INDOT contract B-43242-A bid tabulation
BRIDGE THIN DECK OVERLAY. Let by Indiana DOT on February 11, 2026, Daviess, Greene, Pike, Vincennes. 6 bids received; low bid $7,042,908 by CLR Inc.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 154
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | CLR Inc | $7,042,908 | Low |
| 2 | Ram Construction Services of Michigan, Inc. | $7,426,081 | +5.0% |
| 3 | Rieth-Riley Construction Co., Inc. | $8,233,753 | +17% |
| 4 | E & B Paving LLC | $8,992,265 | +28% |
| 5 | American Contracting & Services Inc | $9,115,389 | +29% |
| 6 | Enneking Pressure Cleaning Inc | $9,773,638 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. CLR Inc | 2. Ram Construction Services of Michigan, Inc. | 3. Rieth-Riley Construction Co., Inc. | 4. E & B Paving LLC | 5. American Contracting & Services Inc | 6. Enneking Pressure Cleaning Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $300,000 | $10,000 | $25,000 | $40,000 | $35,000 | $15,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $352,000 | $427,350 | $323,360 | $449,613 | $455,769 | $1,075,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $140,800 | $20,000 | $11,550 | $89,922 | $10,000 | $10,000 |
| 0012 | Pavement removal (202-02240) | SYS | 948 | $59.00 | $55.00 | $54.93 | $60.00 | $70.00 | $55.00 |
| 0013 | Curb, concrete, remove (202-02278) | LFT | 20 | $80.00 | $95.00 | $117.53 | $250.00 | $55.00 | $95.00 |
| 0014 | Bridge railing, remove (202-62420) | LFT | 40 | $350.00 | $120.00 | $576.27 | $1,000.00 | $190.00 | $120.00 |
| 0015 | Linear grading (203-08607) | LFT | 262.50 | $45.00 | $22.40 | $6.17 | $55.00 | $30.00 | $20.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 19,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $7,500.00 | $1,000.00 | $97,094 | $60,000 | $25,000 | $40,000 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 494 | $135.00 | $68.00 | $113.37 | $160.00 | $90.00 | $68.00 |
| 0019 | Flowable backfill, non- removable (213-09269) | CYS | 428 | $136.00 | $100.00 | $494.86 | $400.00 | $430.00 | $1,000.00 |
| 0020 | Flowable backfill, removable (213-09270) | CYS | 132 | $129.00 | $100.00 | $586.87 | $400.00 | $425.00 | $1,000.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 494 | $15.00 | $8.00 | $5.53 | $11.00 | $10.00 | $8.00 |
| 0022 | Compacted aggregate, no. 53 (301-12234) | CYS | 80 | $170.00 | $130.00 | $257.72 | $250.00 | $150.00 | $130.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 92 | $85.00 | $80.00 | $322.30 | $170.00 | $65.00 | $80.00 |
| 0024 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 4,636 | $3.45 | $2.25 | $8.18 | $4.00 | $7.00 | $6.00 |
| 0025 | Lean concrete base, 9 in. (309-12695) | SYS | 468 | $97.00 | $145.00 | $90.85 | $120.00 | $125.00 | $145.00 |
| 0026 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 422 | $170.00 | $170.00 | $216.13 | $170.00 | $170.00 | $170.00 |
| 0027 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 66 | $300.00 | $276.00 | $337.06 | $276.00 | $276.00 | $276.00 |
| 0028 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 284 | $235.00 | $217.00 | $194.52 | $217.00 | $217.00 | $217.00 |
