INDOT contract T-45948-A bid tabulation

TRAFFIC SIGNALS. Let by Indiana DOT on February 11, 2026, Bartholomew, Seymour. 3 bids received; low bid $965,502 by Signal Construction Inc.

Owner
Indiana DOT
Letting
11 FEB 2026
Pay items
15
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Signal Construction Inc$965,502Low
2Morphey Construction Inc.$1,135,739+18%
3Michiana Contracting Inc$1,441,910+49%
INDOT contract T-45948-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Signal Construction Inc2. Morphey Construction Inc.3. Michiana Contracting Inc
0001Construction engineering (105-06845)LS1$3,000.00$10,000$12,500
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00
0004Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00
0005Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00
0006Mobilization and demobilization (110-01001)LS1$36,478$110,000$70,000
0007Construction sign, type A (801-06640)EACH24$319.00$500.00$319.00
0008Construction sign, type B (801-06645)EACH6$119.00$500.00$119.00
0009Maintaining traffic (801-06775)LS1$4,846.00$110,000$51,000
0010Miscellaneous equipment for traffic signals (805-01579)LS1$275,525$250,000$365,401
0011Emergency vehicle preemption detector, single channel, one direction (805-03978)EACH4$8,100.00$7,500.00$11,500
0012Emergency vehicle preemption detector, two channel, two direction (805-03979)EACH58$9,055.00$8,000.00$12,000
0013Emergency vehicle confirmation light kit (805-03980)EACH129$207.00$500.00$800.00
0014Controller (805-06483)EACH4$5,467.00$5,000.00$6,800.00
0015Signal cable, control, copper, 3C/14 gauge (805-78480)LFT12,447$2.50$5.00$5.00
INDOT contract T-45948-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy