KYTC contract 25-1011 bid tabulation
BRIDGE WITH GRADE, DRAIN & SURFACE I-264. Let by Kentucky Transportation Cabinet on May 22, 2025. 2 bids received; low bid $129,880,000 by Cleary Construction Inc, +7.8% against the engineer's estimate of $120,443,005.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 MAY 2025
- Pay items
- 442
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cleary Construction Inc | $129,880,000 | Low | +8.0% |
| 2 | Louisville Paving Company Inc | $129,994,000 | 0.0% | +8.0% |
Engineer's estimate: $120,443,005.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cleary Construction Inc | 2. Louisville Paving Company Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 67,098 | $36.00 | $45.00 |
| 0020 | Drainage blanket-type II-asph | TON A A | 21,166 | $68.25 | $70.00 |
| 0030 | Asphalt seal aggregate | TON A A | 288 | $122.43 | $100.33 |
| 0040 | Asphalt seal coat | TON A A | 34 | $1,821.02 | $856.00 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 16,035 | $105.00 | $95.00 |
| 0060 | Leveling & wedging PG76-22 | TON A A | 288 | $189.00 | $170.00 |
| 0070 | CL4 asph base 1.50D PG76-22 | TON A A | 7,656 | $85.05 | $110.00 |
| 0080 | CL2 asph base 1.00D PG64-22 | TON A A | 1,462 | $114.45 | $110.00 |
| 0090 | CL3 asph base 1.00D PG64-22 | TON A A | 6,563 | $94.50 | $110.00 |
| 0100 | CL3 asph base 1.00D PG76-22 | TON A A | 2,971 | $105.00 | $105.00 |
| 0110 | CL4 asph base 1.00D PG64-22 | TON A A | 41,716 | $89.25 | $95.00 |
| 0120 | CL4 asph base 1.00D PG76-22 | TON A A | 15,602 | $99.75 | $105.00 |
| 0130 | Asphalt prime coat | TON A A | 67 | $892.50 | $0.01 |
| 0140 | CL2 asph surf 0.38D PG64-22 | TON A A | 768 | $189.00 | $150.00 |
| 0150 | CL3 asph surf 0.38A PG76-22 | TON A A | 2,099 | $126.00 | $150.00 |
| 0160 | CL4 asph surf 0.38A PG76-22 | TON A A | 20,228 | $126.00 | $125.00 |
| 0170 | JPC pavement-8 in | SQYD A A | 102 | $178.67 | $170.16 |
| 0180 | Cem conc ent pavement-8 in | SQYD A A | 68 | $149.59 | $142.47 |
| 0190 | Asphalt pave milling & texturing | TON A A | 15,046 | $24.15 | $50.00 |
| 0200 | CL3 asph surf 0.38A PG64-22 | TON A A | 896 | $120.75 | $150.00 |
| 0210 | Asphalt material for tack non-tracking | TON A A | 150 | $0.01 | $0.01 |
| 0220 | Crushed aggregate size no 2 | TON A A | 5,782 | $38.00 | $50.00 |
| 0230 | Plug pipe | EACH A A | 12 | $2,161.81 | $573.30 |
| 0240 | Cap drop box inlet | EACH A A | 3 | $3,500.00 | $1,591.13 |
| 0250 | Flume inlet type 2 | EACH A A | 2 | $8,500.00 | $5,151.90 |
| 0260 | Fill and cap inlet | EACH A A | 12 | $4,000.00 | $1,591.13 |
| 0270 | Fill and cap manhole | EACH A A | 1 | $4,000.00 | $2,098.57 |
| 0280 | Adjust manhole frame to grade | EACH A A | 2 | $2,500.00 | $2,386.13 |
| 0290 | Adjust manhole | EACH A A | 2 | $2,500.00 | $2,386.13 |
| 0300 | Standard curb and gutter | LF A A | 2,365 | $33.90 | $32.29 |
| 0310 | Standard curb and gutter mod | LF A A | 5,018 | $31.90 | $30.38 |
| 0320 | Standard header curb | LF A A | 703 | $49.90 | $47.52 |
| 0330 | Standard barrier median type 2 | SQYD A A | 984 | $118.29 | $112.66 |
| 0340 | Standard barrier median type 4 | SQYD A A | 126 | $140.89 | $134.18 |
| 0350 | Conc median barrier type A TL5 56 in | LF A A | 5,529 | $243.15 | $231.57 |
| 0360 | Delineator for guardrail mono directional white | EACH A A | 78 | $15.75 | $15.00 |
| 0370 | Delineator for guardrail mono directional yello | EACH A A | 129 | $15.75 | $15.00 |
| 0380 | Relocate temp conc barrier | LF A A | 19,527 | $15.00 | $20.00 |
| 0390 | Barricade-type III | EACH A A | 138 | $194.78 | $212.00 |
| 0400 | Paved ditch type 1 mod | SQYD A A | 424 | $134.97 | $128.54 |
| 0410 | Temp ditch | LF A A | 15,175 | $1.00 | $1.70 |
| 0420 | Clean temp ditch | LF A A | 7,588 | $0.01 | $1.70 |
| 0430 | Roadway excavation | CUYD A A | 183,650 | $56.25 | $75.00 |
| 0440 | Water | MGAL A A | 3,275 | $0.01 | $0.01 |
| 0450 | Fence-woven wire type 1 | LF A A | 4,254 | $9.45 | $9.00 |
| 0460 | Guardrail connector to conc med barr | EACH A A | 1 | $5,775.00 | $5,500.00 |
| 0470 | Guardrail end treatment type 1 | EACH A A | 8 | $4,725.00 | $4,500.00 |
| 0480 | Guardrail end treatment type 2A | EACH A A | 13 | $1,050.00 | $1,000.00 |
| 0490 | Remove guardrail | LF A A | 13,956 | $2.10 | $2.00 |
| 0500 | Guardrail end treatment type 4A | EACH A A | 4 | $4,725.00 | $4,500.00 |
| 0510 | Right-of-way monument type 1 | EACH A A | 25 | $126.00 | $120.00 |
| 0520 | Right-of-way monument type 1A | EACH A A | 7 | $126.00 | $120.00 |
| 0530 | Witness post | EACH A A | 3 | $126.00 | $120.00 |
| 0540 | Channel lining class II | TON A A | 6,220 | $75.00 | $60.00 |
| 0550 | Channel lining class III | TON A A | 2,187 | $85.00 | $100.00 |
| 0560 | Clearing and grubbing | LS A A | 1 | $950,000 | $800,000 |
| 0570 | Concrete-class B | CUYD A A | 75.25 | $735.00 | $740.03 |
| 0580 | Temporary signs | SQFT A A | 3,950 | $6.68 | $5.00 |
| 0590 | Edge key | LF A A | 578 | $51.45 | $175.00 |
| 0600 | Fabric-geotextile class 1 | SQYD A A | 19,174 | $3.50 | $1.56 |
| 0610 | Fabric-geotextile class 1A | SQYD A A | 7,500 | $4.50 | $3.30 |
| 0620 | Maintain & control traffic | LS A A | 1 | $3,850,000 | $3,946,902 |
| 0630 | Maintain & control traffic | LS A A | 1 | $4,000,000 | $4,775,000 |
| 0640 | Portable changeable message sign | EACH A A | 8 | $10,907 | $14,310 |
| 0650 | Mobilization for mill & text | LS A A | 1 | $5,250.00 | $10,000 |
| 0660 | Mobilization for mill & text | LS A A | 1 | $5,250.00 | $10,000 |
| 0670 | Safeloading | CUYD A A | 168 | $350.00 | $285.00 |
| 0680 | Temp silt fence | LF A A | 15,175 | $3.00 | $1.63 |
| 0690 | Silt trap type A | EACH A A | 101 | $300.00 | $500.00 |
| 0700 | Silt trap type B | EACH A A | 101 | $150.00 | $500.00 |
| 0710 | Silt trap type C | EACH A A | 101 | $250.00 | $250.00 |
| 0720 | Clean silt trap type A | EACH A A | 101 | $1.00 | $500.00 |
| 0730 | Clean silt trap type B | EACH A A | 101 | $1.00 | $500.00 |
| 0740 | Clean silt trap type C | EACH A A | 101 | $1.00 | $250.00 |
| 0750 | Sidewalk-4 in concrete | SQYD A A | 1,860 | $74.26 | $70.72 |
| 0760 | Sidewalk-6 in concrete | SQYD A A | 2,381 | $78.89 | $75.15 |
| 0770 | Staking | LS A A | 1 | $950,000 | $550,000 |
| 0780 | Staking | LS A A | 1 | $950,000 | $550,000 |
| 0790 | Remove structure | LS A A | 1 | $921,181 | $1,050,000 |
| 0800 | Remove structure | LS A A | 1 | $1,301,885 | $1,575,000 |
| 0810 | Arrow panel | EACH A A | 19 | $4,062.45 | $5,830.00 |
| 0820 | Relocate crash cushion | EACH A A | 4 | $3,874.50 | $9,750.00 |
| 0830 | Conc barrier wall type 9T | LF A A | 24,045 | $61.81 | $55.00 |
| 0840 | Erosion control blanket | SQYD A A | 41,167 | $1.82 | $1.73 |
| 0850 | Temp mulch | SQYD A A | 332,440 | $0.22 | $0.21 |
| 0860 | Temp seeding and protection | SQYD A A | 254,120 | $0.29 | $0.28 |
| 0870 | Initial fertilizer | TON A A | 12.75 | $1,034.25 | $985.00 |
| 0880 | Maintenance fertilizer | TON A A | 17.25 | $1,034.25 | $985.00 |
| 0890 | Seeding and protection | SQYD A A | 201,932 | $0.50 | $0.45 |
| 0900 | Sodding | SQYD A A | 2,370 | $6.27 | $5.97 |
| 0910 | Agricultural limestone | TON A A | 258 | $101.85 | $97.00 |
| 0920 | Flexible delineator post-M/W | EACH A A | 91 | $73.50 | $70.00 |
| 0930 | Flexible delineator post-M/Y | EACH A A | 99 | $73.50 | $70.00 |
| 0940 | Pave striping-temp paint-4 in | LF A A | 179,051 | $0.29 | $0.28 |
| 0950 | Pave striping-temp paint-6 in | LF A A | 143,056 | $0.32 | $0.30 |
| 0960 | Pave striping-temp paint-12 in | LF A A | 12,000 | $0.48 | $0.46 |
| 0970 | Pave striping-perm paint-6 in | LF A A | 3,675 | $0.34 | $0.32 |
| 0980 | Pave striping-thermo-6 in W | LF A A | 59,684 | $1.47 | $1.40 |
| 0990 | Pave striping-thermo-6 in Y | LF A A | 45,751 | $1.47 | $1.40 |
| 1000 | Pave striping-thermo-12 in W | LF A A | 17,178 | $3.15 | $3.00 |
| 1010 | Pave striping-thermo-12 in Y | LF A A | 231 | $6.25 | $5.95 |
| 1020 | Pave striping-temp rem tape-W | LF A A | 900 | $2.63 | $2.50 |
| 1030 | Pave striping-temp rem tape-Y | LF A A | 900 | $2.63 | $2.50 |
| 1040 | Pave striping-dur TY 1-6 in W | LF A A | 462 | $21.00 | $20.00 |
