INDOT contract B-43801-A bid tabulation
HMA OVERLAY, PREVENTIVE MAINTENANCE AND BRIDGE DECK OVERLAY. Let by Indiana DOT on September 10, 2025, Adams, Fort Wayne. 2 bids received; low bid $6,952,346 by Brooks Construction Company Inc.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 168
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Brooks Construction Company Inc | $6,952,346 | Low |
| 2 | E & B Paving LLC | $7,236,369 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brooks Construction Company Inc | 2. E & B Paving LLC |
|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $45,000 | $28,050 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 5 | $450.00 | $251.98 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 5 | $450.00 | $251.98 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0010 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 |
| 0011 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 |
| 0012 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0013 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0014 | Mobilization and demobilization (110-01001) | LS | 1 | $325,000 | $568,715 |
| 0015 | Clearing right-of-way (201-52370) | LS | 1 | $5,000.00 | $34,450 |
| 0016 | Debris, remove, structure no. 2 (201-90788) | LS | 1 | $30,000 | $20,000 |
| 0017 | Pavement removal (202-02240) | SYS | 2,744 | $35.00 | $35.00 |
| 0018 | Paved side ditch, remove (202-02272) | LFT | 40 | $35.00 | $50.00 |
| 0019 | Curb and gutter, remove (202-02279) | LFT | 398 | $15.00 | $15.00 |
| 0020 | Casting, remove (202-02772) | EACH | 1 | $1,100.00 | $600.00 |
| 0021 | Grated box end section, remove (202-02859) | EACH | 2 | $1,100.00 | $1,000.00 |
| 0022 | Testing for wastes, type C (202-07603) | EACH | 1 | $2,200.00 | $2,000.00 |
| 0023 | Sidewalk concrete, remove (202-52710) | SYS | 106 | $35.00 | $20.00 |
| 0024 | Detector housing, remove (202-90277) | EACH | 3 | $250.00 | $250.00 |
| 0025 | Inlet, remove (202-91385) | EACH | 1 | $300.00 | $750.00 |
| 0026 | Concrete, remove (202-93615) | SYS | 9 | $31.00 | $75.00 |
| 0027 | Pipe end section, remove (202-98488) | EACH | 2 | $110.00 | $250.00 |
| 0028 | Excavation, common (203-02000) | CYS | 217 | $110.00 | $55.00 |
| 0029 | Linear grading (203-08607) | LFT | 95,257 | $3.00 | $0.39 |
| 0030 | Temporary turbidity curtain (205-09387) | LFT | 340 | $50.00 | $40.00 |
| 0031 | Pump around (205-11626) | EACH | 4 | $4,000.00 | $11,250 |
| 0032 | Stormwater management budget (205-12108) | DOL | 8,721 | $1.00 | $1.00 |
| 0033 | Stormwater management implementation (205-12616) | LS | 1 | $1,500.00 | $6,441.57 |
| 0034 | Subgrade treatment, type IC (207-09935) | SYS | 3,258 | $54.00 | $30.00 |
| 0035 | Structure backfill, type 2 (211-09265) | CYS | 58 | $100.00 | $55.00 |
| 0036 | Geogrid, type IB (214-11796) | SYS | 16 | $6.10 | $0.85 |
| 0037 | Geotextile for pavement, type 2B (214-12239) | SYS | 3,062 | $4.50 | $5.00 |
| 0038 | Compacted aggregate, no. 53 (301-12234) | CYS | 173 | $152.00 | $115.00 |
| 0039 | Subbase for PCCP (302-06464) | CYS | 455 | $175.00 | $135.00 |
| 0040 | Compacted aggregate, no. 53 (303-01180) | TON | 177 | $40.00 | $50.00 |
| 0041 | Compacted aggregate, no. 73 (303-07449) | TON | 1,828 | $34.00 | $30.00 |
| 0042 | HMA patching, full depth, type C (304-12625) | TON | 15 | $250.00 | $700.00 |
| 0043 | HMA patching, partial depth, type C (304-12626) | TON | 65 | $205.00 | $440.00 |
| 0044 | Milling, asphalt, 2 in. (306-08036) | SYS | 265,970 | $1.10 | $2.00 |
| 0045 | Milling, transition (306-08043) | SYS | 951 | $1.10 | $10.23 |
| 0046 | Milling, approach (306-08432) | SYS | 25,629 | $3.00 | $3.85 |
| 0048 | QC/QA-HMA, 2, 58S, surface, 9.5 MM , with steel furnace slag (401-000001) | TON | 5,590 | $80.00 | $90.00 |
| 0049 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 16,538 | $72.00 | $98.00 |
| 0050 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 171 | $135.00 | $132.19 |
| 0051 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 693 | $90.00 | $96.58 |
| 0052 | Joint adhesive (401-11526) | LFT | 1,360 | $0.59 | $0.76 |
| 0053 | Inertial profiler, HMA (401-12169) | LS | 1 | $10,000 | $3,300.00 |
| 0054 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 146,650 | $3.45 | $2.23 |
| 0055 | Asphalt for tack coat (406-05520) | TON | 115 | $675.00 | $540.00 |
| 0056 | PCCP, 12 in. (502-06329) | SYS | 439 | $132.00 | $115.00 |
| 0057 | Retrofitted tie bars (503-03489) | EACH | 79 | $30.00 | $67.00 |
| 0058 | D-1 contraction joint (503-05240) | LFT | 328 | $59.00 | $17.00 |
| 0059 | Jointed reinforced concrete pavement, 12 in. (503-12476) | SYS | 364 | $225.00 | $189.00 |
| 0060 | Terminal joint, type HMA (503-12477) | LFT | 69 | $355.00 | $460.00 |
| 0061 | Terminal joint, type PCCP (503-12478) | LFT | 88 | $300.00 | $320.00 |
| 0062 | Expansion joint with load transfer (503-12479) | LFT | 81 | $42.00 | $96.00 |
| 0063 | Guardrail, remove (601-02241) | LFT | 700 | $6.50 | $6.50 |
| 0064 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 275 | $25.50 | $25.50 |
| 0065 | Guardrail transition, MGS with curb (601-12291) | EACH | 2 | $3,700.00 | $3,700.00 |
| 0066 | Guardrail transition, MGS without curb (601-12292) | EACH | 2 | $3,600.00 | $3,600.00 |
| 0067 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,050.00 | $3,050.00 |
| 0068 | Sidewalk, concrete (604-06070) | SYS | 106 | $120.00 | $87.00 |
| 0069 | Curb, concrete (605-06120) | LFT | 82 | $70.00 | $58.00 |
| 0070 | Curb and gutter, concrete (605-06140) | LFT | 82 | $70.00 | $86.00 |
| 0071 | Curb and gutter, concrete, type B (605-06145) | LFT | 286 | $70.00 | $85.00 |
| 0072 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 20 | $120.00 | $85.00 |
| 0073 | Milled HMA corrugations, conventional (606-12399) | LFT | 80,960 | $0.60 | $0.33 |
| 0074 | Paved side ditch, type A (607-06335) | LFT | 40 | $200.00 | $150.00 |
| 0075 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 931 | $175.00 | $179.00 |
| 0076 | HMA for approaches, type C (610-07488) | TON | 2,195 | $120.00 | $170.00 |
| 0077 | Mailbox assembly, single (611-06497) | EACH | 3 | $450.00 | $450.00 |
| 0078 | Monument, type B (615-06505) | EACH | 1 | $1,050.00 | $1,050.00 |
| 0079 | Casting adjust to grade, monument (615-06525) | EACH | 23 | $1,150.00 | $1,150.00 |
| 0080 | Riprap, revetment (616-06405) | TON | 582 | $84.00 | $96.91 |
| 0081 | Geotextile for riprap, type 2A (616-12248) | SYS | 33 | $3.00 | $15.00 |
| 0082 | Geotextile for riprap, type 2B (616-12249) | SYS | 270 | $6.00 | $4.72 |
| 0083 | Mobilization and demobilization for seeding (621-01004) | EACH | 5 | $500.00 | $500.00 |
| 0084 | Erosion control blanket (621-02770) | SYS | 599 | $3.00 | $3.00 |
| 0085 | Mulched seeding, type R (621-06559) | SYS | 572 | $4.00 | $4.00 |
| 0086 | Water (621-06567) | KGAL | 2.20 | $1.10 | $1.00 |
| 0087 | Sodding, nursery (621-06575) | SYS | 300 | $20.00 | $20.00 |
| 0088 | Seed mixture, emergent wetland (621-06737) | LBS | 0.11 | $12,000 | $12,000 |
| 0089 | Seed mixture, floodplain (621-12612) | LBS | 6 | $190.00 | $190.00 |
