| 0001 | Construction engineering (105-06845) | LS | 1 | $48,800 | $15,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 8 | $1,025.00 | $395.40 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 8 | $612.00 | $211.60 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $243,100 | $260,974 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $4,500.00 | $45,000 |
| 0013 | Excavation, common (203-02000) | CYS | 150 | $65.00 | $60.00 |
| 0014 | Subgrade treatment, type IC (207-09935) | SYS | 2,236 | $40.00 | $47.00 |
| 0015 | Compacted aggregate, no. 53 (303-01180) | TON | 3,807 | $35.00 | $52.00 |
| 0016 | Compacted aggregate, no. 53, temporary for driveways (303-08210) | TON | 300 | $80.00 | $67.00 |
| 0017 | HMA patching, full depth, type B (304-12623) | TON | 937 | $135.00 | $165.00 |
| 0018 | Milling, scarification (306-08042) | SYS | 85,131 | $1.50 | $1.60 |
| 0019 | Milling, approach (306-08432) | SYS | 2,958 | $14.00 | $4.50 |
| 0020 | Milling, asphalt, 5 in. (306-11619) | SYS | 85,131 | $2.35 | $4.60 |
| 0021 | Corrective aggregate, FDR (307-12253) | TON | 8,088 | $18.00 | $18.00 |
| 0022 | Full depth reclamation (307-12254) | SYS | 85,131 | $6.50 | $5.80 |
| 0023 | Stabilizing material, portland cement (307-12256) | TON | 1,788 | $220.00 | $220.00 |
| 0024 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 9,422 | $88.00 | $110.00 |
| 0025 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 174 | $105.00 | $125.00 |
| 0026 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 74 | $280.00 | $125.00 |
| 0027 | Joint adhesive, surface (401-10258) | LFT | 29,082 | $0.50 | $0.45 |
| 0028 | Joint adhesive, intermediate (401-10259) | LFT | 29,082 | $0.50 | $0.45 |
| 0030 | Inertial profiler, HMA (401-12169) | LS | 1 | $6,500.00 | $4,025.00 |
| 0032 | Asphalt for tack coat (406-05520) | TON | 47 | $600.00 | $1.00 |
| 0033 | Cold central plant recycling (417-12211) | SYS | 85,131 | $8.50 | $8.50 |
| 0034 | Corrective aggregate, CCPR (417-12212) | TON | 1,107 | $7.00 | $25.00 |
| 0035 | Stabilizing material, asphalt emulsion, CCPR (417-12213) | TON | 767 | $667.95 | $700.00 |
| 0036 | Milled HMA corrugations, conventional (606-12399) | LFT | 47,347 | $0.40 | $0.37 |
| 0037 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 22,044 | $0.65 | $0.55 |
| 0038 | HMA for approaches, type B (610-07487) | TON | 323 | $150.00 | $140.00 |
| 0039 | Monument, RE-establish (615-06520) | EACH | 7 | $1,050.00 | $1,050.00 |
| 0040 | Field office, type C (628-09403) | MOS | 20 | $1,835.00 | $3,200.00 |
| 0041 | Computer system equipment (628-11976) | EACH | 3 | $900.00 | $1,500.00 |
| 0042 | Computer system (628-11977) | EACH | 1 | $3,900.00 | $1,500.00 |
| 0043 | Road closure sign assembly (801-04308) | EACH | 14 | $259.00 | $348.00 |
| 0044 | Temporary pavement marking, 4 in. (801-06203) | LFT | 126,102 | $0.34 | $0.34 |
| 0045 | Detour route marker assembly (801-06625) | EACH | 137 | $162.00 | $135.00 |
| 0046 | Construction sign, type A (801-06640) | EACH | 38 | $219.00 | $208.00 |
| 0047 | Construction sign, type B (801-06645) | EACH | 4 | $108.00 | $65.00 |
| 0048 | Maintaining traffic (801-06775) | LS | 1 | $229,766 | $214,397 |
| 0049 | Barricade, type III-A (801-07118) | LFT | 144 | $15.44 | $12.00 |
| 0050 | Barricade, type III-B (801-07119) | LFT | 264 | $15.44 | $14.00 |
| 0051 | Portable changeable message sign (801-11642) | EACH | 2 | $5,134.00 | $5,071.00 |
| 0052 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,000.00 | $3,181.00 |
| 0053 | Grooving for pavement markings (808-12032) | LFT | 5,261 | $0.73 | $0.70 |
| 0054 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 47,034 | $0.88 | $1.10 |
| 0055 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 10,627 | $0.88 | $1.10 |
| 0056 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 112 | $13.01 | $13.78 |
| 0057 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 308 | $16.50 | $1.00 |
| 0058 | Snowplowable raised pavement marker (808-75998) | EACH | 221 | $39.65 | $40.00 |
| 0059 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 5,390 | $1.09 | $2.07 |