IDOT contract 97771 bid tabulation
Project Number: 267A-069 / /, section 18-00276-06-PP. Let by Illinois DOT on June 13, 2025, St. Clair, District 08. 2 bids received; low bid $691,627 by Kinney Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 15
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kinney Contractors, Inc. | $691,627 | Low |
| 2 | Keeley & Sons, Inc. | $822,502 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kinney Contractors, Inc. | 2. Keeley & Sons, Inc. |
|---|---|---|---|---|---|
| 1 | Pavement fabric SPL (X4201650) | SY | 275 | $20.00 | $10.80 |
| 2 | Traf cont & prot SPL (X7010216) | LS | 1 | $65,000 | $19,855 |
| 3 | Comb curb gutter rem (44000500) | LF | 50 | $25.00 | $53.85 |
| 4 | CL B patch T2 8 (44200934) | SY | 1,815 | $194.00 | $237.15 |
| 5 | CL B patch T4 8 (44200944) | SY | 275 | $190.00 | $237.15 |
| 6 | Dowel bars 1 1/4 (44201298) | EACH | 4,826 | $19.00 | $27.10 |
| 7 | Saw cuts (44213200) | LF | 10,113 | $5.00 | $9.99 |
| 8 | Tie bars 3/4 (44213204) | EACH | 122 | $18.00 | $23.15 |
| 9 | Comb CC&G TY B-6.24 (60605000) | LF | 50 | $100.00 | $77.80 |
| 10 | Mobilization (67100100) | LS | 1 | $42,000 | $43,185 |
| 11 | PT PVT MK LTRS & symb (78001100) | SF | 141 | $7.10 | $13.26 |
| 12 | Paint PVT MK line 4 (78001110) | LF | 54,262 | $0.24 | $0.14 |
| 13 | Paint PVT MK line 12 (78001150) | LF | 248 | $5.10 | $12.50 |
| 14 | Paint PVT MK line 24 (78001180) | LF | 112 | $6.90 | $16.83 |
| 15 | Raised refl pavt MKR (78100100) | EACH | 100 | $80.00 | $51.77 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.