KYTC contract 25-1017 bid tabulation
ASPHALT PAVEMENT & ROADWAY REHAB KY-1892. Let by Kentucky Transportation Cabinet on July 24, 2025. 2 bids received; low bid $3,597,318 by Riegler Blacktop Inc, -23% against the engineer's estimate of $4,662,034.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 101
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Riegler Blacktop Inc | $3,597,318 | Low | -23% |
| 2 | Eaton Asphalt Paving Co Inc | $4,742,427 | +32% | +2.0% |
Engineer's estimate: $4,662,034.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Riegler Blacktop Inc | 2. Eaton Asphalt Paving Co Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 10,257 | $43.00 | $54.00 |
| 0020 | Geogrid reinforcement for subgrade | SQYD A A | 25,484 | $1.65 | $3.25 |
| 0030 | Leveling & wedging PG64-22 | TON A A | 10 | $200.00 | $755.00 |
| 0040 | CL3 asph base 1.00D PG64-22 | TON A A | 5,692 | $80.00 | $100.00 |
| 0050 | CL3 asph base 1.00D PG76-22 | TON A A | 5,612 | $85.00 | $110.75 |
| 0060 | CL3 asph surf 0.38B PG76-22 | TON A A | 2,127 | $106.00 | $133.00 |
| 0070 | Remove pavement | SQYD A A | 26,843 | $10.50 | $22.75 |
| 0080 | Fabric-geotextile class 1 | SQYD A A | 25,484 | $1.35 | $2.00 |
| 0090 | Joint adhesive | LF A A | 9,476 | $0.55 | $1.25 |
| 0100 | Pave mount infrared temp equipment | SF A A | 651,339 | $0.01 | $0.01 |
| 0110 | Asphalt material for tack non-tracking | TON A A | 17 | $1.00 | $1.00 |
| 0120 | Crushed aggregate size no 2 | TON A A | 1,000 | $50.00 | $50.00 |
| 0130 | Adjust manhole frame to grade | EACH A A | 5 | $500.00 | $525.00 |
| 0140 | Adjust manhole | EACH A A | 1 | $2,800.00 | $1,150.00 |
| 0150 | Standard curb and gutter mod | LF A A | 10,198 | $30.00 | $36.75 |
| 0170 | Barricade-type III | EACH A A | 9 | $250.00 | $175.00 |
| 0180 | Temp ditch | LF A A | 300 | $2.00 | $13.50 |
| 0190 | Clean temp ditch | LF A A | 150 | $1.00 | $7.75 |
| 0200 | Roadway excavation | CUYD A A | 6,315 | $27.00 | $47.50 |
| 0210 | Ditching | LF A A | 272 | $8.00 | $19.50 |
| 0220 | Water | MGAL A A | 139 | $1.00 | $3.25 |
| 0230 | Temporary signs | SQFT A A | 750 | $10.60 | $5.00 |
| 0240 | Edge key | LF A A | 226 | $10.00 | $22.75 |
| 0250 | Fabric-geotextile class 1A | SQYD A A | 1,449 | $2.00 | $3.00 |
| 0260 | Maintain & control traffic | LS A A | 1 | $60,000 | $116,765 |
| 0270 | Portable changeable message sign | EACH A A | 3 | $3,000.00 | $8,615.00 |
| 0280 | Temp silt fence | LF A A | 300 | $4.25 | $3.75 |
| 0290 | Silt trap type B | EACH A A | 1 | $200.00 | $625.00 |
| 0300 | Silt trap type C | EACH A A | 17 | $250.00 | $350.00 |
| 0310 | Clean silt trap type B | EACH A A | 1 | $35.00 | $250.00 |
| 0320 | Clean silt trap type C | EACH A A | 17 | $30.00 | $150.00 |
| 0330 | Sidewalk-4 in concrete | SQYD A A | 512 | $73.00 | $116.50 |
| 0340 | Remove concrete sidewalk | SQYD A A | 235 | $18.00 | $20.75 |
| 0350 | Staking | LS A A | 1 | $25,000 | $24,185 |
| 0360 | Tubular markers | EACH A A | 99 | $85.00 | $59.00 |
| 0370 | Erosion control blanket | SQYD A A | 242 | $5.60 | $25.00 |
| 0380 | Temp mulch | SQYD A A | 1,557 | $1.15 | $1.00 |
| 0390 | Temp seeding and protection | SQYD A A | 1,162 | $1.90 | $1.00 |
| 0400 | Initial fertilizer | TON A A | 0.10 | $955.00 | $1,600.00 |
| 0410 | Maintenance fertilizer | TON A A | 1.40 | $955.00 | $1,800.00 |
| 0420 | Seeding and protection | SQYD A A | 2,323 | $2.24 | $3.75 |
| 0430 | Agricultural limestone | TON A A | 1.40 | $98.00 | $110.00 |
| 0440 | Topsoil furnished and placed | CUYD A A | 378 | $150.00 | $75.00 |
| 0450 | Pave striping-temp paint-4 in | LF A A | 16,106 | $0.18 | $0.18 |
| 0460 | Pave striping-temp paint-6 in | LF A A | 224 | $3.00 | $3.00 |
| 0470 | Pave striping-thermo-6 in W | LF A A | 9,061 | $1.30 | $1.30 |
| 0480 | Pave striping-thermo-6 in Y | LF A A | 7,045 | $1.30 | $1.30 |
