,900 | $20,000 | $29,900 | $50,000 |
| 2 | Ped signal post 10 FT (X1400367) | EACH | 3 | $1,406.68 | $1,406.68 | $2,007.36 | $1,500.00 |
| 3 | Ped signal post 5 FT (X1400378) | EACH | 17 | $1,145.56 | $1,145.56 | $1,278.48 | $1,250.00 |
| 4 | BRC PVR rem renstl SP (X1700021) | SF | 5,188 | $34.00 | $35.25 | $32.00 | $40.00 |
| 5 | Temporary ramp SPL (X4060995) | SY | 876 | $40.00 | $27.00 | $12.00 | $10.00 |
| 6 | PC conc sidewalk 5 SP (X4240430) | SF | 217 | $13.00 | $9.75 | $13.00 | $25.00 |
| 7 | PCC surf rem var DP (X4400100) | SY | 3,903 | $12.00 | $4.00 | $7.57 | $5.00 |
| 8 | CC&G RMVL repl < = 10 (X4400501) | LF | 180 | $75.00 | $70.00 | $75.00 | $75.00 |
| 9 | CC&G RMVL repl > 10FT (X4400503) | LF | 8,582 | $52.00 | $50.00 | $52.00 | $60.00 |
| 10 | SS cleaned 12 (X5537800) | LF | 5,160 | $2.00 | $2.00 | $2.00 | $2.00 |
| 11 | FR & lids adjust SPL (X6030310) | EACH | 223 | $1,015.00 | $975.00 | $1,015.00 | $1,150.00 |
| 12 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $4,000.00 | $3,500.00 | $2,000.00 | $4,500.00 |
| 13 | Temp info signing (X7200061) | SF | 202.80 | $17.00 | $17.00 | $17.00 | $18.00 |
| 14 | Mthyl meth PVMT colrz (X7800010) | SY | 12 | $250.00 | $150.00 | $250.00 | $600.00 |
| 15 | Accessible ped signal (X8760200) | EACH | 36 | $1,818.45 | $1,818.45 | $1,891.00 | $2,100.00 |
| 16 | Conc FDN TY A 12D (X8780012) | LF | 72 | $347.98 | $347.98 | $318.84 | $375.00 |
| 17 | Det loop repl (X8860105) | LF | 2,968 | $26.98 | $26.98 | $31.88 | $28.00 |
| 18 | Drainage STR cleaned (Z0018500) | EACH | 344 | $350.00 | $350.00 | $350.00 | $365.00 |
| 19 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 4 | $792.00 | $792.00 | $605.00 | $800.00 |
| 20 | RR prot liability ins (Z0048665) | LS | 1 | $12,000 | $10,000 | $10,552 | $30,000 |
| 21 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 22 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 23 | Earth excavation (20200100) | CY | 350 | $51.00 | $67.05 | $45.00 | $125.00 |
| 24 | Rem & disp uns matl (20201200) | CY | 38 | $79.00 | $40.00 | $100.00 | $125.00 |
| 25 | Topsoil F & P 4 (21101615) | SY | 739 | $0.10 | $8.00 | $13.00 | $10.00 |
| 26 | Sodding salt tolerant (25200110) | SY | 739 | $25.75 | $23.50 | $21.00 | $30.00 |
| 27 | Supple watering (25200200) | UNIT | 7.40 | $25.00 | $200.00 | $40.00 | $50.00 |
| 28 | Agg subgrade improve (30300001) | CY | 38 | $225.00 | $48.00 | $90.00 | $75.00 |
| 29 | Agg subgrade impr 12 (30300112) | SY | 456 | $37.00 | $49.50 | $62.00 | $75.00 |
| 30 | Sub gran mat B (31101100) | CY | 63 | $200.00 | $40.00 | $100.00 | $75.00 |
| 31 | HMA base cse 8 (35501316) | SY | 208.30 | $99.00 | $52.00 | $80.00 | $165.00 |
| 32 | HMA BC wid 8 (35600708) | SY | 51.40 | $99.00 | $52.00 | $113.00 | $325.00 |
| 33 | Bit matls tack CT (40600290) | LB | 48,615 | $0.01 | $0.01 | $0.01 | $0.01 |
| 34 | Long joint sealant (40600370) | LF | 38,619 | $2.60 | $2.53 | $3.50 | $4.00 |
