Michiana Contracting Inc: INDOT bid record

Michiana Contracting Inc submitted 68 bids on Indiana DOT contracts in the data, from 09 FEB 2022 to 07 OCT 2026, and was the low bidder on 25 of them (37%). When it was not low, its total sat a median +13% above the low bid.

Owner
Indiana DOT
Low bid volume
$36,185,877
Latest bid
07 OCT 2026
Data through
05 NOV 2026
68Bids
25Low bids
37Win rate, percent
+13%Median gap to the low bid when not low, 43 bids

By year

YearBidsLow bidsWin rate
202216850%
20238450%
20248450%
20256117%
202630827%
Michiana Contracting Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Fort Wayne171165%
LaPorte14429%
Crawfordsville12325%
Greenfield10440%
Seymour9111%
Vincennes4250%
Fort Wayne, LaPorte100%
Crawfordsville, LaPorte100%
Michiana Contracting Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL6565 (100%)$1.00$1.00
Contract liens109-08360DOL6565 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL6565 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL4949 (100%)$1.00$1.00
Construction sign, type A801-06640EACH2817 (61%)$200.00$200.00
Quality adjustments, temporary traffic control devices and markings109-08443DOL1616 (100%)$1.00$1.00
Computer system equipment628-11976EACH1813 (72%)$375.00$802.75
Construction sign, type B801-06645EACH2111 (52%)$130.00$105.00
Sign, sheet, and supports, remove802-07059EACH2010 (50%)$42.88$95.00
Conduit, HDPE, 2 in. schedule 80805-11815LFT149 (64%)$22.00$30.00
Line, remove808-06716LFT119 (82%)$0.95$0.75
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL99 (100%)$1.00$1.00
Michiana Contracting Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Michiana Contracting Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 OCT 2026T-45199-AGreenfieldTRAFFIC SIGNAL MODERNIZATION3 of 5$396,628+17%
07 OCT 2026T-45540-ACrawfordsvilleTRAFFIC SIGNALS4 of 7$2,136,729+10%
07 OCT 2026T-45913-AFort WayneSIGNING1 of 9$149,910Low, 29% under the second
07 OCT 2026T-45939-ASeymourSIGN MODERNIZATION4 of 8$397,910+23%
07 OCT 2026T-46015-AGreenfieldSIGN MODERNIZATION5 of 7$281,910+49%
02 SEP 2026T-45742-ACrawfordsvilleTRAFFIC SIGNALS MODERNIZATION7 of 7$594,910+51%
02 SEP 2026T-45968-AFort WayneUN-SIGNALIZED INTERSECTION SIGN AND MARKING VISIBILITY1 of 5$299,628Low, 2.0% under the second
02 SEP 2026T-45970-AFort WaynePAVEMENT MARKINGS1 of 1$277,628Low
02 SEP 2026T-46035-ALaPorteSIGNING3 of 5$845,910+8.0%
05 AUG 2026T-44720-AGreenfieldSIGN INSTALLATION2 of 12$712,323+2.0%
05 AUG 2026T-46032-ALaPortePEDESTRIAN FLASHING BEACONS, INSTALLED2 of 4$87,910+20%
08 JUL 2026T-45920-AVincennesUN-SIGNALIZED INTERSECTION SIGN AND MARKING VISIBILITY1 of 2$296,910Low, 17% under the second
08 JUL 2026T-45932-ASeymourTRAFFIC SIGNALS2 of 4$334,910+5.0%
08 JUL 2026T-45933-ASeymourNEW FLASHER INSTALLATION2 of 4$417,628+15%
08 JUL 2026T-45974-AFort WayneSIGNING2 of 8$220,910+1.0%
08 JUL 2026T-46006-AGreenfieldLIGHTING AND SIGN INSTALLATION3 of 8$392,910+1.0%
08 JUL 2026T-46037-ALaPorteTRAFFIC SIGNALS2 of 4$406,910+6.0%
07 MAY 2026T-46034-BLaPorteSIGNING3 of 6$1,148,910+3.0%
08 APR 2026T-43854-AFort WayneTRAFFIC SIGNALS MODERNIZATION AND SAFETY REVISIONS2 of 3$1,191,910+1.0%
08 APR 2026T-46090-ACrawfordsvilleTRAFFIC SIGNALS3 of 3$1,088,910+13%
11 MAR 2026T-42995-ALaPorteINTERSECTION CONFLICT WARNING SYSTEM INSTALLATION1 of 2$776,910Low, 47% under the second
11 MAR 2026T-46089-ACrawfordsvilleNEW SIGNAL INSTALLATION4 of 4$467,211+27%
11 FEB 2026T-44000-ALaPorteSIGNAL MODERNIZATION1 of 3$642,628Low, 29% under the second
11 FEB 2026T-44798-AFort WayneITS TRAFFIC MANAGEMENT SYSTEMS1 of 4$799,999Low, 27% under the second
11 FEB 2026T-45891-AFort WayneSIGNING INSTALLATION OR REPAIR2 of 6$177,910+50%
Michiana Contracting Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy