IDOT contract 80B68 bid tabulation
Section 2025-2023-PP. Let by Illinois DOT on April 24, 2026, Dupage, District 01. 3 bids received; low bid $4,613,164 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 98
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $4,613,164 | Low |
| 2 | K-Five Construction Corporation | $4,705,556 | +2.0% |
| 3 | Plote Construction, Inc. | $5,811,544 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. K-Five Construction Corporation | 3. Plote Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $132,000 | $5,600.00 | $9,900.00 |
| 2 | Ped signal post 10 FT (X1400367) | EACH | 1 | $1,462.53 | $1,329.57 | $1,329.57 |
| 3 | Ped signal post 5 FT (X1400378) | EACH | 8 | $1,193.57 | $1,085.06 | $1,085.06 |
| 4 | Rebld EX HD handhole (X1400450) | EACH | 9 | $3,409.36 | $3,099.42 | $3,099.42 |
| 5 | PCC surf rem var DP (X4400100) | SY | 35,429 | $2.00 | $2.25 | $3.50 |
| 6 | CC&G RMVL repl < = 10 (X4400501) | LF | 1,106 | $45.00 | $57.00 | $94.00 |
| 7 | CC&G RMVL repl > 10FT (X4400503) | LF | 3,293 | $40.00 | $55.00 | $83.00 |
| 8 | SS cleaned 12 (X5537800) | LF | 1,000 | $16.50 | $2.00 | $1.00 |
| 9 | FR & lids adjust SPL (X6030310) | EACH | 16 | $850.00 | $1,250.00 | $1,250.00 |
| 10 | Temp info signing (X7200061) | SF | 189 | $30.00 | $15.00 | $15.00 |
| 11 | Rebld EX DBL handhole (X8140238) | EACH | 1 | $4,334.74 | $3,940.67 | $3,940.67 |
| 12 | Accessible ped signal (X8760200) | EACH | 26 | $2,677.31 | $2,433.92 | $2,433.92 |
| 13 | Conc FDN TY A 12D (X8780012) | LF | 40 | $400.55 | $364.14 | $364.14 |
| 14 | Det loop repl (X8860105) | LF | 6,209 | $28.82 | $26.20 | $26.20 |
| 15 | Drainage STR cleaned (Z0018500) | EACH | 198 | $605.00 | $340.00 | $325.00 |
| 16 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 5 | $792.00 | $720.00 | $720.00 |
| 17 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 18 | Earth excavation (20200100) | CY | 95 | $100.00 | $63.00 | $70.00 |
| 19 | Topsoil F & P 4 (21101615) | SY | 1,129 | $0.11 | $9.15 | $9.15 |
| 20 | Sodding salt tolerant (25200110) | SY | 1,129 | $26.79 | $14.05 | $14.05 |
| 21 | Supple watering (25200200) | UNIT | 61 | $27.50 | $1.00 | $1.00 |
| 22 | Perimeter eros bar (28000400) | LF | 825 | $3.85 | $4.00 | $4.00 |
| 23 | Inlet filters (28000510) | EACH | 237 | $275.00 | $200.00 | $200.00 |
| 24 | Sub gran mat B 4 (31101200) | SY | 6 | $100.00 | $50.00 | $110.00 |
| 25 | PCC base cse W 10 (35400500) | SY | 6 | $500.00 | $200.00 | $250.00 |
| 26 | Bit matls tack CT (40600290) | LB | 77,751 | $0.01 | $1.00 | $0.01 |
| 27 | Long joint sealant (40600370) | LF | 72,606 | $2.60 | $2.53 | $1.75 |
| 28 | Mix CR JTS flangewys (40600400) | TON | 218 | $0.01 | $50.00 | $80.00 |
| 29 | HMA surf rem butt JT (40600982) | SY | 514 | $0.01 | $0.01 | $20.00 |
