IDOT contract 80B29 bid tabulation

Section 2025-2010-RS. Let by Illinois DOT on January 16, 2026, Lake, District 01. 4 bids received; low bid $1,013,752 by Peter Baker & Son Co..

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
62
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Peter Baker & Son Co.$1,013,752Low
2Payne & Dolan, Inc.$1,049,780+4.0%
3Builders Paving, LLC$1,134,808+12%
4Curran Contracting Company$1,294,618+28%
IDOT contract 80B29: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Peter Baker & Son Co.2. Payne & Dolan, Inc.3. Builders Paving, LLC4. Curran Contracting Company
1Grading & shap SHLDRS (X2020110)UNIT15$75.00$221.72$200.00$200.00
2Temporary ramp SPL (X4060995)SY502$5.00$12.69$5.00$25.00
3PCC surf rem var DP (X4400100)SY93$49.50$11.18$50.00$50.00
4CC&G RMVL repl < = 10 (X4400501)LF534$55.00$55.00$81.90$55.00
5CC&G RMVL repl > 10FT (X4400503)LF200$55.00$55.00$73.90$55.00
6SS cleaned 12 (X5537800)LF103$1.50$10.00$1.50$1.50
7FR & lids adjust SPL (X6030310)EACH5$1,300.00$1,850.00$1,300.00$1,300.00
8Engrs FLD ofc TY A D1 (X6700407)CAL MO12$500.00$2,025.00$3,000.00$3,250.00
9Traf cont-prot TC8 (X7010808)EACH4$750.00$1,000.00$750.00$750.00
10Temp info signing (X7200061)SF102.80$15.00$18.00$15.00$15.00
11Det loop repl (X8860105)LF370$34.37$34.81$34.37$34.37
12Vid veh det sys SN AP (X8891009)EACH1$11,347$14,088$11,347$11,347
13Drainage STR cleaned (Z0018500)EACH7$375.00$500.00$375.00$375.00
14RR prot liability ins (Z0048665)LS1$1,235.00$3,850.00$3,500.00$7,500.00
15Topsoil F & P 4 (21101615)SY62$1.00$28.00$1.00$28.00
16Sodding salt tolerant (25200110)SY62$80.00$90.00$80.00$90.00
17PCC base cse W 9 (35400400)SY71$126.00$126.00$118.25$126.00
18Preparation of base (35800100)SY291$5.00$5.00$2.00$5.00
19Agg base repair (35800200)TON2$10.00$10.00$300.00$10.00
20Bit matls tack CT (40600290)LB13,147$0.01$0.10$0.01$1.50
21Long joint sealant (40600370)LF6,458$3.85$2.87$3.36$3.50
22Mix CR JTS flangewys (40600400)TON30$250.00$138.00$535.00$450.00
23HMA surf rem butt JT (40600982)SY225$1.00$45.00$5.00$25.00
24HMA BC IL-9.5 N70 (40602985)TON2,144$89.00$89.00$100.00$107.00
25HMA SC IL-9.5 E N70 (40604072)TON1,909$105.80$110.00$120.00$122.00
26Protective coat (42001300)SY238$0.01$0.10$1.35$0.01
27Pavement rem (44000100)SY71$27.00$27.00$25.00$27.00
28HMA surf rem 3 3/4 (44000164)SY19,355$5.35$5.25$11.00$5.75
29Median removal (44003100)SF1,978$17.50$17.50$8.70$17.50
30CL D patch T2 12 (44201789)SY828$50.00$71.00$65.00$155.00
31CL D patch T3 12 (44201794)SY497$50.00$76.00$60.00$150.00
32CL D patch T4 12 (44201796)SY331$50.00$88.00$55.00$125.00
33Agg wedge SHLD type B (48102100)TON57$109.30$115.00$125.00$150.00
34FR & grates adjust (60300105)EACH5$600.00$685.00$600.00$600.00
35FR & lids adjust (60300305)EACH1$600.00$880.00$600.00$600.00
36Conc med TSB6.12 (60619600)SF1,478$20.00$20.00$25.70$20.00
37Mobilization (67100100)LS1$77,000$120,000$74,733$115,000
38Traf cont-prot 701411 (70100420)EACH1$450.00$1.00$1,958.00$450.00
39TR cont & prot 701501 (70102620)LS1$1,958.00$1.00$1,958.00$15,000
40TR cont & prot 701502 (70102622)LS1$1,958.00$1.00$1,958.00$1,958.00
41TR cont & prot 701601 (70102630)LS1$106,867$8,900.00$1,958.00$1,958.00
42TR cont & prot 701701 (70102635)LS1$1,958.00$1.00$450.00$1,958.00
43Short term pavt mking (70300100)LF1,352$0.01$0.10$0.01$1.00
44SHRT TRM pavt MK rem (70300150)SF226$0.01$12.50$0.01$12.50
45Temp PVT MK LTR & sym paint (70300211)SF219$0.01$2.00$0.01$1.75
46Temp PVT MK line 4 - paint (70300221)LF14,376$0.01$0.35$0.01$0.35
47Temp PVT MK line 6 - paint (70300241)LF1,152$0.01$0.53$0.01$0.53
48Temp PVT MK line 8 - paint (70300251)LF576$0.01$0.70$0.01$0.70
49Temp PVT MK line 12 - paint (70300261)LF624$0.01$1.05$0.01$1.06
50Temp PVT MK line 24 - paint (70300281)LF444$0.01$2.10$0.01$1.60
51Temp PVT MK L4 T4 tape (70307120)LF676$0.01$6.00$0.01$1.20
52THPL PVT MK LTR & sym (78000100)SF73$6.00$6.00$8.50$5.75
53THPL PVT MK line 4 (78000200)LF5,029$1.20$1.20$0.98$0.86
54THPL PVT MK line 6 (78000400)LF399$1.75$1.75$1.47$1.35
55THPL PVT MK line 8 (78000500)LF513$1.85$1.85$2.75$1.75
56THPL PVT MK line 12 (78000600)LF248$3.00$3.00$4.25$2.75
57THPL PVT MK line 24 (78000650)LF148$6.00$6.00$8.50$5.75
58Raised refl pavt MKR (78100100)EACH172$49.50$49.50$62.50$51.25
59Raised ref PVT MK rem (78300200)EACH146$26.00$9.10$5.00$30.00
60Main EX TR sig instal (85000200)EACH1$3,500.00$2,134.24$3,500.00$3,500.00
61Rem elcbl FR con (89502300)LF266$1.65$4.01$1.65$1.65
62Remov EX TS equip (89502375)EACH1$410.00$204.53$410.00$410.00
IDOT contract 80B29: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy