INDOT contract R-44469-A bid tabulation
SMALL STRUCTURE PIPE LINING. Let by Indiana DOT on October 7, 2026, Jackson, Seymour. 4 bids received; low bid $368,509 by Temple & Temple Excavating & Paving Inc.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 32
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Temple & Temple Excavating & Paving Inc | $368,509 | Low |
| 2 | Yarberry Companies Inc | $382,370 | +4.0% |
| 3 | Morphey Construction Inc. | $406,385 | +10% |
| 4 | 5 Star Company Inc | $446,393 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Temple & Temple Excavating & Paving Inc | 2. Yarberry Companies Inc | 3. Morphey Construction Inc. | 4. 5 Star Company Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $2,918.31 | $25,000 | $4,500.00 | $12,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Mobilization and demobilization (110-01001) | LS | 1 | $17,610 | $19,000 | $30,000 | $65,000 |
| 0008 | Clearing right-of-way (201-52370) | LS | 1 | $1,546.63 | $15,000 | $20,000 | $12,500 |
| 0009 | Pump around (205-11626) | EACH | 1 | $8,019.32 | $15,000 | $15,000 | $7,000.00 |
| 0010 | Stormwater management budget (205-12108) | DOL | 8,400 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Stormwater management implementation (205-12616) | LS | 1 | $10,947 | $5,000.00 | $5,000.00 | $1,500.00 |
| 0012 | Guardrail, reset (601-06035) | LFT | 100 | $90.30 | $50.00 | $36.00 | $95.00 |
| 0013 | Riprap, class 2 (616-05689) | TON | 28 | $231.57 | $450.00 | $280.00 | $120.00 |
| 0014 | Riprap, uniform (616-06451) | TON | 3 | $144.37 | $400.00 | $750.00 | $120.00 |
| 0015 | Geotextile for riprap, type 2B (616-12249) | SYS | 28 | $12.04 | $25.00 | $100.00 | $5.00 |
| 0016 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $553.09 | $1,000.00 | $300.00 | $1,250.00 |
| 0017 | Erosion control blanket (621-02770) | SYS | 795 | $7.15 | $7.00 | $3.00 | $6.00 |
| 0019 | Computer system equipment (628-11976) | EACH | 3 | $330.61 | $2,000.00 | $750.00 | $600.00 |
| 0020 | Field office, type D (628-12683) | MOS | 6 | $6,122.36 | $2,500.00 | $2,200.00 | $2,500.00 |
| 0021 | Pipe liner, cured-in- place, 48 in. (725-08296) | LFT | 140 | $1,160.10 | $1,100.00 | $1,100.00 | $1,100.00 |
| 0022 | Construction sign, type A (801-06640) | EACH | 30 | $214.28 | $200.00 | $175.00 | $185.00 |
| 0023 | Construction sign, type B (801-06645) | EACH | 2 | $122.45 | $150.00 | $100.00 | $120.00 |
| 0024 | Maintaining traffic (801-06775) | LS | 1 | $4,897.89 | $25,000 | $30,000 | $36,500 |
| 0025 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 600 | $73.47 | $45.00 | $100.00 | $95.00 |
| 0026 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $489.79 | $450.00 | $400.00 | $440.00 |
| 0027 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 4 | $1,224.47 | $1,100.00 | $1,000.00 | $1,100.00 |
| 0028 | Seed mixture, type R (621-06553) | LBS | 34 | $101.20 | $50.00 | $300.00 | $36.00 |
| 0029 | Fertilizer for permanent seeding (621-06545) | TON | 1 | $3,050.37 | $1,500.00 | $5.00 | $1,000.00 |
| 0030 | Flashing arrow sign (801-06710) | DAY | 4 | $61.22 | $60.00 | $50.00 | $56.00 |
| 0031 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $8,938.65 | $8,030.00 | $7,300.00 | $15,000 |
| 0032 | Truck mounted attenuator (801-12042) | DAY | 4 | $306.12 | $350.00 | $250.00 | $790.00 |
| 0033 | Law enforcement officer (801-12324) | HRS | 100 | $75.00 | $75.00 | $75.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.