| 0090 | Field office, type C (628-09403) | MOS | 12 | $3,950.00 | $2,950.00 |
| 0091 | Reinforcing bars, epoxy coated (703-06029) | LBS | 55,210 | $2.00 | $1.70 |
| 0092 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 154 | $40.00 | $44.00 |
| 0093 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 4 | $3,000.00 | $4,800.00 |
| 0094 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $3,300.00 | $3,066.10 |
| 0095 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $4,600.00 | $4,401.20 |
| 0096 | Patching concrete structures (710-09158) | SFT | 52 | $170.00 | $198.00 |
| 0097 | Temporary causeway (713-04331) | LS | 1 | $193,612 | $200,000 |
| 0098 | Waterproofing membrane type 2 (714-000086) | SFT | 1,218 | $7.60 | $4.15 |
| 0099 | Safety metal end section, 4:1, diameter 15 in. (715-03475) | EACH | 2 | $1,860.00 | $1,825.00 |
| 0100 | Pipe end section, diameter 42 in. (715-04522) | EACH | 2 | $3,000.00 | $3,720.00 |
| 0101 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 87 | $130.00 | $298.97 |
| 0102 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 117 | $130.00 | $116.70 |
| 0103 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 36 | $116.00 | $133.26 |
| 0104 | HMA for structure installation, type C (715-08306) | TON | 67 | $150.00 | $483.32 |
| 0105 | Video inspection for pipe (715-09064) | LFT | 444 | $7.35 | $7.35 |
| 0106 | Grated box end section, type II, 10:1, diameter 15 in. (715-97686) | EACH | 2 | $30,000 | $18,160 |
| 0107 | Casting, catch basin, adjust to grade (720-12796) | EACH | 2 | $500.00 | $1,000.00 |
| 0108 | Casting, inlet, adjust to grade (720-12797) | EACH | 5 | $500.00 | $1,000.00 |
| 0109 | Casting, manhole, adjust to grade (720-12798) | EACH | 2 | $500.00 | $1,000.00 |
| 0110 | Casting, type 8, furnish and adjust to grade (720-44045) | EACH | 1 | $2,200.00 | $2,200.00 |
| 0111 | Inlet, type P12A (720-45070) | EACH | 1 | $5,100.00 | $5,000.00 |
| 0112 | Inlet, type N12A (720-91246) | EACH | 1 | $6,600.00 | $5,850.00 |
| 0113 | Bridge deck overlay, rigid (722-000134) | SYS | 1,500 | $95.00 | $106.00 |
| 0114 | Hydrodemolition (722-01066) | SYS | 1,500 | $85.00 | $83.00 |
| 0115 | Bridge deck overlay budget (722-12380) | DOL | 24,605 | $1.00 | $1.00 |
| 0116 | Bridge deck, remove concrete surface (722-12464) | SYS | 1,500 | $12.00 | $18.00 |
| 0117 | Longitudinal grooving (722-12732) | SYS | 2,431 | $2.00 | $7.00 |
| 0118 | Bridge deck patching, full depth (722-51401) | SFT | 150 | $40.00 | $50.00 |
| 0119 | Bridge expansion joint, type PCF (724-12773) | LFT | 72 | $100.00 | $1.00 |
| 0120 | Pipe liner, cured-in- place, min. area 6.5 SFT (725-11294) | LFT | 204 | $489.71 | $477.43 |
| 0121 | Temporary pavement message marking, lane indication arrow (801-01504) | EACH | 28 | $250.00 | $172.00 |
| 0122 | Construction sign, type C (801-03290) | EACH | 2 | $250.00 | $258.00 |
| 0123 | Construction sign, type D (801-03291) | EACH | 12 | $175.00 | $279.00 |
| 0124 | Road closure sign assembly (801-04308) | EACH | 9 | $250.00 | $368.00 |
| 0125 | Temporary pavement marking, 6 in. (801-06206) | LFT | 293,534 | $0.35 | $0.33 |
| 0126 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 15,355 | $2.25 | $1.88 |
| 0127 | Temporary transverse pavement marking, 24 in. (801-06216) | LFT | 1,392 | $18.00 | $11.64 |
| 0128 | Temporary transverse pavement marking, removable, 6 in. (801-06217) | LFT | 92 | $6.00 | $1.88 |
| 0129 | Detour route marker assembly (801-06625) | EACH | 53 | $175.00 | $176.00 |
| 0130 | Construction sign, type A (801-06640) | EACH | 122 | $225.00 | $259.00 |
| 0131 | Construction sign, type B (801-06645) | EACH | 17 | $150.00 | $114.00 |
| 0132 | Flashing arrow sign (801-06710) | DAY | 600 | $20.00 | $17.50 |
| 0133 | Maintaining traffic (801-06775) | LS | 1 | $267,188 | $50,000 |
| 0134 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 1 | $9,300.00 | $9,300.00 |
| 0135 | Barricade, type III-A (801-07118) | LFT | 330 | $15.00 | $17.69 |
| 0136 | Barricade, type III-B (801-07119) | LFT | 60 | $15.00 | $17.69 |
| 0137 | Temporary traffic barrier, type 2 (801-08401) | LFT | 200 | $75.00 | $50.00 |
| 0138 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 350 | $75.00 | $50.00 |
| 0139 | Temporary curb ramp (801-11990) | EACH | 2 | $2,200.00 | $4,519.66 |
| 0140 | Truck mounted attenuator (801-12042) | DAY | 240 | $200.00 | $100.00 |
| 0141 | Temporary accessible pedestrian path (801-12641) | SYS | 45 | $70.00 | $57.21 |
| 0142 | Temporary pedestrian channelizer (801-12862) | LFT | 775 | $20.00 | $34.11 |
| 0143 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $375.00 | $769.00 |
| 0144 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 4 | $1,250.00 | $1,776.00 |
| 0145 | Construction signs mobile (801-92448) | DAY | 720 | $1.00 | $10.00 |
| 0146 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 88 | $25.00 | $47.50 |
| 0147 | Sign, sheet, relocate (802-07060) | EACH | 8 | $125.00 | $375.00 |
| 0148 | Delineator post, flexible, type I (804-11920) | EACH | 6 | $100.00 | $160.00 |
| 0149 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 1,971 | $0.75 | $0.75 |
| 0150 | Signal detector housing (805-78785) | EACH | 3 | $2,500.00 | $2,500.00 |
| 0151 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 759 | $15.00 | $15.00 |
| 0152 | Temporary transverse markings white stop line 24 in. (808-01428) | LFT | 723 | $18.00 | $11.94 |
| 0153 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,500.00 | $3,500.00 |
| 0154 | Transverse marking, multi-component, crosshatch line, white, 12 in. (808-10047) | LFT | 40 | $12.00 | $7.91 |
| 0155 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 68,816 | $1.25 | $0.87 |
| 0156 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 54,443 | $1.25 | $0.87 |
| 0157 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 175 | $1.25 | $2.11 |
| 0158 | Grooving for pavement markings (808-12032) | LFT | 146,767 | $0.60 | $0.69 |
| 0159 | Transverse marking, preformed plastic, crosshatch line, yellow, 24 in. (808-12633) | LFT | 772 | $26.00 | $25.06 |
| 0160 | Line, multi-component, solid, white, 10 in. (808-12781) | LFT | 5,248 | $2.50 | $2.49 |
| 0161 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 2,000 | $1.25 | $1.71 |
| 0162 | Line, preformed plastic, dotted, yellow, 6 in. (808-12846) | LFT | 296 | $7.50 | $9.11 |
| 0163 | Line, multi-component, solid, yellow, 10 in. (808-12859) | LFT | 5,688 | $2.50 | $1.71 |
| 0164 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 13,290 | $7.50 | $7.01 |
| 0165 | Transverse marking, preformed plastic, stop line, white, 24 in. (808-75067) | LFT | 723 | $26.00 | $25.06 |
| 0166 | Pavement message marking, preformed plastic, lane indication arrow (808-75071) | EACH | 28 | $550.00 | $481.00 |
| 0167 | Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272) | LFT | 620 | $10.00 | $13.22 |
| 0168 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 1,930 | $8.00 | $11.06 |
| 0169 | Snowplowable raised pavement marker (808-75998) | EACH | 679 | $65.00 | $34.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.