KYTC contract 25-1315 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE CHENOWETH LANE (KY 1932). Let by Kentucky Transportation Cabinet on July 24, 2025. 4 bids received; low bid $5,680,176 by Louisville Paving Company Inc, +6.5% against the engineer's estimate of $5,331,279.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 129
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Louisville Paving Company Inc | $5,680,176 | Low | +7.0% |
| 2 | Cleary Construction Inc | $6,780,000 | +19% | +27% |
| 3 | Mac Construction & Excavating Inc | $7,692,152 | +35% | +44% |
| 4 | E & B Paving LLC | $9,378,232 | +65% | +76% |
Engineer's estimate: $5,331,279.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louisville Paving Company Inc | 2. Cleary Construction Inc | 3. Mac Construction & Excavating Inc | 4. E & B Paving LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 1,288 | $130.00 | $75.00 | $130.00 | $389.00 |
| 0020 | Leveling & wedging PG64-22 | TON A A | 1,619 | $98.00 | $96.25 | $105.00 | $119.00 |
| 0030 | CL2 asph base 1.00D PG64-22 | TON A A | 38 | $315.00 | $246.75 | $550.00 | $675.00 |
| 0040 | CL3 asph base 1.00D PG64-22 | TON A A | 418 | $116.00 | $111.95 | $250.00 | $357.00 |
| 0050 | Asphalt prime coat | TON A A | 0.38 | $2,000.00 | $2,500.00 | $0.01 | $1.00 |
| 0060 | CL2 asph surf 0.38D PG64-22 | TON A A | 19 | $550.00 | $367.60 | $1,065.00 | $1,400.00 |
| 0070 | CL3 asph surf 0.38B PG64-22 | TON A A | 1,360 | $104.00 | $91.20 | $117.00 | $177.00 |
| 0080 | JPC pavement-8 in | SQYD A A | 34 | $120.46 | $89.95 | $89.95 | $89.95 |
| 0090 | Cem conc ent pavement-8 in | SQYD A A | 1,946 | $127.86 | $95.75 | $95.75 | $96.95 |
| 0100 | Asphalt pave milling & texturing | TON A A | 1,302 | $15.00 | $22.35 | $42.00 | $40.62 |
| 0110 | Exposed aggregate conc pavement-8 in | SQYD A A | 87 | $139.52 | $114.75 | $114.75 | $200.00 |
| 0120 | Asphalt material for tack non-tracking | TON A A | 6.15 | $800.00 | $650.00 | $0.01 | $1.00 |
| 0130 | Plug pipe | EACH A A | 3 | $939.01 | $1,500.00 | $760.00 | $5,500.00 |
| 0140 | Standard curb and gutter mod | LF A A | 1,681 | $54.88 | $43.00 | $43.00 | $80.00 |
| 0150 | Standard header curb | LF A A | 255 | $60.76 | $30.25 | $30.25 | $79.00 |
| 0160 | Temp ditch | LF A A | 2,647 | $5.66 | $1.00 | $1.50 | $14.00 |
| 0170 | Clean temp ditch | LF A A | 1,323 | $5.66 | $0.01 | $0.50 | $10.00 |
| 0180 | Roadway excavation | CUYD A A | 1,680 | $170.00 | $325.00 | $225.00 | $485.00 |
| 0190 | Water | MGAL A A | 50 | $0.01 | $0.01 | $4.58 | $20.00 |
| 0200 | Right-of-way monument type 1 | EACH A A | 17 | $219.80 | $219.80 | $219.80 | $219.80 |
| 0210 | Right-of-way monument type 1A | EACH A A | 4 | $219.80 | $219.80 | $219.80 | $219.80 |
| 0220 | Witness post | EACH A A | 3 | $199.94 | $199.94 | $199.94 | $199.94 |
| 0230 | Clearing and grubbing | LS A A | 1 | $441,611 | $109,000 | $350,000 | $365,000 |
| 0240 | Fabric-geotextile class 2 for pipe | SQYD A A | 13,297 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0250 | Maintain & control traffic | LS A A | 1 | $650,000 | $695,000 | $1,194,637 | $738,798 |
| 0260 | Portable changeable message sign | EACH A A | 2 | $7,632.00 | $6,360.00 | $6,550.00 | $8,500.00 |
| 0270 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $1.00 | $2,500.00 | $10,500 |
| 0280 | Safeloading | CUYD A A | 2 | $760.34 | $1,000.00 | $1,400.00 | $5,000.00 |
| 0290 | Temp silt fence | LF A A | 2,647 | $1.66 | $3.00 | $1.66 | $1.66 |
| 0300 | Silt trap type A | EACH A A | 9 | $125.00 | $400.00 | $169.93 | $1,000.00 |