| 35 | Mix CR JTS flangewys (40600400) | TON | 122.20 | $75.00 | $450.00 | $200.00 | $775.00 |
| 36 | HMA surf rem butt JT (40600982) | SY | 965 | $13.00 | $10.00 | $1.00 | $10.00 |
| 37 | HMA repl over patch (40601005) | TON | 690 | $145.00 | $248.00 | $166.00 | $150.00 |
| 38 | HMA BC IL-9.5 N70 (40602985) | TON | 2,661 | $110.00 | $93.00 | $103.00 | $98.00 |
| 39 | P HMA BC IL19.0 N90 (40603240) | TON | 3,630 | $108.00 | $98.00 | $113.00 | $100.00 |
| 40 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 8,016 | $150.00 | $137.00 | $145.00 | $130.00 |
| 41 | Incidental HMA surf (40800050) | TON | 10 | $420.00 | $369.00 | $200.00 | $1,000.00 |
| 42 | Protective coat (42001300) | SY | 4,641 | $1.00 | $1.00 | $1.00 | $1.00 |
| 43 | PCC driveway pavt 6 (42300200) | SY | 141 | $90.00 | $77.00 | $90.00 | $90.00 |
| 44 | PCC driveway pavt 8 (42300400) | SY | 381 | $105.00 | $85.00 | $105.00 | $105.00 |
| 45 | PC conc sidewalk 5 (42400200) | SF | 17,936 | $9.00 | $8.00 | $9.00 | $12.00 |
| 46 | Detectable warnings (42400800) | SF | 1,527 | $30.00 | $30.00 | $30.00 | $30.00 |
| 47 | Pavement rem (44000100) | SY | 752 | $5.00 | $25.50 | $20.00 | $30.00 |
| 48 | HMA surf rem 1 3/4 (44000156) | SY | 28,936 | $2.75 | $5.00 | $3.75 | $7.50 |
| 49 | HMA surf rem 3 3/4 (44000164) | SY | 23,752 | $4.55 | $7.00 | $6.99 | $9.50 |
| 50 | HMA surf rem 4 (44000165) | SY | 28,807 | $5.50 | $7.25 | $7.72 | $10.25 |
| 51 | Drive pavement rem (44000200) | SY | 261 | $15.00 | $28.00 | $15.00 | $15.00 |
| 52 | Comb curb gutter rem (44000500) | LF | 109 | $12.00 | $7.00 | $12.00 | $15.00 |
| 53 | Sidewalk rem (44000600) | SF | 15,980 | $2.00 | $1.80 | $2.00 | $5.00 |
| 54 | HMA RM OV patch 5 (44002220) | SY | 2,464 | $27.68 | $0.01 | $6.40 | $0.01 |
| 55 | Median removal (44003100) | SF | 12,350 | $5.00 | $2.80 | $5.00 | $4.00 |
| 56 | CL D patch T1 10 (44201761) | SY | 181 | $125.00 | $100.00 | $295.00 | $150.00 |
| 57 | CL D patch T2 10 (44201765) | SY | 1,266 | $120.00 | $100.00 | $230.00 | $125.00 |
| 58 | CL D patch T3 10 (44201769) | SY | 369 | $115.00 | $100.00 | $190.00 | $100.00 |
| 59 | CL D patch T4 10 (44201771) | SY | 648 | $115.00 | $100.00 | $175.00 | $85.00 |
| 60 | CL D patch T2 12 (44201789) | SY | 1 | $2,200.00 | $100.00 | $266.00 | $200.00 |
| 61 | CL D patch T2 15 (44201827) | SY | 13 | $135.00 | $223.00 | $239.00 | $350.00 |
| 62 | CL D patch T4 15 (44201833) | SY | 536 | $135.00 | $223.00 | $174.00 | $180.00 |
| 63 | CB reconst (60252800) | EACH | 8 | $1,000.00 | $1,600.00 | $1,000.00 | $1,200.00 |
| 64 | Man reconst (60257900) | EACH | 8 | $1,150.00 | $1,800.00 | $1,150.00 | $1,300.00 |
| 65 | Inlets reconst (60262700) | EACH | 3 | $800.00 | $1,300.00 | $800.00 | $850.00 |
| 66 | Valve box adj (60266600) | EACH | 23 | $350.00 | $290.00 | $350.00 | $350.00 |
| 67 | FR & grates adjust (60300105) | EACH | 37 | $450.00 | $475.00 | $450.00 | $450.00 |
