INDOT contract R-43932-A bid tabulation
HMA OVERLAY, CONCRETE PVMT RESTORATION AND BRIDGE COATING. Let by Indiana DOT on September 10, 2025, Laporte, Porter, LaPorte. 2 bids received; low bid $31,877,000 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 134
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $31,877,000 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $33,277,092 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $48,000 | $225,580 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $1,250,000 | $937,225 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $58,000 | $8,600.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $9,542.30 | $21,000 |
| 0014 | Handhole, remove (202-86946) | EACH | 2 | $3,072.65 | $3,072.65 |
| 0015 | Detector housing, remove (202-90277) | EACH | 6 | $1,024.31 | $1,024.31 |
| 0016 | Barrier wall, concrete, remove (202-94954) | LFT | 3,359 | $37.00 | $25.00 |
| 0017 | Borrow (203-02070) | CYS | 125 | $120.00 | $83.00 |
| 0018 | Linear grading (203-08607) | LFT | 4,498 | $8.75 | $2.00 |
| 0019 | Stormwater management budget (205-12108) | DOL | 41,310 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $22,000 | $82,400 |
| 0021 | Subgrade treatment, type II (207-08264) | SYS | 4,283 | $51.00 | $33.00 |
| 0022 | Subgrade treatment, type IC (207-09935) | SYS | 1,682 | $73.00 | $51.10 |
| 0023 | Drilled hole for flowable backfill (213-08068) | EACH | 3 | $483.00 | $500.00 |
| 0024 | Flowable backfill, non- removable (213-09269) | CYS | 10 | $1,056.00 | $200.00 |
| 0025 | Flowable backfill, removable (213-09270) | CYS | 166 | $255.00 | $200.00 |
| 0026 | Geogrid, type IB (214-11796) | SYS | 4,785 | $1.75 | $1.00 |
| 0027 | Compacted aggregate, no. 2 (301-12231) | CYS | 249 | $93.00 | $100.00 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 431 | $139.00 | $92.00 |
| 0029 | Compacted aggregate, no. 73 (303-07449) | TON | 1,065 | $66.00 | $48.00 |
| 0030 | Widening with HMA, type D (304-07789) | TON | 1,045 | $148.00 | $152.00 |
| 0031 | HMA patching, full depth, type D (304-12627) | TON | 2,300 | $207.00 | $172.00 |
| 0032 | HMA patching, partial depth, type D (304-12628) | TON | 1,201 | $222.00 | $225.00 |
| 0033 | Milling, asphalt, 4 in. (306-08038) | SYS | 205,798 | $3.90 | $4.80 |
| 0034 | Milling, profile (306-11872) | SYS | 309,916 | $3.90 | $4.60 |
| 0035 | Lean concrete base, 9 in. (309-12695) | SYS | 1,836 | $95.00 | $87.00 |
| 0036 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 43,303 | $94.50 | $93.55 |
| 0037 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 72,173 | $86.50 | $89.45 |
| 0039 | Inertial profiler, HMA (401-12169) | LS | 1 | $20,000 | $1,000.00 |
| 0040 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 309,101 | $3.28 | $3.20 |
| 0041 | Asphalt for tack coat (406-05520) | TON | 357 | $970.00 | $860.00 |
| 0042 | Cracks in asphalt pavement, fill (408-12028) | TON | 27 | $3,000.00 | $7,800.00 |
| 0043 | Retrofitted tie bars (503-03489) | EACH | 2,844 | $49.35 | $51.00 |
| 0044 | D-1 contraction joint (503-05240) | LFT | 9,000 | $35.00 | $18.87 |
| 0045 | PCCP patching, full depth (506-06333) | SYS | 19,900 | $193.00 | $152.90 |
| 0046 | Joints in PCCP, filled (507-08271) | LFT | 14,603 | $2.80 | $1.85 |
| 0047 | Joint repair, partial depth (509-12191) | SFT | 831 | $103.00 | $112.00 |
| 0048 | Guardrail, remove (601-02241) | LFT | 4,436 | $7.50 | $8.00 |
| 0049 | Guardrail, reset (601-06035) | LFT | 50 | $140.00 | $68.00 |
| 0050 | Hand dig guardrail post holes (601-09238) | EACH | 6 | $125.00 | $106.00 |
| 0051 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 4,354 | $25.00 | $27.00 |
| 0052 | Guardrail, MGS W-beam, 3 FT 1.5 in. spacing (601-12282) | LFT | 75 | $46.00 | $42.00 |
| 0053 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 8 | $1,350.00 | $2,041.00 |
| 0054 | Guardrail, thrie-beam transition section, galvanized , asymmetric MGS W-beam to thrie-beam (601-91649) | EACH | 1 | $500.00 | $1,745.00 |
| 0055 | Guardrail end treatment, type OS (601-94689) | EACH | 10 | $3,350.00 | $3,423.00 |
| 0056 | Concrete barrier (602-01064) | LFT | 3,359 | $149.50 | $125.00 |
| 0057 | Milled HMA corrugations, conventional (606-12399) | LFT | 175,198 | $0.30 | $0.85 |
| 0058 | HMA for approaches, type D (610-07788) | TON | 455 | $155.00 | $121.00 |
| 0059 | Clean steel bridge, QP-2, bridge no. 1 (619-11052) | LS | 1 | $271,750 | $268,000 |
| 0060 | Clean steel bridge, QP-2, bridge no. 2 (619-11052) | LS | 1 | $119,000 | $119,000 |
| 0061 | Clean steel bridge, QP-2, bridge no. 3 (619-11052) | LS | 1 | $119,000 | $119,000 |
| 0062 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $2,000.00 | $2,000.00 |
| 0063 | Disposal of cleaning waste, hazardous, bridge no. 2 (619-12459) | LS | 1 | $1,000.00 | $1,000.00 |
| 0064 | Disposal of cleaning waste, hazardous, bridge no. 3 (619-12459) | LS | 1 | $1,000.00 | $1,000.00 |
| 0065 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $115,000 | $115,000 |
| 0066 | Coat steel bridge, bridge no. 2 (619-51859) | LS | 1 | $45,000 | $45,000 |
| 0067 | Coat steel bridge, bridge no. 3 (619-51859) | LS | 1 | $45,000 | $45,000 |
| 0068 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $500.00 | $500.00 |
| 0069 | Erosion control blanket (621-02770) | SYS | 4,175 | $1.48 | $1.48 |
| 0070 | Fertilizer, for permanent seeding (621-06545) | TON | 1 | $1,100.00 | $1,100.00 |
| 0071 | Seed mixture, type P (621-06555) | LBS | 112 | $7.44 | $7.44 |
| 0072 | Mulched seeding, type U (621-06560) | SYS | 884 | $1.40 | $1.40 |
| 0073 | Computer system equipment (628-11976) | EACH | 3 | $1,250.00 | $1,515.10 |
| 0074 | Field office, type D (628-12683) | MOS | 32 | $3,200.00 | $2,400.00 |
| 0075 | Reinforcing bars, epoxy coated (703-06029) | LBS | 374 | $12.34 | $12.00 |
| 0076 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 1 | $9,665.58 | $6,800.00 |
| 0077 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $200.00 | $1.00 |
| 0078 | Patching concrete structures (710-09158) | SFT | 571 | $130.00 | $143.00 |
| 0079 | Structural steel (711-51038) | LS | 1 | $2,020.53 | $7,400.00 |
| 0080 | Pipe, slotted drain, diameter 12 in. , 0.064 inch (715-05422) | LFT | 3,359 | $146.00 | $134.00 |
| 0081 | Pipe, roadway drain casting extension (715-10238) | EACH | 1 | $1,992.00 | $2,000.00 |
| 0082 | Underdrain, patching (718-08308) | LFT | 3,342 | $83.00 | $2.00 |
| 0083 | Epoxy injection, crack preparation (727-90308) | LFT | 75 | $90.00 | $90.00 |
| 0085 | Epoxy injection, furnishing equipment , bridge no. 2 (727-93560) | LS | 1 | $2,200.00 | $2,200.00 |
| 0086 | Construction sign, type C (801-03290) | EACH | 9 | $281.00 | $281.00 |
| 0088 | Road closure sign assembly (801-04308) | EACH | 3 | $389.00 | $389.00 |
| 0089 | Patroller (801-06198) | DAY | 840 | $2,200.00 | $3,181.00 |
| 0090 | Temporary pavement marking, 6 in. (801-06206) | LFT | 550,596 | $0.36 | $0.36 |
| 0091 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 2,763 | $1.81 | $1.81 |
| 0092 | Temporary pavement marking, 8 in. (801-06586) | LFT | 21,582 | $0.74 | $0.74 |
| 0093 | Detour route marker assembly (801-06625) | EACH | 35 | $174.00 | $174.00 |
| 0094 | Construction sign, type A (801-06640) | EACH | 158 | $259.00 | $259.00 |
| 0095 | Construction sign, type B (801-06645) | EACH | 47 | $122.00 | $122.00 |
| 0096 | Temporary raised pavement marker, grade 2 (801-06650) | EACH | 3,772 | $10.19 | $10.19 |
| 0097 | Flashing arrow sign (801-06710) | DAY | 1,710 | $17.00 | $17.00 |
| 0098 | Maintaining traffic (801-06775) | LS | 1 | $723,224 | $506,680 |
| 0099 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 6 | $13,100 | $30,304 |
| 0100 | Barricade, type III-A (801-07118) | LFT | 100 | $17.77 | $17.77 |
| 0101 | Barricade, type III-B (801-07119) | LFT | 144 | $17.77 | $17.77 |
| 0102 | Temporary pavement marking, 24 in. (801-07612) | LFT | 176 | $10.11 | $10.11 |
| 0103 | Temporary traffic barrier, type 1 (801-08400) | LFT | 29,235 | $52.00 | $100.00 |
| 0104 | Portable changeable message sign (801-11642) | EACH | 16 | $5,446.00 | $5,446.00 |
| 0105 | Truck mounted attenuator (801-12042) | DAY | 120 | $241.00 | $901.85 |
| 0107 | Automated work zone information system (801-12544) | EACH | 2 | $74,251 | $74,251 |
| 0108 | Queue truck (801-12652) | DAY | 840 | $1,075.00 | $940.00 |
| 0109 | Temporary speed feedback assembly (801-12832) | EACH | 4 | $2,708.00 | $2,708.00 |
| 0110 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 18 | $758.00 | $758.00 |
| 0111 | Temporary buzz strips (801-97643) | LFT | 15,552 | $19.80 | $19.80 |
| 0112 | Reference post (802-04893) | EACH | 4 | $200.00 | $303.11 |
| 0113 | Sign post, square, type 3, unreinforced anchor base (802-05706) | LFT | 120 | $42.90 | $42.90 |
| 0114 | Sign, sheet, and supports, remove (802-07059) | EACH | 2 | $187.60 | $187.60 |
| 0115 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 27 | $32.17 | $32.17 |
| 0116 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 100 | $38.61 | $38.61 |
| 0117 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 2,460 | $1.10 | $1.10 |
| 0118 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 1,052 | $27.96 | $27.96 |
| 0119 | Line, remove (808-06716) | LFT | 249,305 | $0.56 | $0.56 |
| 0120 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,500.00 | $3,500.00 |
| 0121 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 45,154 | $0.91 | $0.91 |
| 0122 | Grooving for pavement markings (808-12032) | LFT | 268,676 | $0.67 | $0.67 |
| 0123 | Line, multi-component, dotted, white, 6 in. (808-12353) | LFT | 3,776 | $0.94 | $0.94 |
| 0134 | Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272) | LFT | 1,937 | $14.78 | $14.78 |
| 0136 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 2,013 | $14.80 | $14.80 |
| 0137 | Snowplowable raised pavement marker (808-75998) | EACH | 2,133 | $34.40 | $34.40 |
| 0138 | Roadway weather information system , sensor, replace (809-08372) | EACH | 4 | $19,269 | $19,269 |
| 0139 | Weigh-in-motion station, rebuild , MM 29.9 WB (809-11763) | LS | 1 | $498,127 | $498,127 |
| 0140 | Joint adhesive (401-11526) | LFT | 410,847 | $0.50 | $0.90 |
| 0141 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 6 | $150.00 | $150.00 |
| 0142 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 92,818 | $0.89 | $2.00 |
| 0143 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 92,635 | $0.89 | $2.00 |
| 0146 | Line, multi-component, solid, white, 10 in. (808-12781) | LFT | 7,101 | $2.61 | $2.00 |
| 0147 | Line, multi-component, broken, black, 6 in. (808-12949) | LFT | 25,444 | $1.31 | $2.00 |
| 0148 | Line, multi-component, dotted, black, 6 in. (808-12951) | LFT | 2,630 | $2.44 | $2.00 |
| 0149 | Weigh-in-motion station, rebuild , MM 29.0 WB (809-11763) | LS | 1 | $221,921 | $221,921 |
| 0150 | Temporary pavement marking, 6 in. , orange contrast (801-06206) | LFT | 46,794 | $0.89 | $1.50 |
| 0151 | Temporary pavement marking, 8 in. , orange contrast (801-06586) | LFT | 24,707 | $1.56 | $1.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.