KYTC contract 25-1115 bid tabulation
ASPHALT REHAB WITH GRADE & DRAIN I-24. Let by Kentucky Transportation Cabinet on August 21, 2025. 1 bid received; low bid $10,142,639 by Jim Smith Contracting Company LLC, +4.6% against the engineer's estimate of $9,693,068.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 AUG 2025
- Pay items
- 100
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $10,142,639 | Low | +5.0% |
Engineer's estimate: $9,693,068.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 8,041 | $40.00 |
| 0020 | Asphalt seal aggregate | TON A A | 813 | $87.47 |
| 0030 | Asphalt seal coat | TON A A | 98 | $1,099.60 |
| 0040 | Leveling & wedging PG76-22 | TON A A | 500 | $130.00 |
| 0050 | CL4 asph base 1.00D PG76-22 | TON A A | 4,987 | $130.00 |
| 0060 | CL4 asph surf 0.50A PG76-22 | TON A A | 8,723 | $145.00 |
| 0070 | Mobilization for mill & text | LS A A | 1 | $3,000.00 |
| 0080 | Asphalt pave milling & texturing | TON A A | 12,771 | $17.50 |
| 0090 | Joint adhesive | LF A A | 89,455 | $0.46 |
| 0100 | Longitudinal edge key | LF A A | 1,195 | $11.05 |
| 0110 | Asphalt material for tack non-tracking | TON A A | 47 | $850.00 |
| 0120 | Delineator for guardrail mono directional white | EACH A A | 20 | $15.37 |
| 0130 | Delineator for guardrail mono directional yello | EACH A A | 106 | $15.37 |
| 0140 | Delineator for barrier - white | EACH A A | 198 | $20.36 |
| 0150 | Delineator for barrier - yellow | EACH A A | 272 | $22.24 |
| 0160 | Relocate temp conc barrier | LF A A | 5,640 | $8.08 |
| 0170 | Barricade-type III | EACH A A | 10 | $400.00 |
| 0180 | Roadway excavation | CUYD A A | 6,175 | $42.98 |
| 0190 | Remove guardrail | LF A A | 3,912.50 | $3.87 |
| 0200 | Clearing and grubbing | LS A A | 1 | $25,458 |
| 0210 | Temporary signs | SQFT A A | 1,000 | $17.46 |
| 0220 | Maintain & control traffic | LS A A | 1 | $590,000 |
| 0230 | Portable changeable message sign | EACH A A | 4 | $2,900.00 |
| 0240 | Edgeline rumble strips | LF A A | 60,282 | $0.25 |
| 0250 | Silt trap type A | EACH A A | 8 | $150.00 |
| 0260 | Silt trap type B | EACH A A | 8 | $150.00 |
| 0270 | Silt trap type C | EACH A A | 8 | $160.00 |
| 0280 | Clean silt trap type A | EACH A A | 8 | $20.00 |
| 0290 | Clean silt trap type B | EACH A A | 8 | $20.00 |
| 0300 | Clean silt trap type C | EACH A A | 8 | $20.00 |
| 0310 | Staking | LS A A | 1 | $50,000 |
| 0320 | Relocate crash cushion | EACH A A | 4 | $3,616.72 |
| 0330 | Conc barrier wall type 9T | LF A A | 15,120 | $65.00 |
| 0340 | Erosion control blanket | SQYD A A | 7,061 | $4.00 |
| 0350 | Temp mulch | SQYD A A | 4,707 | $0.50 |
| 0360 | Initial fertilizer | TON A A | 0.40 | $1,200.00 |
| 0370 | Maintenance fertilizer | TON A A | 0.30 | $1,200.00 |
| 0380 | Agricultural limestone | TON A A | 4.40 | $900.00 |
| 0390 | Flexible delineator post-M/W | EACH A A | 334 | $71.49 |
| 0400 | Flexible delineator post-M/Y | EACH A A | 48 | $71.49 |
| 0410 | Pave striping-temp paint-6 in | LF A A | 169,966 | $0.09 |
| 0420 | Pave striping-thermo-6 in W | LF A A | 37,180 | $0.90 |
| 0430 | Pave striping-thermo-6 in Y | LF A A | 30,141 | $0.90 |
| 0440 | Pave striping-thermo-12 in W | LF A A | 1,300 | $2.00 |
| 0450 | Pave striping-temp rem tape-B | LF A A | 4,613 | $2.50 |
| 0460 | Pave striping-temp rem tape-W | LF A A | 2,563 | $2.50 |
| 0470 | Pave striping-temp rem tape-Y | LF A A | 2,050 | $2.50 |