| 1050 | Pave striping-dur TY 1-6 in Y | LF A A | 440 | $21.00 | $20.00 |
| 1060 | Pave marking-thermo X-walk-6 in | LF A A | 2,651 | $4.73 | $4.50 |
| 1070 | Pave marking-thermo stop bar-24IN | LF A A | 805 | $14.96 | $14.25 |
| 1080 | Pave marking-thermo cross-hatch | SQFT A A | 455 | $7.30 | $6.95 |
| 1090 | Pave marking-paint cross-hatch | SQFT A A | 115 | $3.10 | $2.95 |
| 1100 | Pave marking-thermo STR arrow | EACH A A | 12 | $162.75 | $155.00 |
| 1110 | Pave marking-thermo curv arrow | EACH A A | 168 | $173.25 | $165.00 |
| 1120 | Pave marking-thermo comb arrow | EACH A A | 18 | $204.75 | $195.00 |
| 1130 | Pave marking-thermo only | EACH A A | 5 | $372.75 | $355.00 |
| 1140 | Pavement marking removal | SQFT A A | 790 | $10.50 | $10.00 |
| 1150 | Remove pavement marker type V | EACH A A | 1,629 | $5.25 | $6.38 |
| 1160 | Inlaid pavement marker-MW | EACH A A | 150 | $35.70 | $34.00 |
| 1170 | Inlaid pavement marker-by | EACH A A | 131 | $35.70 | $34.00 |
| 1180 | Inlaid pavement marker-B W/R | EACH A A | 1,681 | $35.70 | $34.00 |
| 1190 | Inlaid pavement marker-B Y/R | EACH A A | 162 | $35.70 | $34.00 |
| 1200 | Crash cushion TY VI class BT TL3 | EACH A A | 11 | $5,255.25 | $13,841 |
| 1210 | Fuel adjustment | DOLL A A | 249,183 | $1.00 | $1.00 |
| 1220 | Asphalt adjustment | DOLL A A | 402,720 | $1.00 | $1.00 |
| 1230 | S manhole adjust to grade | EACH A A | 5 | $3,069.01 | $2,386.13 |
| 1240 | Joint adhesive | LF A A | 113,228 | $0.68 | $0.40 |
| 1250 | Temporary pipe | LF A A | 1,000 | $105.00 | $129.32 |
| 1260 | Object marker TY 3 | EACH A A | 12 | $157.50 | $30.00 |
| 1270 | Law enforcement officer | HOUR A A | 2,800 | $100.00 | $75.00 |
| 1280 | Remove crash cushion | EACH A A | 2 | $3,000.00 | $1,381.67 |
| 1290 | Sawcut pavement | LF A A | 52,499 | $2.00 | $1.11 |
| 1300 | Longitudinal edge key | LF A A | 46,706 | $1.00 | $2.50 |
| 1310 | Pave mark thermo cone cap-solid yellow | SQFT A A | 22 | $8.35 | $7.95 |
| 1320 | G/R steel W beam-S face (7 FT post) | LF A A | 11,378.50 | $31.50 | $30.00 |
| 1330 | Pave marking-thermo yield bar-36 in | LF A A | 122 | $35.70 | $34.00 |
| 1340 | Water blasting existing stripe | LF A A | 316,200 | $0.82 | $0.78 |
| 1350 | Pavement marking-thermo letters | EACH A A | 10 | $309.75 | $295.00 |
| 1360 | Barrier wall transition | LF A A | 75 | $624.55 | $594.81 |
| 1370 | Detectable warnings | SQFT A A | 795 | $49.01 | $46.68 |
| 1380 | Pave mark TY 1 tape X-walk-6 in | LF A A | 263 | $29.40 | $28.00 |
| 1390 | Pave mark-thermo-X-walk-24 in | LF A A | 350 | $39.90 | $38.00 |
| 1400 | Pave mark TY 1 tape stop bar-24 in | LF A A | 25 | $46.20 | $44.00 |
| 1410 | Pave mark TY 1 tape-curv arrow | EACH A A | 2 | $729.75 | $695.00 |
| 1420 | Concrete trench | LF A A | 1,612 | $24.34 | $23.18 |
| 1430 | Pave mark thermo-lane reduction arrow | EACH A A | 21 | $414.75 | $395.00 |
| 1440 | Pave stripe-wet ref tape-6 in Y | LF A A | 161 | $21.00 | $20.00 |
| 1450 | Pave stripe-wet ref tape-6 in W | LF A A | 399 | $21.00 | $20.00 |
| 1460 | Pave mark thermo chevron-48 in | LF A A | 3,492 | $29.40 | $28.00 |
| 1470 | Remove | LF A A | 4,049 | $117.76 | $145.00 |
| 1480 | Object marker type 1 | EACH A A | 11 | $157.50 | $150.00 |
| 1490 | Pave mark thermo chevron | SQFT A A | 1,279 | $7.35 | $7.00 |
| 1500 | Pave marking-thermo dotted lane exten | LF A A | 294 | $4.25 | $4.05 |
| 1510 | Pave mark thermo-wrong way arrow | EACH A A | 14 | $603.75 | $575.00 |
| 1520 | Pave marking-thermo elong route shield | EACH A A | 18 | $3,937.50 | $3,750.00 |
| 1530 | Rail system single slope - 40 in | LF A A | 8,545 | $1,050.00 | $1,170.00 |
| 1540 | Queue protection vehicle | HOUR A A | 1,920 | $100.00 | $68.74 |
| 1550 | Thrie beam guardrail transition TL-3 | EACH A A | 10 | $4,200.00 | $4,000.00 |
| 1560 | Thrie beam guardrail transition TL-2 | EACH A A | 4 | $3,675.00 | $3,500.00 |
| 1570 | Furnish queue protection vehicles | MONT A A | 12 | $5,000.00 | $4,717.00 |
| 1580 | Portable queue warning alert system | MONT A A | 12 | $2,000.00 | $1,400.00 |
| 1590 | Queue warning PCMS | MONT A A | 72 | $550.00 | $530.00 |