| 0029 | Joint adhesive (401-11526) | LFT | 3,360 | $0.50 | $0.50 | $0.93 | $0.50 | $0.50 | $0.50 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 4,214 | $0.30 | $0.30 | $0.26 | $0.30 | $0.30 | $0.30 |
| 0032 | Terminal joint, retrofit polymer modified asphalt (503-12480) | SFT | 3,032 | $99.00 | $97.24 | $187.29 | $72.84 | $155.00 | $72.84 |
| 0033 | Joints in PCCP, saw and seal (507-08272) | LFT | 4,093 | $17.00 | $12.00 | $1.79 | $12.50 | $16.00 | $15.00 |
| 0034 | Guardrail, remove (601-02241) | LFT | 237 | $13.00 | $5.00 | $12.00 | $12.00 | $12.00 | $5.00 |
| 0035 | Guardrail height transition, MGS (601-12289) | EACH | 3 | $950.00 | $1,286.00 | $865.00 | $865.00 | $865.00 | $1,286.00 |
| 0036 | Guardrail transition, MGS without curb (601-12292) | EACH | 3 | $3,500.00 | $3,306.00 | $3,175.00 | $3,175.00 | $3,175.00 | $3,306.00 |
| 0037 | Barrier delineator (602-06729) | EACH | 18 | $125.00 | $50.00 | $65.32 | $60.00 | $50.00 | $25.00 |
| 0038 | Curb, concrete , modified (605-06120) | LFT | 50 | $240.00 | $115.00 | $133.23 | $400.00 | $240.00 | $115.00 |
| 0039 | Milled HMA corrugations, conventional (606-12399) | LFT | 1,120 | $7.50 | $4.95 | $21.52 | $9.40 | $10.00 | $15.00 |
| 0040 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 484 | $255.00 | $255.00 | $243.94 | $550.00 | $300.00 | $255.00 |
| 0041 | Riprap, revetment (616-06405) | TON | 126 | $155.00 | $275.57 | $369.22 | $240.00 | $200.00 | $500.00 |
| 0042 | Geotextile for riprap, type 1A (616-12246) | SYS | 168 | $20.00 | $22.26 | $4.24 | $23.00 | $8.00 | $6.00 |
| 0043 | Clean drains (619-98427) | EACH | 196 | $25.00 | $25.00 | $420.92 | $25.00 | $100.00 | $50.00 |
| 0044 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $275.00 | $100.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0045 | Mulched seeding, type R (621-06559) | SYS | 276 | $15.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0046 | Sodding (621-06574) | SYS | 22 | $10.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 0047 | Computer system equipment (628-11976) | EACH | 2 | $95.00 | $1.00 | $1,306.47 | $1,000.00 | $1,500.00 | $1,400.00 |
| 0048 | Field office, type D (628-12683) | MOS | 16 | $1,200.00 | $1,000.00 | $4,703.29 | $4,500.00 | $6,000.00 | $4,500.00 |
| 0049 | Reinforcing bars, epoxy coated (703-06029) | LBS | 30,371 | $1.55 | $2.50 | $2.11 | $3.00 | $1.60 | $2.50 |
| 0050 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 272 | $40.00 | $65.00 | $76.93 | $40.00 | $50.00 | $65.00 |
| 0051 | Concrete, C, superstructure (704-51002) | CYS | 3.10 | $5,025.00 | $5,300.00 | $14,252 | $18,000 | $5,400.00 | $5,300.00 |
| 0052 | Deck drain (704-51106) | EACH | 3 | $2,600.00 | $3,161.84 | $1,411.05 | $3,000.00 | $1,500.00 | $2,000.00 |
| 0053 | Concrete bridge railing transition, type TFT (706-11621) | EACH | 4 | $4,500.00 | $5,500.00 | $5,676.99 | $10,000 | $6,500.00 | $5,500.00 |
| 0054 | Surface seal , bridge no. 01 (709-51821) | LS | 1 | $9,000.00 | $6,380.00 | $6,827.00 | $5,774.29 | $17,000 | $5,774.29 |
| 0055 | Surface seal , bridge no. 02 (709-51821) | LS | 1 | $9,000.00 | $6,380.00 | $6,827.00 | $5,774.29 | $17,000 | $5,774.29 |
| 0056 | Surface seal , bridge no. 03 (709-51821) | LS | 1 | $9,000.00 | $5,977.00 | $6,395.00 | $5,409.55 | $16,000 | $5,409.55 |
| 0057 | Surface seal , bridge no. 04 (709-51821) | LS | 1 | $7,500.00 | $4,843.00 | $5,182.00 | $4,383.21 | $13,000 | $4,383.21 |
| 0058 | Surface seal , bridge no. 05 (709-51821) | LS | 1 | $4,000.00 | $2,506.00 | $2,681.00 | $2,268.08 | $6,500.00 | $2,268.08 |
| 0059 | Surface seal , bridge no. 06 (709-51821) | LS | 1 | $4,000.00 | $2,506.00 | $2,681.00 | $2,268.08 | $6,500.00 | $2,268.08 |
| 0060 | Surface seal , bridge no. 07 (709-51821) | LS | 1 | $10,000 | $8,713.00 | $9,323.00 | $7,885.80 | $20,000 | $7,885.80 |
| 0061 | Surface seal , bridge no. 08 (709-51821) | LS | 1 | $10,000 | $8,713.00 | $9,323.00 | $7,885.80 | $20,000 | $7,885.80 |
| 0062 | Surface seal , bridge no. 09 (709-51821) | LS | 1 | $7,500.00 | $4,324.00 | $4,627.00 | $3,913.49 | $11,000 | $3,913.49 |
| 0063 | Surface seal , bridge no. 10 (709-51821) | LS | 1 | $7,500.00 | $4,324.00 | $4,627.00 | $3,913.49 | $11,000 | $3,913.49 |
| 0064 | Surface seal , bridge no. 11 (709-51821) | LS | 1 | $8,000.00 | $5,031.00 | $5,383.00 | $4,553.36 | $13,000 | $4,553.36 |
| 0065 | Surface seal , bridge no. 12 (709-51821) | LS | 1 | $8,500.00 | $5,866.00 | $6,276.00 | $5,309.09 | $16,000 | $5,309.09 |
| 0066 | Surface seal , bridge no. 13 (709-51821) | LS | 1 | $4,000.00 | $2,705.00 | $2,894.00 | $2,448.19 | $7,000.00 | $2,448.19 |
| 0067 | Surface seal , bridge no. 14 (709-51821) | LS | 1 | $4,000.00 | $2,705.00 | $2,894.00 | $2,448.19 | $7,000.00 | $2,448.19 |
| 0068 | Surface seal , bridge no. 15 (709-51821) | LS | 1 | $7,500.00 | $4,522.00 | $4,838.00 | $4,092.69 | $12,000 | $4,092.69 |
| 0069 | Surface seal , bridge no. 16 (709-51821) | LS | 1 | $7,000.00 | $3,628.00 | $3,881.00 | $3,283.56 | $9,500.00 | $3,283.56 |
| 0070 | Surface seal , bridge no. 17 (709-51821) | LS | 1 | $7,500.00 | $4,476.00 | $4,789.00 | $4,051.06 | $12,000 | $4,051.06 |
| 0071 | Surface seal , bridge no. 18 (709-51821) | LS | 1 | $7,000.00 | $3,421.00 | $3,660.00 | $3,096.22 | $9,000.00 | $3,096.22 |
| 0072 | Surface seal , bridge no. 19 (709-51821) | LS | 1 | $4,000.00 | $2,444.00 | $2,615.00 | $2,211.97 | $6,500.00 | $2,211.97 |
| 0073 | Surface seal , bridge no. 20 (709-51821) | LS | 1 | $7,000.00 | $3,421.00 | $3,660.00 | $3,096.22 | $9,000.00 | $3,096.22 |
| 0074 | Surface seal , bridge no. 21 (709-51821) | LS | 1 | $25,000 | $23,011 | $24,621 | $20,826 | $55,000 | $20,826 |
| 0075 | Surface seal , bridge no. 22 (709-51821) | LS | 1 | $25,000 | $23,011 | $24,621 | $20,826 | $55,000 | $20,826 |
| 0076 | Surface seal , bridge no. 23 (709-51821) | LS | 1 | $7,000.00 | $3,284.00 | $3,513.00 | $2,972.22 | $8,500.00 | $2,972.22 |
| 0077 | Surface seal , bridge no. 24 (709-51821) | LS | 1 | $7,000.00 | $3,284.00 | $3,513.00 | $2,972.22 | $8,500.00 | $2,972.22 |
| 0078 | Surface seal , bridge no. 25 (709-51821) | LS | 1 | $4,000.00 | $2,479.00 | $2,652.00 | $2,243.65 | $6,500.00 | $2,243.65 |
| 0079 | Surface seal , bridge no. 26 (709-51821) | LS | 1 | $9,000.00 | $7,006.00 | $7,496.00 | $6,340.86 | $17,000 | $6,340.86 |
| 0080 | Surface seal , bridge no. 27 (709-51821) | LS | 1 | $9,000.00 | $6,939.00 | $7,424.00 | $6,280.22 | $16,000 | $6,280.22 |
| 0081 | Surface seal , bridge no. 28 (709-51821) | LS | 1 | $4,000.00 | $2,479.00 | $2,652.00 | $2,243.65 | $6,500.00 | $2,243.65 |
