IDOT contract 93827 bid tabulation
Project Number:, section 18-00068-00-BT. Let by Illinois DOT on January 17, 2025, Menard, District 06. 5 bids received; low bid $1,454,080 by Laverdiere Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 38
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Laverdiere Construction, Inc. | $1,454,080 | Low |
| 2 | Kinney Contractors, Inc. | $1,701,163 | +17% |
| 3 | K. E. Vas Company | $1,755,058 | +21% |
| 4 | L. W. Rouland Trucking Service, Inc. | $1,757,575 | +21% |
| 5 | P. H. Broughton & Sons, Inc. | $1,986,216 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Laverdiere Construction, Inc. | 2. Kinney Contractors, Inc. | 3. K. E. Vas Company | 4. L. W. Rouland Trucking Service, Inc. | 5. P. H. Broughton & Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Park benches (X0321158) | EACH | 1 | $2,700.00 | $6,150.00 | $6,000.00 | $5,700.00 | $9,286.88 |
| 2 | Bollard quick release (X0322135) | EACH | 7 | $1,290.00 | $1,550.00 | $2,500.00 | $2,400.00 | $1,416.94 |
| 3 | Conc parking blocks (X0323378) | EACH | 18 | $200.00 | $290.00 | $170.00 | $170.00 | $492.53 |
| 4 | Clearing & grubbing (X2010510) | LS | 1 | $40,000 | $28,000 | $35,000 | $35,000 | $40,485 |
| 5 | Seeding CL 2 SPL (X2501000) | ACRE | 5.20 | $4,913.00 | $5,000.00 | $4,000.00 | $6,075.00 | $6,848.55 |
| 6 | Aggregate SHLDS SPL (X4811800) | SY | 4,865 | $16.00 | $13.00 | $18.00 | $16.00 | $20.25 |
| 7 | Bicycle railing SPL (X5091725) | LF | 800 | $125.00 | $98.00 | $110.00 | $111.00 | $129.89 |
| 8 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $7,200.00 | $27,000 | $15,000 | $17,000 | $17,712 |
| 9 | Bicycle racks (Z0003855) | EACH | 1 | $3,200.00 | $5,500.00 | $4,500.00 | $4,455.00 | $3,019.44 |
| 10 | Bollards (Z0004002) | EACH | 18 | $925.00 | $900.00 | $1,850.00 | $1,850.00 | $1,032.60 |
| 11 | Construction layout (Z0013798) | LS | 1 | $16,500 | $13,500 | $25,000 | $28,720 | $82,545 |
| 12 | Earth excavation (20200100) | CY | 8,934 | $32.40 | $43.25 | $53.00 | $53.00 | $65.10 |
| 13 | Trench backfill (20800150) | CY | 21 | $200.00 | $86.00 | $89.00 | $90.00 | $238.37 |
| 14 | Temp eros contr seed (28000250) | LB | 514 | $5.00 | $1.00 | $5.00 | $5.00 | $4.14 |
| 15 | Temp ditch checks (28000305) | LF | 100 | $10.00 | $22.00 | $24.00 | $24.00 | $49.60 |
| 16 | Perimeter eros bar (28000400) | LF | 500 | $4.50 | $5.00 | $5.00 | $4.35 | $6.01 |
| 17 | Inlet & pipe protect (28000500) | EACH | 6 | $180.00 | $285.00 | $315.00 | $315.00 | $361.58 |
| 18 | Agg base cse B 6 (35101800) | SY | 16,848 | $17.00 | $23.75 | $20.00 | $18.00 | $25.18 |
| 19 | Agg base cse B 8 (35102000) | SY | 920 | $27.00 | $34.00 | $32.00 | $30.00 | $32.66 |
| 20 | Bit matls tack CT (40600290) | LB | 189 | $6.00 | $5.00 | $20.00 | $21.00 | $14.20 |
| 21 | HMA BC IL-19.0 N50 (40603080) | TON | 124 | $235.00 | $210.00 | $215.00 | $218.00 | $161.23 |
| 22 | HMA SC IL-9.5 C N50 (40604050) | TON | 2,109 | $166.00 | $155.00 | $170.00 | $172.00 | $140.97 |
| 23 | Welded wire reinf (42000060) | SY | 210 | $11.00 | $23.00 | $20.00 | $20.00 | $21.26 |
| 24 | PC conc sidewalk 8 (42400410) | SF | 1,886 | $17.00 | $24.50 | $32.00 | $32.00 | $23.21 |
| 25 | Detectable warnings (42400800) | SF | 248 | $45.00 | $40.00 | $47.00 | $47.00 | $93.43 |
| 26 | Aggregate SHLDS B 4 (48101498) | SY | 82 | $26.00 | $55.00 | $25.00 | $60.00 | $22.69 |
| 27 | Conc rem (50102400) | CY | 2 | $1,300.00 | $450.00 | $1,000.00 | $1,200.00 | $1,000.00 |
| 28 | Pipe culvert remov (50105220) | LF | 62 | $25.00 | $36.00 | $15.00 | $38.00 | $36.11 |
| 29 | P cul CL A 1 18 (542A0223) | LF | 168 | $110.00 | $144.00 | $143.00 | $135.00 | $140.52 |
| 30 | PRC flar end sec 18 (54213663) | EACH | 12 | $1,800.00 | $2,280.00 | $2,000.00 | $1,850.00 | $3,085.87 |
| 31 | Mobilization (67100100) | LS | 1 | $37,500 | $98,000 | $25,000 | $49,898 | $15,485 |
| 32 | Sign panel T1 (72000100) | SF | 108 | $54.00 | $41.00 | $45.00 | $45.50 | $53.14 |
| 33 | Sign panel T2 (72000200) | SF | 38 | $63.00 | $71.00 | $52.00 | $53.00 | $61.40 |
| 34 | Object marker T4 (72500400) | EACH | 2 | $192.00 | $400.00 | $160.00 | $162.00 | $188.93 |
| 35 | Teles STL sin support (72800100) | LF | 422 | $36.00 | $28.00 | $30.00 | $31.00 | $35.42 |
| 36 | PT PVT MK LTRS & symb (78001100) | SF | 66 | $13.75 | $18.00 | $11.00 | $20.00 | $37.79 |
| 37 | Paint PVT MK line 4 (78001110) | LF | 1,038 | $4.31 | $1.25 | $3.50 | $3.00 | $3.54 |
| 38 | Paint PVT MK line 24 (78001180) | LF | 42 | $25.00 | $7.00 | $20.00 | $20.00 | $33.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.