KYTC contract 25-1105 bid tabulation
GRADE & DRAIN RECONSTRUCT INTERSECTION (KY 139 & KY124). Let by Kentucky Transportation Cabinet on March 20, 2025, Trigg, District 1. 1 bid received; low bid $872,205 by Jim Smith Contracting Company LLC, -10% against the engineer's estimate of $973,791.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 MAR 2025
- Pay items
- 60
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $872,205 | Low | -10% |
Engineer's estimate: $973,791.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Dga base | TON A | 1,853 | $44.80 |
| 0020 | Geogrid reinforcement for subgrade | SQYD A | 2,380 | $5.28 |
| 0030 | Leveling & wedging PG64-22 | TON A | 20 | $189.38 |
| 0040 | CL2 asph base 1.00D PG64-22 | TON A | 747 | $99.60 |
| 0050 | CL2 asph surf 0.38D PG64-22 | TON A | 313 | $133.03 |
| 0060 | JPC pavement-8 in | SQYD A | 248 | $180.00 |
| 0070 | Fabric-geotextile class 1 | SQYD A | 2,380 | $2.69 |
| 0080 | Asphalt pave milling & texturing | TON A | 119 | $52.47 |
| 0090 | Asphalt material for tack non-tracking | TON A | 1 | $1,400.68 |
| 0100 | Barricade-type III | EACH A | 4 | $741.16 |
| 0110 | Remove pavement | SQYD A | 300 | $24.30 |
| 0120 | Cem conc ent pavement-8 in | SQYD A | 248 | $180.00 |
| 0130 | Temp ditch | LF A | 707 | $0.61 |
| 0140 | Clean temp ditch | LF A | 354 | $0.30 |
| 0150 | Roadway excavation | CUYD A | 5,500 | $27.56 |
| 0160 | Water | MGAL A | 5 | $672.99 |
| 0170 | Right-of-way monument type 1 | EACH A | 13 | $423.66 |
| 0180 | Witness post | EACH A | 3 | $195.87 |
| 0190 | Channel lining class II | TON A | 20 | $45.11 |
| 0200 | Clearing and grubbing | LS A | 1 | $36,402 |
| 0210 | Temporary signs | SQFT A | 577 | $15.77 |
| 0220 | Edge key | LF A | 66 | $81.68 |
| 0230 | Maintain & control traffic | LS A | 1 | $4,855.96 |
| 0240 | Portable changeable message sign | EACH A | 4 | $3,769.64 |
| 0250 | Mobilization for mill & text | LS A | 1 | $2,612.17 |
| 0260 | Edgeline rumble strips | LF A | 2,255 | $2.65 |
| 0270 | Temp silt fence | LF A | 707 | $2.12 |
| 0280 | Silt trap type B | EACH A | 3 | $191.34 |
| 0290 | Clean silt trap type B | EACH A | 3 | $80.38 |
| 0300 | Sidewalk-4 in concrete | SQYD A | 410 | $97.50 |
| 0310 | Staking | LS A | 1 | $20,000 |
| 0320 | Remove structure | LS A | 1 | $70,132 |
| 0330 | Erosion control blanket | SQYD A | 807 | $8.30 |
| 0340 | Temp mulch | SQYD A | 6,649 | $0.98 |
| 0350 | Temp seeding and protection | SQYD A | 4,962 | $1.27 |
| 0360 | Initial fertilizer | TON A | 0.30 | $2,344.00 |
| 0370 | Maintenance fertilizer | TON A | 1 | $2,343.99 |
| 0380 | Seeding and protection | SQYD A | 5,961 | $1.27 |
| 0390 | Agricultural limestone | TON A | 3.70 | $1,757.99 |
| 0400 | Pave striping-temp paint-4 in | LF A | 3,750 | $0.10 |
| 0410 | Pave striping-perm paint-4 in | LF A | 3,750 | $0.12 |
| 0420 | Pave marking-thermo X-walk-12 in | LF A | 24 | $5.00 |
| 0430 | Pave marking-thermo stop bar-24IN | LF A | 32 | $10.00 |
| 0440 | Pave marking-thermo cross-hatch | SQFT A | 1,070 | $5.00 |
| 0450 | Pave marking-thermo curv arrow | EACH A | 4 | $75.00 |
| 0460 | Longitudinal edge key | LF A | 205 | $23.92 |
| 0470 | Detectable warnings | SQFT A | 80 | $48.00 |
| 0480 | Entrance pipe-15 in | LF A | 225 | $55.48 |
| 0490 | Storm sewer pipe-15 in | LF A | 135 | $74.00 |
| 0500 | Storm sewer pipe-18 in | LF A | 246 | $115.63 |
| 0510 | Pipe culvert headwall-18 in | EACH A | 1 | $3,288.66 |
| 0520 | S & F box inlet-outlet-18 in | EACH A | 1 | $4,212.76 |
| 0530 | Drop box inlet type 6F | EACH A | 1 | $9,621.81 |
| 0540 | Drop box inlet type 14 | EACH A | 1 | $4,356.19 |
| 0550 | Fabric-geotextile class 2 for pipe | SQYD A | 1,077 | $2.00 |
| 0560 | Safeloading | CUYD A | 7 | $361.74 |
| 0570 | Drop box inlet TY 6E | EACH A | 2 | $9,727.93 |
| 0580 | Turf reinforcement mat 1 | SQYD A | 149 | $29.30 |
| 0590 | Pipeline inspection | LF A | 259 | $9.65 |
| 0600 | Demobilization | LS A | 1 | $13,200 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.