INDOT contract B-46559-A bid tabulation
IDIQ, DISTRICT WIDE BRIDGE MAINTENANCE. Let by Indiana DOT on August 5, 2026, Various, Seymour. 4 bids received; low bid $1,579,996 by Ragle, Inc..
- Owner
- Indiana DOT
- Letting
- 05 AUG 2026
- Pay items
- 66
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ragle, Inc. | $1,579,996 | Low |
| 2 | E & B Paving LLC | $2,047,795 | +30% |
| 3 | Milestone Contractors LP | $2,234,883 | +41% |
| 4 | CLR Inc | $2,470,185 | +56% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ragle, Inc. | 2. E & B Paving LLC | 3. Milestone Contractors LP | 4. CLR Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0002 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Mobilization and demobilization, idiq (110-12655) | DOL | 150,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Pavement removal (202-02240) | SYS | 500 | $65.00 | $110.00 | $271.00 | $85.00 |
| 0008 | Present structure, remove portions, structure no. , idiq (202-51328) | LS | 1 | $20,000 | $40,000 | $48,700 | $10,000 |
| 0009 | Slopewall, remove (202-51368) | SYS | 400 | $41.50 | $130.00 | $96.50 | $185.00 |
| 0010 | Excavation, common (203-02000) | CYS | 75 | $62.50 | $100.00 | $98.00 | $190.00 |
| 0011 | Flowable backfill, removable (213-09270) | CYS | 300 | $285.00 | $250.00 | $284.00 | $495.00 |
| 0012 | Compacted aggregate, no. 53 (303-01180) | TON | 100 | $100.00 | $100.00 | $173.00 | $150.00 |
| 0013 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 633 | $25.00 | $15.00 | $19.00 | $25.00 |
| 0014 | Milling, PCCP idiq (306-08041) | SYS | 250 | $30.00 | $35.00 | $35.00 | $85.00 |
| 0015 | Lean concrete base, 9 in. (309-12695) | SYS | 250 | $95.00 | $135.00 | $150.00 | $425.00 |
| 0016 | HMA wedge and level, type C (402-07452) | TON | 250 | $295.00 | $350.00 | $285.00 | $395.00 |
| 0017 | Asphalt for tack coat (406-05520) | TON | 12 | $750.00 | $800.00 | $784.00 | $850.00 |
| 0018 | Terminal joint, polymer modified asphalt (503-12173) | LFT | 240 | $283.50 | $450.00 | $525.00 | $450.00 |
| 0019 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 222 | $280.00 | $365.00 | $508.00 | $550.00 |
| 0020 | Riprap, class 1 (616-05688) | TON | 150 | $170.00 | $200.00 | $350.00 | $165.00 |
| 0021 | Riprap, revetment (616-06405) | TON | 150 | $140.00 | $158.00 | $169.00 | $160.00 |
| 0022 | Slopewall, concrete, 5 in. (616-51366) | SYS | 500 | $143.50 | $220.00 | $195.00 | $280.00 |
| 0023 | Inspection hole (616-93772) | EACH | 6 | $410.00 | $325.00 | $2,650.00 | $525.00 |
| 0024 | Clean steel bridge, partial, QP-2, bridge no. , idiq (619-11050) | LS | 1 | $30,000 | $35,000 | $36,688 | $40,000 |
| 0025 | Disposal of cleaning waste, hazardous, bridge no. , idiq (619-12459) | LS | 1 | $2,000.00 | $1,200.00 | $1,223.00 | $5,000.00 |
| 0026 | Coat steel bridge, partial, bridge no. , idiq (619-51860) | LS | 1 | $6,000.00 | $12,000 | $11,006 | $25,000 |
| 0027 | Temporary shoring (702-04325) | LS | 1 | $25,000 | $55,000 | $74,266 | $95,000 |
| 0028 | Field drilled hole in concrete (702-51863) | EACH | 40 | $46.50 | $65.00 | $85.00 | $90.00 |
| 0029 | Concrete, A (702-90915) | CYS | 10 | $2,600.00 | $1,900.00 | $2,731.00 | $5,500.00 |
| 0030 | Reinforcing bars, epoxy coated (703-06029) | LBS | 8,500 | $5.00 | $4.25 | $5.00 | $10.00 |
| 0031 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 148 | $60.00 | $55.00 | $65.50 | $75.00 |
| 0032 | Fiber wrap concrete casing system (709-04647) | LS | 1 | $7,652.61 | $8,000.00 | $6,115.00 | $20,000 |
| 0033 | Surface seal (709-51821) | LS | 1 | $19,000 | $15,000 | $726.00 | $20,000 |
| 0034 | Patching concrete structures (710-09158) | SFT | 100 | $201.75 | $225.00 | $322.00 | $175.00 |
| 0035 | Bolt (711-01373) | EACH | 8 | $105.00 | $70.00 | $457.00 | $225.00 |
| 0036 | Structural steel, field cut (711-04297) | SQIN | 60 | $50.00 | $170.00 | $144.00 | $90.00 |
| 0037 | Repair weld (711-11599) | IN | 48 | $80.00 | $205.00 | $253.00 | $65.00 |
| 0038 | Jacking and supporting, structural member, idiq (711-12974) | DOL | 75,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0039 | Structural steel (711-51035) | LBS | 500 | $12.00 | $100.00 | $104.00 | $30.00 |
| 0040 | Drilled hole (711-51864) | EACH | 8 | $85.00 | $190.00 | $277.00 | $250.00 |
| 0041 | Field welding (711-95290) | LFT | 50 | $225.00 | $205.00 | $1,279.00 | $275.00 |
| 0042 | Stud shear connectors (711-96800) | EACH | 48 | $20.00 | $100.00 | $12.00 | $230.00 |
| 0043 | Bridge deck, remove concrete surface (722-12464) | SYS | 600 | $30.00 | $23.00 | $32.00 | $45.00 |
| 0044 | Longitudinal grooving (722-12732) | SYS | 500 | $15.00 | $14.00 | $15.00 | $40.00 |
| 0045 | Bridge deck patching, full depth (722-51401) | SFT | 20 | $105.00 | $725.00 | $350.00 | $450.00 |
| 0046 | Bridge deck patching, partial depth (722-51852) | SFT | 500 | $70.00 | $100.00 | $132.00 | $135.00 |
| 0047 | Bridge expansion joint, type PCF (724-12773) | LFT | 144 | $120.00 | $300.00 | $304.00 | $275.00 |
| 0048 | Bridge expansion joint seal, type PCF, replace (724-12779) | LFT | 144 | $120.00 | $120.00 | $293.00 | $295.00 |
| 0049 | Bearing assembly, reset (726-11773) | EACH | 10 | $1,500.00 | $2,250.00 | $1,045.00 | $5,500.00 |
| 0050 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 16 | $64.71 | $75.00 | $51.50 | $15.00 |
| 0051 | Epoxy injection, crack preparation (727-90308) | LFT | 100 | $113.40 | $130.00 | $41.00 | $100.00 |
| 0052 | Epoxy injection, furnishing equipment (727-93560) | LS | 1 | $965.08 | $2,000.00 | $3,057.00 | $1,500.00 |
| 0053 | Warranted polymer overlay, bridge deck , idiq (738-12855) | SYS | 500 | $74.66 | $85.00 | $98.50 | $55.00 |
| 0054 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 10,000 | $2.45 | $5.00 | $3.00 | $2.50 |
| 0055 | Construction sign, type A (801-06640) | EACH | 50 | $400.00 | $600.00 | $202.00 | $550.00 |
| 0056 | Construction sign, type B (801-06645) | EACH | 20 | $350.00 | $565.00 | $120.00 | $145.00 |
| 0057 | Flashing arrow sign (801-06710) | DAY | 75 | $50.00 | $180.00 | $18.50 | $80.00 |
| 0058 | Barricade, type III-A (801-07118) | LFT | 100 | $25.00 | $50.00 | $19.50 | $25.00 |
| 0059 | Temporary traffic barrier, type 2 (801-08401) | LFT | 450 | $100.00 | $200.00 | $118.00 | $175.00 |
| 0060 | Portable changeable message sign (801-11642) | EACH | 6 | $2,500.00 | $6,500.00 | $4,892.00 | $3,750.00 |
| 0061 | Truck mounted attenuator (801-12042) | DAY | 25 | $750.00 | $600.00 | $1,554.00 | $575.00 |
| 0062 | Portable signal (801-12081) | LS | 1 | $25,000 | $16,000 | $31,796 | $90,000 |
| 0063 | Law enforcement officer (801-12324) | HRS | 40 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0064 | Maintaining traffic, idiq (801-12440) | DOL | 250,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0065 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $1,500.00 | $3,500.00 | $1,834.00 | $750.00 |
| 0066 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 4 | $1,500.00 | $3,500.00 | $1,834.00 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.