| 0490 | Pave striping-thermo-12 in W | LF A A | 224 | $2.60 | $2.60 |
| 0500 | Pave striping-temp rem tape-W | LF A A | 6,753 | $3.00 | $3.00 |
| 0510 | Pave striping-temp rem tape-Y | LF A A | 11,471 | $3.00 | $3.00 |
| 0520 | Pave marking-thermo stop bar-24IN | LF A A | 242 | $12.00 | $12.00 |
| 0530 | Pave marking-thermo curv arrow | EACH A A | 9 | $125.00 | $125.00 |
| 0540 | Inlaid pavement marker-B W/R | EACH A A | 92 | $35.00 | $35.00 |
| 0550 | Inlaid pavement marker-B Y/R | EACH A A | 85 | $35.00 | $35.00 |
| 0560 | Fuel adjustment | DOLL A A | 24,956 | $1.00 | $1.00 |
| 0570 | Asphalt adjustment | DOLL A A | 52,510 | $1.00 | $1.00 |
| 0580 | Pave mark temp paint stop bar | LF A A | 242 | $12.00 | $12.00 |
| 0590 | Pave mark temp paint line arrow | EACH A A | 9 | $65.00 | $65.00 |
| 0600 | Red maple | EACH A A | 3 | $1,259.50 | $1,000.00 |
| 0610 | Sawcut pavement | LF A A | 180 | $3.00 | $2.25 |
| 0620 | Longitudinal edge key | LF A A | 1,554 | $5.00 | $4.85 |
| 0630 | Relocate signal head | EACH A A | 20 | $300.00 | $250.00 |
| 0640 | Detectable warnings | SQFT A A | 90 | $21.00 | $47.25 |
| 0650 | Hardwood mulch | SQYD A A | 720 | $17.50 | $5.00 |
| 0660 | Standard barrier median TY 5-mod | SQYD A A | 402 | $140.00 | $136.50 |
| 0670 | Remove concrete median | SQYD A A | 423 | $18.00 | $29.50 |
| 0680 | Barcode sign inventory | EACH A A | 1 | $500.00 | $50.00 |
| 0700 | Connected arrow panel | MONT A A | 3 | $3,100.00 | $1,250.00 |
| 0710 | Electronic delivery MGMT system - agg | LS A A | 1 | $1.00 | $0.01 |
| 0720 | Perforated pipe-4 in | LF A A | 5,550 | $15.00 | $15.00 |
| 0730 | Perforated pipe-6 in | LF A A | 2,159 | $17.00 | $16.25 |
| 0740 | Non-perforated pipe-4 in | LF A A | 160 | $15.00 | $19.90 |
| 0750 | Non-perforated pipe-6 in | LF A A | 30 | $17.00 | $25.75 |
| 0760 | Curb box inlet type A | EACH A A | 4 | $7,500.00 | $8,000.00 |
| 0770 | Cored hole drainage box con-4 in | EACH A A | 16 | $150.00 | $311.64 |
| 0780 | Cored hole drainage box con-6 in | EACH A A | 3 | $150.00 | $311.65 |
| 0790 | Concrete-class A | CUYD A A | 179.40 | $1,152.00 | $1,250.00 |
| 0800 | Steel reinforcement | LB A A | 7,896 | $2.49 | $6.50 |
| 0810 | Concrete sealing | SQFT A A | 3,088 | $4.25 | $2.00 |
| 0820 | SBM alum sheet signs .125 in | SQFT A A | 20 | $100.00 | $250.00 |
| 0830 | Steel post type 1 | LF A A | 17 | $125.00 | $100.00 |
| 0840 | Conduit-1 1/4 in | LF A A | 40 | $10.00 | $7.05 |
| 0850 | Trenching and backfilling | LF A A | 32 | $8.00 | $16.10 |
| 0860 | Loop wire | LF A A | 1,490 | $2.00 | $0.30 |
| 0870 | Loop saw slot and fill | LF A A | 320 | $15.00 | $29.38 |
| 0880 | Wood post | EACH A A | 2 | $250.00 | $500.00 |
| 0890 | Electrical junction box-10 X 8 X 4 | EACH A A | 2 | $750.00 | $1,000.00 |
| 0891 | Pole 30 FT MTG HT | EACH A A | 2 | $4,250.00 | $2,700.00 |
| 0892 | Pole base | EACH A A | 2 | $2,000.00 | $2,000.00 |
| 0893 | Transformer base | EACH A A | 2 | $1,500.00 | $500.00 |
| 0894 | Fused connector kit | EACH A A | 6 | $150.00 | $200.00 |
| 0895 | Electrical junction box type B | EACH A A | 4 | $2,000.00 | $2,000.00 |
| 0896 | Trenching and backfilling | LF A A | 100 | $8.00 | $16.10 |
| 0897 | Open cut roadway | LF A A | 100 | $85.00 | $114.00 |
| 0898 | Cable-no. 14/7C | LF A A | 700 | $5.00 | $1.34 |
| 0899 | Install LED signal-3 section | EACH A A | 2 | $850.00 | $500.00 |
| 0900 | Mobilization | LS A A | 1 | $45,000 | $36,815 |
| 0901 | Bore and jack conduit | LF A A | 100 | $60.00 | $64.37 |
| 0902 | PVC conduit-2 in-schedule 80 | LF A A | 175 | $6.00 | $1.59 |
| 0903 | Install radar presence detector type A | EACH A A | 11 | $2,200.00 | $1,500.00 |
| 0910 | Demobilization | LS A A | 1 | $55,000 | $71,140 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.