| 1600 | Queue warning portable radar sensors | MONT A A | 72 | $100.00 | $225.00 |
| 1610 | Pave mark TY 1 tape lane reduction arrow | EACH A A | 1 | $2,047.50 | $1,950.00 |
| 1620 | Pave mark-thermo poly mod lane use arrow | EACH A A | 8 | $656.25 | $625.00 |
| 1630 | Pave mark-thermo poly mod lane combo arr | EACH A A | 8 | $761.25 | $725.00 |
| 1640 | Pave mark TY 1 tape X-walk-24 in | LF A A | 350 | $39.90 | $38.00 |
| 1650 | Pave stripe-wet ref cont tape-6 in W | LF A A | 1,424 | $26.25 | $25.00 |
| 1660 | Pave stripe-wet ref cont tape-6 in Y | LF A A | 712 | $26.25 | $25.00 |
| 1670 | Culvert pipe-18 in | LF A A | 45 | $281.27 | $353.49 |
| 1680 | Culvert pipe-24 in | LF A A | 93 | $200.00 | $285.09 |
| 1690 | Culvert pipe-30 in | LF A A | 79 | $325.00 | $366.63 |
| 1700 | Culvert pipe-36 in | LF A A | 14 | $350.00 | $423.27 |
| 1710 | Culvert pipe-48 in | LF A A | 19 | $375.00 | $452.06 |
| 1720 | Storm sewer pipe-15 in | LF A A | 3,575 | $150.00 | $144.78 |
| 1730 | Storm sewer pipe-18 in | LF A A | 5,490 | $175.00 | $180.43 |
| 1740 | Storm sewer pipe-24 in | LF A A | 1,083 | $200.00 | $238.15 |
| 1750 | Storm sewer pipe-30 in | LF A A | 199 | $250.00 | $140.03 |
| 1760 | Storm sewer pipe-36 in | LF A A | 1,072 | $325.00 | $333.03 |
| 1770 | Storm sewer pipe-42 in | LF A A | 1,390 | $450.00 | $345.22 |
| 1780 | Storm sewer pipe-48 in | LF A A | 1,485 | $475.00 | $437.00 |
| 1790 | Storm sewer pipe-15 in equiv | LF A A | 30 | $150.00 | $243.31 |
| 1800 | Perforated pipe-6 in | LF A A | 20,363 | $30.00 | $24.19 |
| 1810 | Non-perforated pipe-6 in | LF A A | 8,122 | $32.00 | $27.50 |
| 1820 | Inspect & certify edge drain system | LS A A | 1 | $9,450.00 | $16,434 |
| 1830 | Perf pipe headwall TY 2-6 in | EACH A A | 12 | $2,000.00 | $750.00 |
| 1840 | Perf pipe headwall TY 3-6 in | EACH A A | 12 | $2,000.00 | $750.00 |
| 1850 | Perf pipe headwall TY 4-6 in | EACH A A | 8 | $2,000.00 | $750.00 |
| 1860 | Pipe culvert headwall-15 in | EACH A A | 20 | $5,000.00 | $2,763.93 |
| 1870 | Pipe culvert headwall-18 in | EACH A A | 20 | $5,250.00 | $2,868.64 |
| 1880 | Pipe culvert headwall-24 in | EACH A A | 3 | $5,500.00 | $3,488.85 |
| 1890 | Pipe culvert headwall-30 in | EACH A A | 1 | $5,750.00 | $3,869.02 |
| 1900 | Pipe culvert headwall-36 in | EACH A A | 4 | $6,000.00 | $4,416.99 |
| 1910 | Sloped box inlet-outlet type 2 | EACH A A | 2 | $5,000.00 | $9,003.28 |
| 1920 | S & F box inlet-outlet-24 in | EACH A A | 1 | $5,000.00 | $7,575.33 |
| 1930 | Curb box inlet type A | EACH A A | 19 | $10,500 | $13,914 |
| 1940 | Curb box inlet type A mod | EACH A A | 8 | $10,000 | $13,914 |
| 1950 | Curb box inlet type B | EACH A A | 5 | $10,000 | $12,152 |
| 1960 | Curb box inlet type B-T | EACH A A | 1 | $7,500.00 | $6,856.05 |
| 1970 | Drop box inlet type 1 | EACH A A | 8 | $10,000 | $8,646.08 |
| 1980 | Drop box inlet type 1 mod | EACH A A | 4 | $8,500.00 | $8,646.08 |
| 1990 | Drop box inlet type 2 mod | EACH A A | 2 | $10,000 | $10,054 |
| 2000 | Drop box inlet type 3 | EACH A A | 1 | $9,500.00 | $7,499.11 |
| 2010 | Drop box inlet type 5A | EACH A A | 4 | $10,000 | $9,263.06 |
| 2020 | Drop box inlet type 10 mod | EACH A A | 4 | $10,000 | $9,612.62 |
| 2030 | Drop box inlet type 11 | EACH A A | 2 | $6,000.00 | $4,326.34 |
| 2040 | Drop box inlet type 13G | EACH A A | 9 | $6,500.00 | $4,416.55 |
| 2050 | Drop box inlet type 13S | EACH A A | 4 | $8,000.00 | $5,576.40 |
| 2060 | Drop box inlet type 14 | EACH A A | 1 | $9,000.00 | $3,881.72 |
| 2070 | Drop box inlet type 15 | EACH A A | 2 | $7,000.00 | $4,381.11 |
| 2080 | Drop box inlet type 16S | EACH A A | 1 | $7,500.00 | $5,792.26 |
| 2090 | Conc med barr box inlet TY A1 | EACH A A | 3 | $15,000 | $4,237.95 |
| 2100 | Conc med barr box inlet TY B1 | EACH A A | 51 | $15,000 | $4,760.74 |
| 2110 | Conc med barr box inlet TY B1 TL5 56 | EACH A A | 8 | $15,000 | $21,038 |
| 2120 | Conc med barr box inlet TY B2 TL5 56 | EACH A A | 24 | $15,000 | $23,074 |
| 2130 | Conc med barr box inlet TY A2 TL5 56 | EACH A A | 1 | $17,500 | $27,796 |