| 0480 | Pave striping-dur TY 1-6 in W | LF A A | 7,045 | $8.00 |
| 0490 | Pave striping-dur TY 1-6 in Y | LF A A | 5,636 | $8.00 |
| 0500 | Pave marking-thermo stop bar-24IN | LF A A | 30 | $6.00 |
| 0510 | Pavement marker TY iva-MW temp | EACH A A | 2,071 | $4.00 |
| 0520 | Pavement marker TY iva-MY temp | EACH A A | 100 | $4.00 |
| 0530 | Inlaid pavement marker-B W/R | EACH A A | 376 | $18.50 |
| 0540 | Inlaid pavement marker-B Y/R | EACH A A | 29 | $18.50 |
| 0550 | Crash cushion TY 6 class T TL3 | EACH A A | 9 | $5,520.64 |
| 0560 | Fuel adjustment | DOLL A A | 25,012 | $1.00 |
| 0570 | Asphalt adjustment | DOLL A A | 55,555 | $1.00 |
| 0580 | Pave mark-paint arrows | EACH A A | 3 | $25.00 |
| 0590 | Law enforcement officer | HOUR A A | 600 | $95.00 |
| 0600 | Guardrail thrie beam | LF A A | 3,786 | $69.15 |
| 0610 | G/R steel W beam-S face (7 FT post) | LF A A | 600 | $36.62 |
| 0620 | Pave mark thermo chevron | SQFT A A | 433 | $5.00 |
| 0630 | Pave mount infrared temp equipment | SF A A | 711,693 | $0.03 |
| 0640 | Queue protection vehicle | HOUR A A | 600 | $92.16 |
| 0650 | Thrie beam guardrail transition TL-3 | EACH A A | 40 | $5,319.08 |
| 0660 | Furnish queue protection vehicles | MONT A A | 8 | $9,434.00 |
| 0670 | Portable queue warning alert system | MONT A A | 8 | $1,563.50 |
| 0680 | Queue warning PCMS | MONT A A | 32 | $530.00 |
| 0690 | Queue warning portable radar sensors | MONT A A | 32 | $106.00 |
| 0700 | Mobilization for concrete surf treatment | LS A A | 1 | $1,727.94 |
| 0710 | Thrie beam bullnose terminal | EACH A A | 8 | $26,222 |
| 0720 | Connected arrow panel | MONT A A | 16 | $689.43 |
| 0730 | Electronic delivery MGMT system - agg | LS A A | 1 | $6,419.99 |
| 0740 | Temporary silt fence | LF A A | 2,000 | $2.56 |
| 0750 | Culvert pipe-15 in | LF A A | 8 | $362.44 |
| 0760 | Storm sewer pipe-15 in | LF A A | 75 | $106.00 |
| 0770 | Pipe culvert headwall-15 in | EACH A A | 1 | $3,316.36 |
| 0780 | Remove pipe | LF A A | 4 | $133.27 |
| 0790 | Drop box inlet type 5D | EACH A A | 1 | $14,510 |
| 0800 | Fill and cap inlet | EACH A A | 1 | $2,680.87 |
| 0810 | Adjust inlet | EACH A A | 2 | $1,854.86 |
| 0820 | Channel lining class II | TON A A | 10 | $182.02 |
| 0830 | Fabric-geotextile class 2 for pipe | SQYD A A | 108 | $2.00 |
| 0840 | Remove headwall | EACH A A | 1 | $934.73 |
| 0850 | Concrete-class A | CUYD A A | 0.86 | $1,820.73 |
| 0860 | Bridge barrier retrofit | LF A A | 1,012 | $309.19 |
| 0870 | Concrete sealing | SQFT A A | 9,007 | $3.00 |
| 0880 | Bridge barrier retrofit | LF A A | 8,648 | $305.33 |
| 0890 | Concrete sealing | SQFT A A | 76,967 | $3.00 |
| 0900 | Conduit-1 1/4 in | LF A A | 80 | $8.25 |
| 0910 | Conduit-2 in | LF A A | 20 | $9.15 |
| 0920 | Trenching and backfilling | LF A A | 90 | $18.00 |
| 0930 | Piezoelectric sensor | EACH A A | 4 | $3,700.00 |
| 0940 | Loop wire | LF A A | 1,600 | $0.75 |
| 0950 | Loop saw slot and fill | LF A A | 360 | $29.25 |
| 0960 | Galvanized steel cabinet | EACH A A | 2 | $975.00 |
| 0970 | Wood post | EACH A A | 4 | $575.00 |
| 0980 | Electrical junction box type A | EACH A A | 2 | $2,100.00 |
| 0990 | Mobilization | LS A A | 1 | $472,000 |
| 1000 | Demobilization | LS A A | 1 | $142,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of August 21, 2025. Compiled by Mirage Metrics.