| 0082 | Surface seal , bridge no. 29 (709-51821) | LS | 1 | $4,000.00 | $2,750.00 | $2,942.00 | $2,488.92 | $7,000.00 | $2,488.92 |
| 0083 | Surface seal , bridge no. 30 (709-51821) | LS | 1 | $4,000.00 | $2,750.00 | $2,942.00 | $2,488.92 | $7,000.00 | $2,488.92 |
| 0084 | Surface seal , bridge no. 31 (709-51821) | LS | 1 | $7,000.00 | $4,078.00 | $4,363.00 | $3,690.84 | $10,000 | $3,690.84 |
| 0085 | Surface seal , bridge no. 32 (709-51821) | LS | 1 | $4,000.00 | $2,194.00 | $2,647.00 | $1,985.70 | $5,500.00 | $1,985.70 |
| 0086 | Surface seal , bridge no. 33 (709-51821) | LS | 1 | $9,000.00 | $6,985.00 | $7,473.00 | $6,321.85 | $17,000 | $6,321.85 |
| 0087 | Surface seal , bridge no. 34 (709-51821) | LS | 1 | $9,000.00 | $6,985.00 | $7,452.00 | $6,303.75 | $17,000 | $6,303.75 |
| 0088 | Surface seal , bridge no. 35 (709-51821) | LS | 1 | $4,000.00 | $1,491.00 | $1,595.00 | $1,349.45 | $4,000.00 | $1,349.45 |
| 0089 | Surface seal , bridge no. 36 (709-51821) | LS | 1 | $4,000.00 | $1,491.00 | $1,595.00 | $1,349.45 | $4,000.00 | $1,349.45 |
| 0090 | Surface seal , bridge no. 37 (709-51821) | LS | 1 | $4,000.00 | $1,818.00 | $1,945.00 | $1,645.40 | $4,500.00 | $1,645.40 |
| 0091 | Surface seal , bridge no. 38 (709-51821) | LS | 1 | $4,000.00 | $1,818.00 | $1,945.00 | $1,645.40 | $4,500.00 | $1,645.40 |
| 0092 | Surface seal , bridge no. 39 (709-51821) | LS | 1 | $40,000 | $37,281 | $39,890 | $33,742 | $90,000 | $33,742 |
| 0093 | Surface seal , bridge no. 40 (709-51821) | LS | 1 | $40,000 | $37,281 | $39,890 | $33,742 | $90,000 | $33,742 |
| 0094 | Surface seal , bridge no. 41 (709-51821) | LS | 1 | $19,000 | $15,489 | $16,573 | $14,019 | $40,000 | $14,019 |
| 0095 | Surface seal , bridge no. 42 (709-51821) | LS | 1 | $19,000 | $15,489 | $16,573 | $14,019 | $40,000 | $14,019 |
| 0096 | Surface seal , bridge no. 43 (709-51821) | LS | 1 | $7,000.00 | $1,590.00 | $4,016.00 | $3,397.60 | $9,500.00 | $3,397.60 |
| 0097 | Surface seal , bridge no. 44 (709-51821) | LS | 1 | $4,000.00 | $3,754.00 | $1,701.00 | $1,439.05 | $4,500.00 | $1,439.05 |
| 0098 | Patching concrete structures (710-09158) | SFT | 313 | $93.00 | $203.60 | $87.00 | $50.00 | $275.00 | $50.00 |
| 0099 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 120 | $42.00 | $50.00 | $63.06 | $50.00 | $50.00 | $50.00 |
| 0100 | Pipe, bridge deck drain system , bridge no. 39 (715-09938) | LS | 1 | $8,100.00 | $16,560 | $15,052 | $40,000 | $9,000.00 | $50,000 |
| 0101 | Pipe, bridge deck drain system , bridge no. 40 (715-09938) | LS | 1 | $8,400.00 | $16,560 | $15,052 | $40,000 | $9,000.00 | $50,000 |
| 0102 | Pipe, bridge deck drain system , bridge no. 41 (715-09938) | LS | 1 | $8,400.00 | $16,560 | $28,439 | $40,000 | $11,000 | $50,000 |
| 0103 | Pipe, bridge deck drain system , bridge no. 42 (715-09938) | LS | 1 | $8,400.00 | $16,560 | $28,439 | $40,000 | $11,000 | $50,000 |
| 0104 | Pipe, bridge deck drain system , clean bridge no. 11 (715-09938) | LS | 1 | $5,000.00 | $1,150.00 | $6,203.19 | $1,500.00 | $5,000.00 | $1,500.00 |
| 0105 | Pipe, bridge deck drain system , clean bridge no. 12 (715-09938) | LS | 1 | $5,000.00 | $2,300.00 | $6,203.19 | $1,500.00 | $5,000.00 | $1,500.00 |
| 0106 | Pipe, bridge deck drain system , clean bridge no. 21 (715-09938) | LS | 1 | $3,000.00 | $4,600.00 | $6,203.19 | $3,000.00 | $19,000 | $3,000.00 |
| 0107 | Pipe, bridge deck drain system , clean bridge no. 22 (715-09938) | LS | 1 | $3,000.00 | $2,300.00 | $6,203.19 | $1,500.00 | $19,000 | $1,500.00 |
| 0108 | Pipe, bridge deck drain system , clean bridge no. 26 (715-09938) | LS | 1 | $1,500.00 | $1,150.00 | $6,203.19 | $1,000.00 | $8,000.00 | $1,000.00 |
| 0109 | Pipe, bridge deck drain system , clean bridge no. 39 (715-09938) | LS | 1 | $9,500.00 | $1,150.00 | $6,203.19 | $5,000.00 | $24,000 | $5,000.00 |
| 0110 | Pipe, bridge deck drain system , clean bridge no. 40 (715-09938) | LS | 1 | $9,500.00 | $10,750 | $6,203.19 | $5,000.00 | $24,000 | $5,000.00 |
| 0111 | Pipe, bridge deck drain system , clean bridge no. 41 (715-09938) | LS | 1 | $9,500.00 | $10,750 | $6,203.19 | $5,000.00 | $9,500.00 | $5,000.00 |
| 0112 | Pipe, bridge deck drain system , clean bridge no. 42 (715-09938) | LS | 1 | $9,500.00 | $10,750 | $6,203.19 | $5,000.00 | $9,500.00 | $5,000.00 |
| 0113 | Pipe, bridge deck drain system , clean, bridge no. 27 (715-09938) | LS | 1 | $1,500.00 | $1,150.00 | $6,203.19 | $1,500.00 | $8,000.00 | $1,500.00 |
| 0114 | Concrete anchor, diameter 24 in. (715-11446) | EACH | 1 | $4,500.00 | $12,750 | $3,061.68 | $6,500.00 | $4,000.00 | $8,000.00 |
| 0115 | Pipe, relaid, diameter 24 in. (715-98938) | LFT | 8 | $395.00 | $1,290.00 | $533.91 | $850.00 | $300.00 | $5,000.00 |
| 0116 | Geotextile for underdrains, type 1A (718-12305) | SYS | 56 | $25.00 | $25.00 | $3.13 | $14.00 | $10.00 | $25.00 |
| 0117 | Aggregate for underdrains (718-52610) | CYS | 8 | $400.00 | $160.00 | $114.32 | $425.00 | $250.00 | $160.00 |
| 0118 | Automatic drainage gate , 24 inch, reset (721-09548) | EACH | 1 | $2,000.00 | $2,880.00 | $4,029.63 | $2,000.00 | $1,000.00 | $5,000.00 |
| 0119 | Longitudinal grooving (722-12732) | SYS | 17,508 | $1.00 | $0.10 | $4.58 | $1.00 | $5.00 | $0.75 |
| 0120 | Bridge deck patching, full depth (722-51401) | SFT | 23 | $75.00 | $25.00 | $201.00 | $7.50 | $400.00 | $7.50 |
| 0121 | Bridge deck patching, partial depth (722-51852) | SFT | 3,364 | $2.50 | $2.00 | $5.00 | $2.50 | $70.00 | $2.50 |
| 0122 | Bridge expansion joint seal, type SS, replace (724-12777) | LFT | 176 | $105.00 | $192.80 | $205.57 | $250.00 | $60.00 | $180.00 |
| 0123 | Bridge expansion joint seal, type M, replace (724-12778) | LFT | 444 | $71.50 | $200.00 | $219.79 | $450.00 | $180.00 | $200.00 |
| 0124 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 15 | $25.00 | $25.00 | $50.00 | $20.00 | $75.00 | $20.00 |
| 0125 | Epoxy injection, crack preparation (727-90308) | LFT | 15 | $50.00 | $50.00 | $34.00 | $100.00 | $100.00 | $100.00 |
| 0126 | Epoxy injection, furnishing equipment , bridge no. 03 (727-93560) | LS | 1 | $1,050.00 | $500.00 | $200.00 | $500.00 | $1,200.00 | $500.00 |
| 0127 | Epoxy injection, furnishing equipment , bridge no. 04 (727-93560) | LS | 1 | $1,050.00 | $500.00 | $200.00 | $500.00 | $1,200.00 | $500.00 |
| 0128 | Epoxy injection, furnishing equipment , bridge no. 08 (727-93560) | LS | 1 | $1,050.00 | $500.00 | $200.00 | $500.00 | $1,200.00 | $500.00 |
| 0129 | Epoxy injection, furnishing equipment , bridge no. 37 (727-93560) | LS | 1 | $1,050.00 | $500.00 | $200.00 | $500.00 | $1,200.00 | $500.00 |