| 2140 | Junction box | EACH A A | 21 | $7,500.00 | $5,326.72 |
| 2150 | Reconstruct inlet | EACH A A | 2 | $5,000.00 | $5,374.05 |
| 2160 | Cored hole drainage box con-6 in | EACH A A | 104 | $500.00 | $275.00 |
| 2170 | Manhole type A | EACH A A | 4 | $8,000.00 | $4,742.18 |
| 2180 | Manhole type C mod | EACH A A | 1 | $20,000 | $27,827 |
| 2190 | Cap inlet | SQYD A A | 8 | $2,500.00 | $2,377.73 |
| 2200 | Fabric-geotextile class 2 for pipe | SQYD A A | 19,992 | $2.00 | $2.00 |
| 2210 | Concrete-class A | CUYD A A | 31 | $2,500.00 | $1,423.42 |
| 2220 | Drop box inlet TY 16G(mod) | EACH A A | 4 | $7,500.00 | $3,316.94 |
| 2230 | Cored hole drainage box con- 18 in | EACH A A | 7 | $3,500.00 | $1,000.00 |
| 2240 | Adjust drainage structure | EACH A A | 3 | $3,000.00 | $3,443.64 |
| 2250 | Cored hole drainage box con | EACH A A | 1 | $4,000.00 | $1,000.00 |
| 2260 | Drainage junction box TY B | EACH A A | 3 | $10,788 | $4,252.89 |
| 2270 | Bore and jack pipe-36 in | LF A A | 155 | $1,850.00 | $2,348.25 |
| 2280 | Pipeline inspection | LF A A | 14,148 | $2.35 | $2.45 |
| 2290 | Armored edge for concrete | LF A A | 256 | $375.00 | $175.00 |
| 2300 | Expansion dam-4 in neoprene | LF A A | 256 | $575.00 | $1,500.00 |
| 2310 | Remove concrete masonry | CUYD A A | 13 | $650.00 | $500.00 |
| 2320 | Foundation preparation | LS A A | 1 | $40,000 | $75,000 |
| 2330 | Concrete-class A | CUYD A A | 25.30 | $2,300.00 | $2,750.00 |
| 2340 | Steel reinforcement | LB A A | 2,523 | $3.00 | $2.50 |
| 2350 | Remove concrete masonry | CUYD A A | 12 | $750.00 | $500.00 |
| 2360 | Foundation preparation | LS A A | 1 | $40,000 | $75,000 |
| 2370 | Concrete-class A | CUYD A A | 26.40 | $2,300.00 | $2,750.00 |
| 2380 | Steel reinforcement | LB A A | 2,095 | $3.00 | $2.50 |
| 2390 | Lightweight aggregate fill | CUYD A A | 156 | $236.56 | |
| 2400 | Eps foam block | CUFT A A | 2,524 | $35.00 | |
| 2410 | 4 in concrete load distributor | SQYD A A | 94 | $160.00 | |
| 2420 | Granular embankment | CUYD A A | 70 | $150.00 | $99.00 |
| 2430 | Foundation preparation | LS A A | 1 | $70,000 | $75,000 |
| 2440 | Concrete-class A | CUYD A A | 50.10 | $2,300.00 | $2,750.00 |
| 2450 | Steel reinforcement | LB A A | 4,590 | $3.00 | $2.50 |
| 2460 | Granular embankment | CUYD A A | 146 | $160.00 | $99.00 |
| 2470 | Foundation preparation | LS A A | 1 | $70,000 | $75,000 |
| 2480 | Concrete-class A | CUYD A A | 38.10 | $2,300.00 | $2,750.00 |
| 2490 | Steel reinforcement | LB A A | 4,340 | $3.00 | $2.50 |
| 2500 | Eps foam block | CUFT A A | 36,830 | $35.00 | $5.90 |
| 2510 | Structure granular backfill | CUYD A A | 1,000 | $129.15 | $113.00 |
| 2520 | Armored edge for concrete | LF A A | 137.40 | $129.15 | $100.00 |
| 2530 | Structure excav-solid rock | CUYD A A | 395 | $168.00 | $345.00 |
| 2540 | Foundation preparation | LS A A | 1 | $532,823 | $250,000 |
| 2550 | Concrete-class A | CUYD A A | 201 | $1,433.25 | $1,400.00 |
| 2560 | Concrete-class AA | CUYD A A | 589.90 | $1,858.50 | $1,500.00 |
| 2570 | Mechanical reinf coupler #5 | EACH A A | 24 | $46.20 | $40.00 |
| 2580 | Mechanical reinf coupler #9 | EACH A A | 28 | $149.10 | $124.00 |
| 2590 | Mechanical reinf coupler #5 epoxy coated | EACH A A | 588 | $49.35 | $42.00 |
| 2600 | Steel reinforcement | LB A A | 39,830 | $1.42 | $1.70 |
| 2610 | Steel reinforcement-epoxy coated | LB A A | 87,460 | $1.58 | $1.85 |
| 2620 | Structural steel | LS A A | 1 | $3,277,168 | $2,429,000 |
| 2630 | Shear connectors | LS A A | 1 | $27,510 | $21,835 |
| 2640 | Rock soundings | LF A A | 128 | $27.30 | $20.00 |
| 2650 | Rock corings | LF A A | 302 | $136.50 | $61.00 |
| 2660 | Concrete sealing | SQFT A A | 23,320 | $3.57 | $1.02 |
| 2670 | Rail system single slope - 40 in | LF A A | 394.80 | $199.50 | $170.93 |
| 2680 | Drilled shaft-36 in solid rock | LF A A | 112 | $1,008.00 | $1,840.00 |
| 2690 | Drilled shaft-42 in common | LF A A | 80 | $2,100.00 | $1,980.00 |
| 2700 | Structure granular backfill | CUYD A A | 11,000 | $134.40 | $113.00 |
| 2710 | Masonry coating | SQYD A A | 2,808 | $28.35 | $20.81 |
| 2720 | Armored edge for concrete | LF A A | 2,120 | $105.00 | $100.00 |
| 2730 | Structure excav-solid rock | CUYD A A | 127 | $278.25 | $500.00 |
| 2740 | Foundation preparation | LS A A | 1 | $904,680 | $350,000 |
| 2750 | Concrete-class A | CUYD A A | 1,709.70 | $1,470.00 | $1,675.00 |
| 2760 | Concrete-class AA | CUYD A A | 1,064.30 | $1,680.00 | $1,250.00 |
| 2770 | Mechanical reinf coupler #5 epoxy coated | EACH A A | 86 | $50.40 | $42.00 |
| 2780 | Mechanical reinf coupler #6 epoxy coated | EACH A A | 86 | $61.95 | $52.00 |
| 2790 | Steel reinforcement-epoxy coated | LB A A | 790,862 | $1.58 | $1.90 |
| 2800 | Structural steel | LS A A | 1 | $263,309 | $350,000 |
| 2810 | Shear connectors | LS A A | 1 | $11,445 | $9,090.00 |
| 2820 | Approach slab | SQYD A A | 1,392 | $698.25 | $615.00 |
| 2830 | Precast PC box beam SB42 | LF A A | 2,192 | $672.00 | $950.00 |
| 2840 | Bridge chain link fence-6 FT | LF A A | 216 | $246.75 | $350.00 |
| 2850 | Rock soundings | LF A A | 174 | $27.30 | $20.00 |
| 2860 | Rock corings | LF A A | 1,705 | $136.50 | $61.00 |
| 2870 | Drilled shaft-66 in (rock) | LF A A | 682 | $1,638.00 | $3,125.00 |
| 2880 | Detectable warnings | SQFT A A | 204 | $78.75 | $47.52 |
| 2890 | Drilled shaft-72 in common | LF A A | 70 | $3,990.00 | $2,950.00 |
| 2900 | Concrete sealing | SQFT A A | 26,613 | $3.68 | $0.98 |
| 2910 | Mechanical reinf coupler #8-epoxy coated | EACH A A | 3 | $129.15 | $106.00 |
| 2920 | Rail system single slope - 36 in | LF A A | 356 | $204.75 | $179.75 |
| 2930 | Steel handrail | LF A A | 356 | $115.50 | $65.00 |
| 2940 | Mechanical reinf coupler #10-epoxy coat | EACH A A | 52 | $234.15 | $192.00 |
| 2945 | Site preparation | LS A A | 1 | $525,000 | $595,000 |
| 2950 | Sound barrier wall | SQFT A A | 258,478 | $65.10 | $58.00 |
| 2955 | Foundation preparation | LS A A | 1 | $2,812,912 | $675,000 |
| 2960 | Drilled shaft-48 in-common | LF A A | 10 | $840.00 | $3,000.00 |
| 2970 | Drilled shaft-42 in-rock | LF A A | 6 | $1,365.00 | $3,000.00 |
| 2980 | Drilled shaft-36 in solid rock | LF A A | 2,268 | $682.50 | $860.00 |
| 2990 | Drilled shaft-42 in common | LF A A | 3,401 | $420.00 | $550.00 |
| 3000 | Delineator for barrier wall-B/Y | EACH A A | 50 | $50.00 | $19.00 |
| 3010 | SBM aluminum panel signs | SQFT A A | 11,360 | $42.00 | $40.00 |
| 3020 | SBM alum sheet signs .080 in | SQFT A A | 143 | $28.35 | $27.00 |
| 3030 | SBM alum sheet signs .125 in | SQFT A A | 1,958 | $30.45 | $29.00 |
| 3040 | Steel post type 1 | LF A A | 2,570 | $26.25 | $25.00 |
| 3050 | Steel post mile markers | EACH A A | 12 | $199.50 | $190.00 |
| 3060 | Sign bridge attachment bracket | EACH A A | 4 | $13,650 | $13,000 |
| 3070 | Rem overhead sign support STR | EACH A A | 8 | $7,875.00 | $7,500.00 |
| 3080 | Rem overhead struc conc base | EACH A A | 16 | $7,875.00 | $7,500.00 |
| 3090 | Oss galv steel 75 FT truss | EACH A A | 1 | $210,000 | $200,000 |
| 3100 | Oss galv steel 85 FT truss | EACH A A | 4 | $220,500 | $210,000 |
| 3110 | Oss galv steel 90 FT truss | EACH A A | 5 | $231,000 | $220,000 |
| 3120 | Oss galv steel 95 FT truss | EACH A A | 1 | $241,500 | $230,000 |
| 3130 | Class A concrete for signs | CUYD A A | 779 | $945.00 | $900.00 |
| 3140 | Steel reinforcement for signs | LB A A | 90,911 | $2.63 | $2.50 |
| 3150 | Oss galv steel 125 FT truss | EACH A A | 1 | $283,500 | $270,000 |
| 3160 | Oss galv steel 140 FT truss | EACH A A | 1 | $299,250 | $285,000 |
| 3170 | Oss galv steel 165 FT truss | EACH A A | 1 | $315,000 | $300,000 |
| 3180 | Roadway cross section | EACH A A | 15 | $210.00 | $300.00 |
| 3190 | Barrier wall post | EACH A A | 5 | $1,050.00 | $1,000.00 |
| 3200 | Remove sign | EACH A A | 69 | $210.00 | $200.00 |
| 3210 | GMSS type D | EACH A A | 27 | $525.00 | $500.00 |
| 3220 | Rem sign bridge mount attachment | EACH A A | 1 | $2,100.00 | $2,000.00 |
| 3230 | Barcode sign inventory | EACH A A | 221 | $26.25 | $25.00 |
| 3240 | Conduit-1 1/4 in | LF A A | 80 | $8.93 | $8.50 |
| 3250 | Conduit-2 in | LF A A | 40 | $12.60 | $12.00 |
