INDOT contract B-44836-A bid tabulation
BRIDGE REMOVAL. Let by Indiana DOT on September 10, 2025, Wells, Fort Wayne. 4 bids received; low bid $968,000 by Morphey Construction Inc..
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 33
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morphey Construction Inc. | $968,000 | Low |
| 2 | American Contracting & Services Inc | $991,213 | +2.0% |
| 3 | Beaty Construction Inc | $1,172,166 | +21% |
| 4 | Milestone Contractors LP | $1,488,110 | +54% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morphey Construction Inc. | 2. American Contracting & Services Inc | 3. Beaty Construction Inc | 4. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $40,000 | $20,000 | $1,900.00 | $29,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Mobilization and demobilization (110-01001) | LS | 1 | $48,400 | $49,561 | $58,000 | $73,058 |
| 0008 | Clearing and grubbing (201-06587) | ACRE | 1 | $20,000 | $20,000 | $10,000 | $27,656 |
| 0009 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $349,100 | $400,000 | $716,000 | $891,598 |
| 0010 | Stormwater management budget (205-12108) | DOL | 35,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $30,000 | $4,200.00 | $13,265 |
| 0012 | Cofferdam (206-51235) | LS | 1 | $10,000 | $21,000 | $10,500 | $15,000 |
| 0014 | Guardrail, reset (601-06035) | LFT | 100 | $60.00 | $80.00 | $81.50 | $78.00 |
| 0016 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $2,500.00 | $525.00 | $525.00 | $525.00 |
| 0017 | Water (621-06567) | KGAL | 2 | $5.00 | $25.00 | $25.00 | $25.00 |
| 0018 | Topsoil (621-06570) | CYS | 82 | $100.00 | $300.00 | $150.00 | $335.00 |
| 0019 | Sodding (621-06574) | SYS | 335 | $40.00 | $12.70 | $16.50 | $12.70 |
| 0020 | Seed mixture, emergent wetland (621-06737) | LBS | 5 | $2,000.00 | $1,255.00 | $1,255.00 | $1,255.00 |
| 0021 | Permanent turf reinforcement mat (621-08161) | SYS | 170 | $50.00 | $13.75 | $13.75 | $13.75 |
| 0022 | Seed mixture, floodplain (621-12612) | LBS | 75 | $300.00 | $140.00 | $140.00 | $140.00 |
| 0023 | Field office, type C (628-09403) | MOS | 2 | $5,000.00 | $12,000 | $4,000.00 | $8,000.00 |
| 0026 | Temporary causeway (713-04331) | LS | 1 | $328,184 | $235,000 | $225,000 | $295,000 |
| 0028 | Pump , structure no. 1 (715-09977) | EACH | 1 | $1.00 | $13,000 | $1,000.00 | $2,500.00 |
| 0029 | Road closure sign assembly (801-04308) | EACH | 4 | $125.00 | $125.00 | $335.00 | $125.00 |
| 0030 | Detour route marker assembly (801-06625) | EACH | 35 | $75.00 | $75.00 | $140.00 | $15.00 |
| 0031 | Construction sign, type A (801-06640) | EACH | 20 | $175.00 | $175.00 | $158.00 | $125.00 |
| 0032 | Construction sign, type B (801-06645) | EACH | 4 | $50.00 | $50.00 | $105.00 | $125.00 |
| 0033 | Maintaining traffic (801-06775) | LS | 1 | $19,351 | $25,000 | $5,700.00 | $5,000.00 |
| 0034 | Maintaining traffic , waterway (801-06775) | LS | 1 | $10,000 | $40,000 | $32,000 | $9,500.00 |
| 0035 | Barricade, type III-A (801-07118) | LFT | 72 | $8.00 | $10.00 | $17.00 | $14.00 |
| 0036 | Barricade, type III-B (801-07119) | LFT | 56 | $8.00 | $10.00 | $17.00 | $14.00 |
| 0037 | Portable changeable message sign (801-11642) | EACH | 2 | $2,000.00 | $2,000.00 | $2,500.00 | $1,000.00 |
| 0038 | Plaque (615-08351) | EACH | 1 | $5,000.00 | $10,000 | $2,200.00 | $8,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.