| 68 | FR & lids adjust (60300305) | EACH | 46 | $450.00 | $475.00 | $450.00 | $450.00 |
| 69 | FR & grates T11V (60404805) | EACH | 2 | $650.00 | $590.00 | $650.00 | $650.00 |
| 70 | FR & grates T24 (60404950) | EACH | 2 | $485.00 | $450.00 | $485.00 | $500.00 |
| 71 | FR & lids T1 OL (60406000) | EACH | 14 | $450.00 | $425.00 | $450.00 | $450.00 |
| 72 | FR & lids T1 ADA compl OL (60406001) | EACH | 1 | $450.00 | $425.00 | $450.00 | $450.00 |
| 73 | FR & lids T1 CL (60406100) | EACH | 99 | $450.00 | $425.00 | $450.00 | $450.00 |
| 74 | Comb CC&G TB6.06 (60603500) | LF | 1,632 | $35.00 | $40.00 | $35.00 | $35.00 |
| 75 | Comb CC&G TB6.12 (60603800) | LF | 91 | $35.00 | $35.00 | $35.00 | $35.00 |
| 76 | Comb CC&G TY B-6.24 (60605000) | LF | 32 | $60.00 | $39.00 | $60.00 | $60.00 |
| 77 | Conc median surf 4 (60618300) | SF | 236 | $8.00 | $7.50 | $8.00 | $8.00 |
| 78 | Conc median surf 6 (60618320) | SF | 2,736 | $10.00 | $10.50 | $10.00 | $12.00 |
| 79 | Conc med TSB6.06 (60619200) | SF | 1,304 | $21.00 | $19.00 | $21.00 | $22.00 |
| 80 | Conc med TSB6.12 (60619600) | SF | 30 | $21.00 | $25.00 | $21.00 | $25.00 |
| 81 | Non SPL waste disposl (66900200) | CY | 350 | $113.00 | $118.00 | $120.00 | $150.00 |
| 82 | Soil disposal analy (66900530) | EACH | 3 | $1,450.00 | $1,450.00 | $1,600.00 | $1,200.00 |
| 83 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $3,100.00 | $2,700.00 | $7,500.00 |
| 84 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $1,200.00 | $2,100.00 | $500.00 |
| 85 | Reg sub mon (66901006) | CAL DAY | 41 | $680.00 | $680.00 | $1,000.00 | $875.00 |
| 86 | Mobilization (67100100) | LS | 1 | $356,400 | $320,000 | $385,395 | $410,000 |
| 87 | TR cont & prot 701606 (70102625) | LS | 1 | $72,600 | $439,000 | $98,319 | $1.00 |
| 88 | TR cont & prot 701601 (70102630) | LS | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $617,000 |
| 89 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 90 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 91 | TR cont & prot 701701 (70102635) | LS | 1 | $10,000 | $10,000 | $10,000 | $1.00 |
| 92 | TR cont & prot 701801 (70102640) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $25,000 |
| 93 | Short term pavt mking (70300100) | LF | 84,624 | $0.01 | $0.01 | $0.01 | $0.01 |
| 94 | SHRT TRM pavt MK rem (70300150) | SF | 8,316 | $0.01 | $0.01 | $0.01 | $0.01 |
| 95 | Temp PVT MK LTR & sym paint (70300211) | SF | 5,340 | $1.70 | $0.01 | $1.70 | $0.01 |
| 96 | Temp PVT MK line 4 - paint (70300221) | LF | 61,040 | $0.29 | $0.01 | $0.29 | $0.01 |
| 97 | Temp PVT MK line 6 - paint (70300241) | LF | 10,561 | $0.43 | $0.01 | $0.43 | $0.01 |
| 98 | Temp PVT MK line 8 - paint (70300251) | LF | 1,932 | $0.56 | $0.01 | $0.56 | $0.01 |
| 99 | Temp PVT MK line 12 - paint (70300261) | LF | 19,840 | $0.85 | $0.01 | $0.85 | $0.01 |
| 100 | Temp PVT MK line 24 - paint (70300281) | LF | 3,466 | $1.70 | $0.01 | $1.70 | $0.01 |
| 101 | Temp PVT MK L4 T4 tape (70307120) | LF | 24,948 | $0.01 | $0.01 | $0.01 | $0.01 |