| 3260 | Electrical junction box type B | EACH A A | 6 | $997.50 | $950.00 |
| 3270 | Trenching and backfilling | LF A A | 716 | $6.30 | $6.00 |
| 3280 | Piezoelectric sensor | EACH A A | 40 | $2,100.00 | $2,000.00 |
| 3290 | Loop wire | LF A A | 8,392 | $1.05 | $1.00 |
| 3300 | Cable-no. 14/7C | LF A A | 11,743 | $2.63 | $2.50 |
| 3310 | Messenger-15400 LB | LF A A | 3,882 | $11.55 | $11.00 |
| 3320 | Loop saw slot and fill | LF A A | 2,626 | $12.60 | $12.00 |
| 3330 | Install steel strain pole | EACH A A | 16 | $3,675.00 | $3,500.00 |
| 3340 | Temp relocation of signal head | EACH A A | 85 | $341.25 | $325.00 |
| 3350 | Remove and replace sidewalk | SQYD A A | 10 | $206.50 | $298.24 |
| 3360 | SBM alum sheet signs .080 in | SQFT A A | 77 | $28.35 | $25.00 |
| 3370 | Install span mounted sign | EACH A A | 20 | $262.50 | $250.00 |
| 3380 | Install pedestrian head-LED | EACH A A | 28 | $341.25 | $325.00 |
| 3390 | Install LED signal-3 section | EACH A A | 37 | $341.25 | $325.00 |
| 3400 | Install LED signal-5 section | EACH A A | 3 | $341.25 | $325.00 |
| 3410 | Install LED signal- 4 section | EACH A A | 9 | $341.25 | $325.00 |
| 3420 | Galvanized steel cabinet | EACH A A | 6 | $525.00 | $500.00 |
| 3430 | Wood post | EACH A A | 12 | $367.50 | $350.00 |
| 3440 | Install coordinating unit | EACH A A | 4 | $1,575.00 | $1,500.00 |
| 3450 | Electrical junction box type A | EACH A A | 7 | $1,837.50 | $1,750.00 |
| 3460 | Install pedestrian detector | EACH A A | 28 | $89.25 | $85.00 |
| 3470 | Traffic signal pole base | CUYD A A | 71 | $525.00 | $500.00 |
| 3480 | Install signal pedestal | EACH A A | 20 | $997.50 | $950.00 |
| 3490 | Install pedestal post | EACH A A | 1 | $787.50 | $750.00 |
| 3500 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 276 | $3.15 | $3.00 |
| 3510 | PVC conduit-2 in-schedule 80 | LF A A | 635 | $3.78 | $3.60 |
| 3520 | Install signal controller-TY atc | EACH A A | 4 | $19,163 | $18,250 |
| 3530 | Remove signal equipment | EACH A A | 5 | $18,638 | $17,750 |
| 3540 | Install radar presence detector type A | EACH A A | 15 | $1,260.00 | $1,200.00 |
| 3550 | Install radar advance detector type B | EACH A A | 1 | $1,260.00 | $1,200.00 |
| 3560 | Pole 30 FT MTG HT | EACH A A | 12 | $2,310.00 | $2,200.00 |
| 3570 | Pole 40 FT MTG HT | EACH A A | 64 | $3,097.50 | $2,950.00 |
| 3580 | Bracket 6 FT | EACH A A | 1 | $525.00 | $500.00 |
| 3590 | Bracket 8 FT | EACH A A | 9 | $735.00 | $700.00 |
| 3600 | Bracket 10 FT | EACH A A | 6 | $945.00 | $900.00 |
| 3610 | Bracket 12 FT | EACH A A | 15 | $971.25 | $925.00 |
| 3620 | Bracket 15 FT | EACH A A | 13 | $1,050.00 | $1,000.00 |
| 3630 | Pole base | EACH A A | 42 | $1,575.00 | $1,500.00 |
| 3640 | Pole base in median wall | EACH A A | 34 | $1,312.50 | $1,250.00 |
| 3650 | Transformer base | EACH A A | 42 | $997.50 | $950.00 |
| 3660 | Fused connector kit | EACH A A | 168 | $131.25 | $125.00 |
| 3670 | Conduit-2 in | LF A A | 1,800 | $12.60 | $12.00 |
| 3680 | Trenching and backfilling | LF A A | 7,800 | $6.30 | $6.00 |
| 3690 | Wire-no. 12 | LF A A | 10,500 | $1.31 | $1.25 |
| 3700 | Wire-no. 8 | LF A A | 26,700 | $2.63 | $2.50 |
| 3710 | Wire-no. 6 | LF A A | 26,200 | $3.15 | $3.00 |
| 3720 | Wire-no. 4 | LF A A | 4,600 | $3.94 | $3.75 |
| 3730 | Remove lighting | LS A A | 1 | $7,875.00 | $7,500.00 |
| 3740 | Electrical junction box type A | EACH A A | 17 | $1,837.50 | $1,750.00 |
| 3750 | Electrical junction box type C | EACH A A | 4 | $3,675.00 | $3,500.00 |
| 3760 | Maintain lighting | LS A A | 1 | $204,750 | $195,000 |
| 3770 | Bore and jack conduit | LF A A | 1,300 | $28.88 | $27.50 |
| 3780 | LED luminaire | EACH A A | 107 | $945.00 | $900.00 |
| 3790 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 7,000 | $3.15 | $3.00 |
| 3800 | PVC conduit-2 in-schedule 80 | LF A A | 1,400 | $3.78 | $3.60 |
| 3810 | PVC conduit-3 in-schedule 80 | LF A A | 100 | $6.20 | $5.90 |
| 3820 | Crushed stone base | TON A A | 102 | $47.25 | $117.22 |
| 3830 | Asphalt seal aggregate | TON A A | 0.09 | $10,500 | $100.33 |
| 3840 | Asphalt seal coat | TON A A | 0.02 | $333.90 | $896.00 |
| 3850 | CL2 asph base 1.00D PG64-22 | TON A A | 59 | $157.50 | $200.00 |
| 3860 | CL2 asph surf 0.38D PG64-22 | TON A A | 40 | $210.00 | $400.00 |
| 3870 | Remove pavement | SQYD A A | 309 | $21.00 | $39.00 |
| 3880 | Granular embankment | CUYD A A | 510 | $63.00 | $100.00 |
| 3890 | Edge key | LF A A | 40 | $51.45 | $300.00 |
| 3900 | Fabric-geotextile class 1 | SQYD A A | 625 | $2.10 | $29.00 |
| 3910 | Mobilization for mill & text | LS A A | 1 | $5,250.00 | $10,000 |
| 3920 | Asphalt pave milling & texturing | TON A A | 10 | $210.00 | $200.00 |
| 3930 | Safeloading | CUYD A A | 5 | $1,680.00 | $2,010.00 |
| 3940 | Temp silt fence | LF A A | 2,700 | $1.71 | $1.73 |
| 3950 | Silt trap type B | EACH A A | 10 | $315.00 | $500.00 |
| 3960 | Silt trap type C | EACH A A | 5 | $315.00 | $250.00 |
| 3970 | Clean silt trap type B | EACH A A | 10 | $1.05 | $500.00 |
| 3980 | Clean silt trap type C | EACH A A | 5 | $1.05 | $250.00 |
| 3990 | Sidewalk-4 in concrete | SQYD A A | 10 | $206.50 | $167.00 |
| 4000 | Remove concrete sidewalk | SQYD A A | 10 | $206.50 | $50.00 |
| 4010 | Temp mulch | SQYD A A | 2,750 | $0.22 | $0.21 |
| 4020 | Temp seeding and protection | SQYD A A | 2,750 | $0.29 | $0.28 |
| 4030 | Seeding and protection | SQYD A A | 6,350 | $0.61 | $0.45 |
| 4040 | Sodding | SQYD A A | 2,158 | $6.25 | $5.95 |
| 4050 | Concrete-class A | CUYD A A | 2.50 | $500.00 | $296.00 |
| 4060 | W encasement steel bored range 4 | LF A A | 180 | $1,600.00 | $1,200.00 |
| 4070 | W encasement steel bored range 5 | LF A A | 320 | $1,750.00 | $2,100.00 |
| 4080 | W encasement steel open cut range 5 | LF A A | 170 | $840.00 | $600.00 |
| 4090 | W fire hydrant assembly | EACH A A | 8 | $12,000 | $15,000 |
| 4100 | W meter 1 inch | EACH A A | 7 | $2,200.00 | $850.00 |
| 4110 | W meter 1-1/2 inch | EACH A A | 2 | $9,500.00 | $2,600.00 |
| 4120 | W meter 2 inch | EACH A A | 1 | $10,000 | $4,950.00 |
| 4130 | W meter 3/4 inch | EACH A A | 9 | $2,000.00 | $800.00 |
| 4140 | W pipe ductile iron 04 inch | LF A A | 160 | $326.00 | $236.00 |
| 4150 | W pipe ductile iron 06 inch | LF A A | 400 | $321.00 | $230.00 |
| 4160 | W pipe ductile iron 08 inch | LF A A | 140 | $321.00 | $260.00 |
| 4170 | W pipe ductile iron 12 inch | LF A A | 3,905 | $318.00 | $280.00 |
| 4180 | W pipe DCTL iron RSTRND joint 08 in | LF A A | 260 | $322.00 | $275.00 |
| 4190 | W pipe DCTL iron RSTRND joint 12 in | LF A A | 1,830 | $330.00 | $300.00 |
| 4200 | W plug existing main | EACH A A | 31 | $5,000.00 | $4,450.00 |
| 4210 | W serv PE/PLST long side 1 in | EACH A A | 1 | $10,000 | $20,550 |
| 4220 | W serv PE/PLST long side 1-1/2 in | EACH A A | 1 | $12,000 | $15,300 |
| 4230 | W serv PE/PLST long side 3/4 in | EACH A A | 6 | $9,000.00 | $16,560 |
| 4240 | W serv PE/PLST short side 1 in | EACH A A | 6 | $2,100.00 | $7,715.00 |
| 4250 | W serv PE/PLST short side 1-1/2 in | EACH A A | 1 | $6,000.00 | $7,890.00 |
| 4260 | W serv PE/PLST short side 2 in | EACH A A | 1 | $7,500.00 | $7,960.00 |
| 4270 | W serv PE/PLST short side 3/4 in | EACH A A | 3 | $2,800.00 | $11,020 |
| 4280 | W service special | EACH A A | 22 | $20,000 | $9,900.00 |
| 4290 | W tie-in 06 inch | EACH A A | 6 | $8,000.00 | $5,960.00 |
| 4300 | W tie-in 08 inch | EACH A A | 5 | $8,500.00 | $4,800.00 |
| 4310 | W tie-in 12 inch | EACH A A | 9 | $9,000.00 | $5,400.00 |
| 4320 | W valve 04 inch | EACH A A | 1 | $2,800.00 | $1,915.00 |
| 4330 | W valve 06 inch | EACH A A | 4 | $3,200.00 | $2,840.00 |
| 4340 | W valve 08 inch | EACH A A | 4 | $4,500.00 | $2,700.00 |
| 4350 | W valve 12 inch | EACH A A | 32 | $8,000.00 | $5,600.00 |
| 4360 | W meter 5/8 inch | EACH A A | 14 | $1,900.00 | $540.00 |
| 4370 | Sawcut pavement | LF A A | 139 | $3.00 | $6.00 |
| 4380 | Asphalt material for tack non-tracking | TON A A | 0.18 | $1.00 | $0.01 |
| 4390 | Mobilization | LS A A | 1 | $6,000,000 | $6,000,000 |
| 4400 | Demobilization | LS A A | 1 | $1,871,886 | $1,850,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.