INDOT contract T-45933-A bid tabulation
NEW FLASHER INSTALLATION. Let by Indiana DOT on July 8, 2026, Harrison, Seymour. 4 bids received; low bid $363,908 by Midwestern Electric LLC.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 48
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Midwestern Electric LLC | $363,908 | Low |
| 2 | Michiana Contracting Inc | $417,628 | +15% |
| 3 | James H Drew Corporation | $447,544 | +23% |
| 4 | Ragle, Inc. | $514,519 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Midwestern Electric LLC | 2. Michiana Contracting Inc | 3. James H Drew Corporation | 4. Ragle, Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $3,600.00 | $5,179.00 | $5,835.00 | $5,000.00 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $750.00 | $700.00 | $2,605.00 | $400.00 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 2 | $600.00 | $350.00 | $1,405.00 | $600.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $43,000 | $34,000 | $14,220 | $25,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $2,500.00 | $1,000.00 | $4,810.00 | $5,000.00 |
| 0013 | Excavation, unclassified (203-02020) | CYS | 25 | $200.00 | $45.00 | $289.00 | $250.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $7,500.00 | $2,500.00 | $9,405.00 | $2,500.00 |
| 0016 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 4,879 | $2.50 | $3.50 | $7.30 | $4.50 |
| 0017 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 403 | $101.00 | $149.10 | $147.00 | $101.00 |
| 0019 | Asphalt for tack coat (406-05520) | TON | 1.70 | $630.00 | $1.00 | $919.00 | $630.00 |
| 0020 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $500.00 | $500.00 | $292.00 | $1,000.00 |
| 0021 | Mulched seeding, type R (621-06559) | SYS | 75 | $15.00 | $15.00 | $109.00 | $25.00 |
| 0022 | Construction sign, type A (801-06640) | EACH | 10 | $219.00 | $175.00 | $344.00 | $236.00 |
| 0023 | Construction sign, type B (801-06645) | EACH | 2 | $107.00 | $150.00 | $201.00 | $138.00 |
| 0024 | Maintaining traffic (801-06775) | LS | 1 | $17,000 | $25,000 | $29,120 | $60,000 |
| 0025 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 114 | $34.00 | $65.00 | $48.50 | $45.00 |
| 0026 | Signal cantilever structure, dual arm 60 FT , 25 FT 2ND arm (805-000241) | EACH | 1 | $51,000 | $62,000 | $60,650 | $70,000 |
| 0027 | Miscellaneous equipment for traffic signals (805-01579) | LS | 1 | $1,500.00 | $750.00 | $2,880.00 | $1.00 |
| 0028 | Handhole, signal, type 1 (805-01842) | EACH | 3 | $2,200.00 | $2,000.00 | $3,550.00 | $2,000.00 |
| 0029 | Controller and cabinet, type P1 (805-02445) | EACH | 1 | $20,000 | $23,000 | $24,640 | $25,000 |
| 0030 | Traffic signal head, 1 (805-07190) | EACH | 8 | $750.00 | $800.00 | $826.00 | $1,250.00 |
| 0031 | Signal cantilever structure, single arm 35 FT (805-11377) | EACH | 1 | $27,000 | $31,000 | $30,600 | $45,000 |
| 0032 | Signal cantilever structure, single arm 45 FT (805-11379) | EACH | 1 | $30,000 | $35,000 | $34,450 | $55,000 |
| 0033 | Signal cantilever structure, drilled shaft foundation, type A (805-11383) | EACH | 1 | $6,500.00 | $10,000 | $5,755.00 | $10,000 |
| 0034 | Signal cantilever structure, drilled shaft foundation, type B (805-11384) | EACH | 1 | $8,500.00 | $15,000 | $10,690 | $10,000 |
| 0035 | Signal cantilever structure, drilled shaft foundation, type F (805-11386) | EACH | 1 | $12,500 | $20,000 | $15,790 | $18,000 |
| 0036 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 225 | $30.00 | $17.00 | $45.50 | $25.00 |
| 0037 | Signal service (805-78445) | EACH | 1 | $1,800.00 | $2,500.00 | $3,320.00 | $4,500.00 |
| 0038 | Signal cable, control, copper, 3C/14 gauge (805-78480) | LFT | 282 | $4.50 | $5.00 | $4.50 | $2.50 |
| 0039 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 375 | $5.25 | $6.00 | $5.00 | $4.00 |
| 0040 | Controller cabinet foundation, type P1 (805-78925) | EACH | 1 | $3,500.00 | $4,000.00 | $3,685.00 | $6,500.00 |
| 0041 | Wire , faa obstruction lights (807-04651) | LFT | 1,100 | $6.00 | $1.50 | $3.40 | $5.00 |
| 0042 | Lighting , faa obstruction light L-810(2) (807-05815) | EACH | 3 | $5,200.00 | $5,000.00 | $2,175.00 | $15,000 |
| 0043 | Luminaire, remove and relocate (807-91082) | EACH | 2 | $2,200.00 | $3,500.00 | $3,655.00 | $2,500.00 |
| 0044 | Line, thermoplastic, broken, white, 4 in. (808-06701) | LFT | 38 | $11.13 | $2.50 | $2.20 | $1.48 |
| 0045 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 794 | $1.00 | $2.50 | $1.40 | $0.98 |
| 0046 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 1,010 | $1.00 | $2.50 | $1.40 | $0.98 |
| 0047 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 87 | $2.00 | $15.00 | $20.50 | $14.12 |
| 0048 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 14 | $175.00 | $200.00 | $325.00 | $223.00 |
| 0049 | Joint adhesive (401-11526) | LFT | 943 | $2.00 | $0.50 | $2.90 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.