| 30 | PCC surf rem butt JT (40600985) | SY | 3,110 | $0.01 | $0.01 | $22.00 |
| 31 | P HMA BC IL-4.75 N50 (40603200) | TON | 5,006 | $104.16 | $125.00 | $145.00 |
| 32 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 12,481 | $122.00 | $128.00 | $130.00 |
| 33 | Protective coat (42001300) | SY | 2,334 | $1.00 | $1.50 | $0.01 |
| 34 | PC conc sidewalk 5 (42400200) | SF | 7,616 | $10.00 | $10.00 | $13.00 |
| 35 | Detectable warnings (42400800) | SF | 498 | $30.00 | $36.00 | $38.00 |
| 36 | HMA surf rem 2 3/4 (44000160) | SY | 538 | $10.00 | $5.00 | $19.00 |
| 37 | Comb curb gutter rem (44000500) | LF | 891 | $12.00 | $10.00 | $7.00 |
| 38 | Sidewalk rem (44000600) | SF | 7,200 | $3.00 | $2.50 | $3.50 |
| 39 | Median removal (44003100) | SF | 316 | $3.50 | $30.00 | $5.80 |
| 40 | Median removal (PD) (44003510) | SF | 2,584 | $4.00 | $0.60 | $17.00 |
| 41 | CL D patch T1 10 (44201761) | SY | 640 | $110.00 | $29.00 | $165.00 |
| 42 | CL D patch T2 10 (44201765) | SY | 1,277 | $105.00 | $29.00 | $160.00 |
| 43 | CL D patch T3 10 (44201769) | SY | 1,912 | $100.00 | $29.00 | $155.00 |
| 44 | CL D patch T4 10 (44201771) | SY | 2,550 | $95.00 | $29.00 | $155.00 |
| 45 | Man reconst (60257900) | EACH | 3 | $2,500.00 | $1,250.00 | $1,250.00 |
| 46 | Inlets reconst (60262700) | EACH | 16 | $2,000.00 | $850.00 | $850.00 |
| 47 | FR & grates adjust (60300105) | EACH | 10 | $500.00 | $450.00 | $450.00 |
| 48 | FR & lids adjust (60300305) | EACH | 10 | $500.00 | $550.00 | $550.00 |
| 49 | FR & grates T24 (60404950) | EACH | 10 | $600.00 | $485.00 | $485.00 |
| 50 | FR & lids T1 OL (60406000) | EACH | 5 | $600.00 | $450.00 | $450.00 |
| 51 | FR & lids T1 CL (60406100) | EACH | 5 | $600.00 | $450.00 | $450.00 |
| 52 | Comb CC&G TB6.12 (60603800) | LF | 299 | $40.00 | $42.00 | $65.00 |
| 53 | Comb CC&G TY B-6.24 (60605000) | LF | 592 | $40.00 | $48.00 | $66.00 |
| 54 | Conc median surf 4 (60618300) | SF | 673 | $12.00 | $15.00 | $12.00 |
| 55 | Conc med TSB6.24 (60620000) | SF | 221 | $30.00 | $25.00 | $44.00 |
| 56 | Non SPL waste disposl (66900200) | CY | 95 | $100.00 | $93.66 | $85.00 |
| 57 | Soil disposal analy (66900530) | EACH | 3 | $1,750.00 | $800.00 | $1,280.00 |
| 58 | Reg sub P-const plan (66901001) | LS | 1 | $2,250.00 | $5,600.00 | $3,500.00 |
| 59 | Reg sub F con report (66901003) | LS | 1 | $2,250.00 | $500.00 | $1,000.00 |
| 60 | Reg sub mon (66901006) | CAL DAY | 3 | $1,000.00 | $715.00 | $1,200.00 |
| 61 | Mobilization (67100100) | LS | 1 | $140,000 | $293,000 | $228,000 |
| 62 | TR cont & prot 701601 (70102630) | LS | 1 | $81,500 | $371,357 | $360,000 |
| 63 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 | $6,422.00 | $9,000.00 |
| 64 | TR cont & prot 701801 (70102640) | LS | 1 | $0.01 | $6,422.00 | $9,000.00 |