| 0130 | Epoxy injection, furnishing equipment , bridge no. 38 (727-93560) | LS | 1 | $1,050.00 | $500.00 | $200.00 | $500.00 | $1,200.00 | $500.00 |
| 0131 | Warranted polymer overlay, bridge deck (738-12855) | SYS | 70,498 | $33.75 | $34.50 | $32.66 | $35.15 | $40.00 | $40.28 |
| 0132 | Road closure sign assembly (801-04308) | EACH | 11 | $100.00 | $305.00 | $305.00 | $134.00 | $305.00 | $305.00 |
| 0133 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 747,907 | $1.00 | $1.00 | $1.30 | $0.75 | $1.30 | $1.30 |
| 0134 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 35 | $11.00 | $12.55 | $12.55 | $14.00 | $12.55 | $12.55 |
| 0135 | Detour route marker assembly (801-06625) | EACH | 118 | $55.00 | $130.00 | $130.00 | $143.00 | $130.00 | $130.00 |
| 0136 | Construction sign, type A (801-06640) | EACH | 461 | $150.00 | $175.00 | $175.00 | $180.00 | $175.00 | $175.00 |
| 0137 | Construction sign, type B (801-06645) | EACH | 50 | $75.00 | $100.00 | $100.00 | $58.00 | $100.00 | $100.00 |
| 0138 | Flashing arrow sign (801-06710) | DAY | 431 | $55.00 | $17.00 | $17.00 | $14.00 | $17.00 | $17.00 |
| 0139 | Maintaining traffic (801-06775) | LS | 1 | $709,301 | $1,407,356 | $971,341 | $2,025,000 | $909,000 | $1,738,828 |
| 0140 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $8,000.00 | $8,030.00 | $6,750.00 | $6,750.00 | $10,000 | $8,030.00 |
| 0141 | Barricade, type III-A (801-07118) | LFT | 372 | $6.00 | $17.00 | $17.00 | $8.00 | $17.00 | $17.00 |
| 0142 | Barricade, type III-B (801-07119) | LFT | 216 | $6.00 | $17.00 | $17.00 | $8.00 | $17.00 | $17.00 |
| 0143 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 3,880 | $45.00 | $40.00 | $75.88 | $60.00 | $50.00 | $40.00 |
| 0144 | Portable changeable message sign (801-11642) | EACH | 12 | $4,000.00 | $6,955.00 | $6,955.00 | $5,826.00 | $6,955.00 | $6,955.00 |
| 0145 | Truck mounted attenuator (801-12042) | DAY | 231 | $275.00 | $25.00 | $750.00 | $1,200.00 | $550.00 | $300.00 |
| 0146 | Temporary speed feedback assembly (801-12832) | EACH | 2 | $825.00 | $3,955.00 | $3,955.00 | $6,914.00 | $3,955.00 | $3,955.00 |
| 0147 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 60 | $225.00 | $955.00 | $955.00 | $3.00 | $955.00 | $955.00 |
| 0148 | Reference post (802-04893) | EACH | 44 | $125.00 | $551.00 | $455.00 | $180.00 | $455.00 | $551.00 |
| 0149 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 17,651 | $1.35 | $0.95 | $0.95 | $1.11 | $0.95 | $0.95 |
| 0150 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 17,552 | $1.35 | $0.95 | $0.95 | $1.11 | $0.95 | $0.95 |
| 0151 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 3,783 | $1.35 | $1.15 | $1.15 | $1.11 | $1.15 | $1.15 |
| 0153 | Prismatic reflector (808-75994) | EACH | 110 | $10.00 | $14.55 | $14.55 | $10.00 | $14.55 | $15.00 |
| 0154 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 50 | $50.00 | $25.00 | $25.00 | $50.00 | $50.00 | $50.00 |
| 0155 | Snowplowable raised pavement marker (808-75998) | EACH | 64 | $35.00 | $44.55 | $44.55 | $139.65 | $44.55 | $44.55 |
| 0156 | Terminal joint, type HMA (503-12477) | LFT | 164 | $510.00 | $400.00 | $457.37 | $500.00 | $500.00 | $400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.