IDOT contract 93843 bid tabulation
Project Number: 8Llm-141 / /, section 21-00056-09-PV. Let by Illinois DOT on November 7, 2025, Menard, District 06. 4 bids received; low bid $2,121,212 by L. W. Rouland Trucking Service, Inc..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 37
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | L. W. Rouland Trucking Service, Inc. | $2,121,212 | Low |
| 2 | K. E. Vas Company | $2,214,003 | +4.0% |
| 3 | Illinois Valley Paving, a div of UCM, Inc. | $2,251,988 | +6.0% |
| 4 | P. H. Broughton & Sons, Inc. | $2,492,957 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L. W. Rouland Trucking Service, Inc. | 2. K. E. Vas Company | 3. Illinois Valley Paving, a div of UCM, Inc. | 4. P. H. Broughton & Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Seeding CL 2 SPL (X2501000) | ACRE | 9.50 | $3,650.00 | $3,375.00 | $2,992.50 | $9,438.55 |
| 2 | Gran culvert backfill (X5020108) | CY | 544 | $95.00 | $95.00 | $187.70 | $133.53 |
| 3 | Fence removal (X6640104) | LF | 1,208 | $5.00 | $5.00 | $6.49 | $8.26 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $22,450 | $55,000 | $25,096 | $66,148 |
| 5 | Construction layout (Z0013798) | LS | 1 | $19,053 | $25,000 | $14,118 | $15,016 |
| 6 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 | $0.80 |
| 7 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 8 | Tree remov over 15 (20100210) | UNIT | 66 | $170.00 | $310.00 | $134.73 | $144.80 |
| 9 | Tree remov acres (20100500) | ACRE | 5.50 | $15,900 | $24,750 | $14,055 | $35,395 |
| 10 | Earth excavation (20200100) | CY | 19,059 | $15.00 | $16.00 | $11.85 | $11.80 |
| 11 | Furnished excavation (20400800) | CY | 4,089 | $1.00 | $1.00 | $33.44 | $20.38 |
| 12 | Temp eros contr seed (28000250) | LB | 950 | $3.30 | $4.50 | $9.70 | $5.36 |
| 13 | Temp ditch checks (28000305) | LF | 298 | $20.00 | $20.00 | $21.16 | $15.55 |
| 14 | Perimeter eros bar (28000400) | LF | 1,467 | $4.00 | $4.00 | $6.18 | $4.29 |
| 15 | Inlet & pipe protect (28000500) | EACH | 6 | $310.00 | $310.00 | $710.47 | $134.07 |
| 16 | Stone riprap CL A4 (28100207) | TON | 1,775 | $95.00 | $95.00 | $124.01 | $110.62 |
| 17 | HMA BC wid 6 (35600700) | SY | 2,635 | $62.00 | $62.00 | $54.90 | $86.40 |
| 18 | Bit matls tack CT (40600290) | LB | 7,512 | $2.00 | $2.00 | $0.91 | $1.00 |
| 19 | HMA surf rem butt JT (40600982) | SY | 4,825 | $7.00 | $7.00 | $7.48 | $6.77 |
| 20 | HMA BC IL-19.0 N50 (40603080) | TON | 2,791 | $142.00 | $146.00 | $146.61 | $125.33 |
| 21 | HMA SC IL-9.5 C N50 (40604050) | TON | 957 | $155.00 | $159.00 | $137.26 | $128.57 |
| 22 | Pavement rem (44000100) | SY | 338 | $20.00 | $20.00 | $25.15 | $77.46 |
| 23 | Aggregate SHLDS A (48100100) | TON | 2,385 | $49.00 | $49.00 | $44.94 | $62.29 |
| 24 | Pipe culvert remov (50105220) | LF | 378 | $55.00 | $55.00 | $48.92 | $29.50 |
| 25 | Box cul end sec C1 (54001001) | EACH | 2 | $44,500 | $44,500 | $45,103 | $46,656 |
| 26 | PCBC 9X9 (54010909) | LF | 100 | $1,925.00 | $1,925.00 | $1,901.84 | $1,900.58 |
| 27 | P cul CL A 1 24 (542A0229) | LF | 138 | $145.00 | $145.00 | $228.15 | $108.33 |
| 28 | P cul CL A 2 24 (542A1069) | LF | 112 | $156.00 | $156.00 | $211.43 | $122.27 |
| 29 | P cul CL D 1 24 (542D0229) | LF | 128 | $120.00 | $120.00 | $57.47 | $78.30 |
| 30 | PRC flar end sec 24 (54213669) | EACH | 6 | $2,370.00 | $2,370.00 | $3,164.68 | $1,608.84 |
| 31 | Metal FL end sec 24" (54262724) | EACH | 4 | $790.00 | $790.00 | $1,040.87 | $697.17 |
| 32 | Contr low-streng matl (59300100) | CY | 85 | $180.00 | $180.00 | $226.02 | $257.41 |
| 33 | Guardrail remov (63200310) | LF | 1,269 | $7.50 | $7.50 | $5.03 | $13.76 |
| 34 | Fur erect row markers (66600105) | EACH | 31 | $220.00 | $220.00 | $360.55 | $285.00 |
| 35 | Mobilization (67100100) | LS | 1 | $62,000 | $30,000 | $52,583 | $125,355 |
| 36 | Changeable message SN (70107025) | CAL DAY | 840 | $55.00 | $50.00 | $46.20 | $69.72 |
| 37 | Paint PVT MK line 4 (78001110) | LF | 15,405 | $0.30 | $0.30 | $0.28 | $0.32 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.