| 65 | Short term pavt mking (70300100) | LF | 27,022 | $0.01 | $0.01 | $1.20 |
| 66 | SHRT TRM pavt MK rem (70300150) | SF | 9,008 | $0.01 | $0.01 | $3.80 |
| 67 | Temp PVT MK LTR & sym paint (70300211) | SF | 4,809 | $0.01 | $1.75 | $0.01 |
| 68 | Temp PVT MK line 4 - paint (70300221) | LF | 25,049 | $0.01 | $0.35 | $0.01 |
| 69 | Temp PVT MK line 6 - paint (70300241) | LF | 18,809 | $0.01 | $0.53 | $0.01 |
| 70 | Temp PVT MK line 8 - paint (70300251) | LF | 10,411 | $0.01 | $0.70 | $0.01 |
| 71 | Temp PVT MK line 12 - paint (70300261) | LF | 9,951 | $0.01 | $1.06 | $0.01 |
| 72 | Temp PVT MK line 24 - paint (70300281) | LF | 2,862 | $0.01 | $1.60 | $0.01 |
| 73 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,703 | $0.01 | $1.20 | $3.00 |
| 74 | THPL PVT MK LTR & sym (78000100) | SF | 2,405 | $5.94 | $5.05 | $6.00 |
| 75 | THPL PVT MK line 4 (78000200) | LF | 2,073 | $0.99 | $0.98 | $0.75 |
| 76 | THPL PVT MK line 6 (78000400) | LF | 9,208 | $1.49 | $1.30 | $1.00 |
| 77 | THPL PVT MK line 8 (78000500) | LF | 5,206 | $1.98 | $1.60 | $2.00 |
| 78 | THPL PVT MK line 12 (78000600) | LF | 4,976 | $2.97 | $2.51 | $3.00 |
| 79 | THPL PVT MK line 24 (78000650) | LF | 1,431 | $5.94 | $5.05 | $6.00 |
| 80 | Pref PL PM TD STD L 6 (78004630) | LF | 10,452 | $7.21 | $6.50 | $6.00 |
| 81 | GRV RCSD PVT MRKG 7 (78011035) | LF | 10,452 | $0.61 | $0.75 | $1.00 |
| 82 | Raised refl pavt MKR (78100100) | EACH | 313 | $46.48 | $40.50 | $40.00 |
| 83 | Raised ref PVT MK rem (78300200) | EACH | 313 | $10.00 | $22.08 | $0.01 |
| 84 | Undrgrd C galvs 2 (81028200) | LF | 92 | $168.87 | $153.52 | $153.52 |
| 85 | Main EX TR sig instal (85000200) | EACH | 7 | $1,770.09 | $1,609.17 | $1,609.17 |
| 86 | Elcbl C signal 14 2C (87301215) | LF | 2,347 | $3.77 | $3.43 | $3.43 |
| 87 | Elcbl C signal 14 3C (87301225) | LF | 1,693 | $3.99 | $3.63 | $3.63 |
| 88 | Elcbl C lead 14 1PR (87301305) | LF | 5,417 | $3.98 | $3.62 | $3.62 |
| 89 | Elcbl C egrdc 6 1C (87301900) | LF | 197 | $4.66 | $4.24 | $4.24 |
| 90 | Drill EX handhole (87900200) | EACH | 10 | $490.11 | $445.55 | $445.55 |
| 91 | Ped SH LED 1F BM CDT (88102717) | EACH | 8 | $688.33 | $625.75 | $625.75 |
| 92 | Inductive loop detect (88500100) | EACH | 12 | $235.40 | $214.00 | $214.00 |
| 93 | Reloc EX TS post (89501150) | EACH | 1 | $296.10 | $269.18 | $269.18 |
| 94 | Rem elcbl FR con (89502300) | LF | 1,331 | $0.15 | $0.14 | $0.14 |
| 95 | Remov EX TS equip (89502375) | EACH | 6 | $99.29 | $90.26 | $90.26 |
| 96 | Rebuild EX handhole (89502376) | EACH | 1 | $2,467.30 | $2,243.60 | $2,243.60 |
| 97 | Rebld EX HH to HD HH (89502378) | EACH | 6 | $3,409.36 | $3,099.42 | $3,099.42 |
| 98 | Remov EX conc FDN (89502385) | EACH | 1 | $495.42 | $450.38 | $450.38 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.