| 102 | Sign panel T1 (72000100) | SF | 66 | $35.00 | $35.00 | $35.00 | $42.00 |
| 103 | Rem & rel sign panel asmbly TA (72400205) | EACH | 5 | $250.00 | $250.00 | $250.00 | $300.00 |
| 104 | Teles STL sin support (72800100) | LF | 102 | $20.00 | $20.00 | $20.00 | $20.00 |
| 105 | Base tel STL sin supp (73100100) | EACH | 9 | $500.00 | $500.00 | $500.00 | $800.00 |
| 106 | THPL PVT MK LTR & sym (78000100) | SF | 2,670 | $4.98 | $5.40 | $6.00 | $6.00 |
| 107 | THPL PVT MK line 4 (78000200) | LF | 30,520 | $0.69 | $0.77 | $0.65 | $0.95 |
| 108 | THPL PVT MK line 6 (78000400) | LF | 5,281 | $1.15 | $1.25 | $1.00 | $1.75 |
| 109 | THPL PVT MK line 8 (78000500) | LF | 966 | $1.52 | $1.45 | $2.00 | $2.00 |
| 110 | THPL PVT MK line 12 (78000600) | LF | 9,920 | $1.81 | $2.50 | $3.00 | $3.50 |
| 111 | THPL PVT MK line 24 (78000650) | LF | 1,733 | $4.98 | $5.40 | $6.00 | $6.00 |
| 112 | Raised refl pavt MKR (78100100) | EACH | 933 | $32.00 | $41.50 | $45.00 | $55.00 |
| 113 | Raised ref PVT MK rem (78300200) | EACH | 933 | $24.00 | $0.01 | $10.00 | $15.00 |
| 114 | PVT MKG rem WTR blast (78300202) | SF | 203 | $27.00 | $27.00 | $27.00 | $25.00 |
| 115 | Undrgrd C galvs 2 (81028200) | LF | 410 | $75.10 | $75.10 | $72.08 | $80.00 |
| 116 | Undrgrd C galvs 4 (81028240) | LF | 75 | $100.01 | $100.01 | $112.40 | $105.00 |
| 117 | Handhole (81400100) | EACH | 1 | $3,754.41 | $3,754.41 | $3,442.08 | $3,800.00 |
| 118 | HD handhole (81400200) | EACH | 4 | $5,949.55 | $5,949.55 | $5,329.44 | $6,200.00 |
| 119 | Main EX TR sig instal (85000200) | EACH | 7 | $1,808.02 | $1,808.02 | $14,324 | $2,000.00 |
| 120 | Elcbl C signal 14 2C (87301215) | LF | 5,033 | $4.81 | $4.81 | $3.01 | $5.00 |
| 121 | Elcbl C signal 14 3C (87301225) | LF | 615 | $5.02 | $5.02 | $3.20 | $5.10 |
| 122 | Elcbl C lead 14 1PR (87301305) | LF | 654 | $5.00 | $5.00 | $5.64 | $5.50 |
| 123 | Elcbl C egrdc 6 1C (87301900) | LF | 412 | $5.67 | $5.67 | $7.37 | $6.00 |
| 124 | Drill EX handhole (87900200) | EACH | 21 | $455.26 | $455.26 | $1,017.36 | $475.00 |
| 125 | Ped SH LED 1F BM CDT (88102717) | EACH | 18 | $648.46 | $648.46 | $1,153.14 | $650.00 |
| 126 | Det loop T1 (88600100) | LF | 1,892 | $26.98 | $26.98 | $30.68 | $28.00 |
| 127 | Reloc EX TS equip (89501250) | EACH | 4 | $218.39 | $218.39 | $1,110.78 | $250.00 |
| 128 | Mod EX contr (89502200) | EACH | 3 | $1,256.11 | $1,256.11 | $1,043.68 | $1,350.00 |
| 129 | Rem elcbl FR con (89502300) | LF | 802 | $0.15 | $0.15 | $0.25 | $0.15 |
| 130 | Rem & RE elcbl FR con (89502350) | LF | 510 | $0.29 | $0.29 | $4.94 | $0.30 |
| 131 | Remov EX TS equip (89502375) | EACH | 3 | $623.24 | $623.24 | $740.52 | $650.00 |
| 132 | Rebuild EX handhole (89502376) | EACH | 6 | $3,444.13 | $3,444.13 | $2,874.72 | $3,500.00 |
| 133 | Remov EX handhole (89502380) | EACH | 4 | $1,389.33 | $1,389.33 | $1,541.04 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.