| 0310 | Silt trap type B | EACH A A | 9 | $125.00 | $200.00 | $152.44 | $1,100.00 |
| 0320 | Silt trap type C | EACH A A | 9 | $250.00 | $350.00 | $168.99 | $350.00 |
| 0330 | Clean silt trap type A | EACH A A | 9 | $125.00 | $1.00 | $31.10 | $1,000.00 |
| 0340 | Clean silt trap type B | EACH A A | 9 | $125.00 | $1.00 | $35.84 | $1,100.00 |
| 0350 | Clean silt trap type C | EACH A A | 9 | $250.00 | $1.00 | $30.46 | $1,075.00 |
| 0360 | Sidewalk-4 in concrete | SQYD A A | 4,771 | $79.54 | $58.05 | $58.05 | $58.50 |
| 0370 | Staking | LS A A | 1 | $60,000 | $335,000 | $125,000 | $300,000 |
| 0380 | Clean pipe structure | EACH A A | 36 | $900.00 | $900.00 | $900.00 | $2,700.00 |
| 0390 | Temp mulch | SQYD A A | 28,976 | $0.28 | $0.42 | $0.28 | $0.28 |
| 0400 | Temp seeding and protection | SQYD A A | 21,732 | $0.30 | $0.43 | $0.30 | $0.30 |
| 0410 | Initial fertilizer | TON A A | 0.05 | $1,032.00 | $1,300.00 | $1,032.00 | $1,032.00 |
| 0420 | Maintenance fertilizer | TON A A | 0.03 | $1,032.00 | $1,300.00 | $1,032.00 | $1,032.00 |
| 0430 | Seeding and protection | SQYD A A | 913 | $3.53 | $0.80 | $3.53 | $3.53 |
| 0440 | Sodding | SQYD A A | 7,961 | $5.80 | $13.39 | $5.80 | $5.80 |
| 0450 | Agricultural limestone | TON A A | 0.57 | $96.00 | $75.00 | $96.00 | $96.00 |
| 0460 | Pave striping-temp paint-4 in | LF A A | 4,672 | $0.25 | $0.25 | $0.25 | $0.25 |
| 0470 | Pave striping-temp paint-12 in | LF A A | 42 | $0.52 | $0.52 | $0.52 | $0.52 |
| 0480 | Pave striping-thermo-6 in W | LF A A | 9,587 | $1.35 | $1.35 | $1.35 | $1.35 |
| 0490 | Pave striping-thermo-6 in Y | LF A A | 9,546 | $1.35 | $1.35 | $1.35 | $1.35 |
| 0500 | Pave marking-thermo R 6 FT | EACH A A | 2 | $150.00 | $150.00 | $150.00 | $150.00 |
| 0510 | Pave marking-R/R xbucks 16 in | LF A A | 42 | $12.00 | $12.00 | $12.00 | $12.00 |
| 0520 | Pave marking-thermo X-walk-6 in | LF A A | 151 | $4.05 | $4.05 | $4.05 | $4.05 |
| 0530 | Pave marking-thermo stop bar-24IN | LF A A | 362 | $13.05 | $13.05 | $13.05 | $13.05 |
| 0540 | Pave marking-thermo cross-hatch | SQFT A A | 128 | $4.95 | $4.95 | $4.95 | $4.95 |
| 0550 | Pave marking-thermo STR arrow | EACH A A | 5 | $145.00 | $145.00 | $145.00 | $145.00 |
| 0560 | Pave marking-thermo curv arrow | EACH A A | 15 | $155.00 | $155.00 | $155.00 | $155.00 |
| 0570 | Pave marking-thermo comb arrow | EACH A A | 4 | $185.00 | $185.00 | $185.00 | $185.00 |
| 0580 | Inlaid pavement marker-MW | EACH A A | 4 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0590 | Inlaid pavement marker-by | EACH A A | 48 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0600 | Fuel adjustment | DOLL A A | 5,378 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0610 | Asphalt adjustment | DOLL A A | 13,508 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0620 | S manhole adjust to grade | EACH A A | 17 | $238.50 | $2,500.00 | $1,800.00 | $5,000.00 |
| 0630 | Joint adhesive | LF A A | 8,777 | $1.00 | $1.00 | $0.60 | $1.95 |
| 0640 | Pave mark-paint arrows | EACH A A | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0650 | Sawcut pavement | LF A A | 2,553 | $1.00 | $2.00 | $2.00 | $8.83 |
| 0660 | Pave mark thermo cone cap-solid yellow | SQFT A A | 44 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0670 | Pave marking-thermo yield bar-36 in | LF A A | 22 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0680 | Trench drain | LF A A | 69 | $188.40 | $1,250.00 | $435.00 | $1,050.00 |
| 0690 | Pave mark temp paint stop bar-24 in | LF A A | 23 | $9.00 | $9.00 | $9.00 | $9.00 |
| 0700 | Detectable warnings | SQFT A A | 476 | $22.00 | $22.00 | $22.00 | $22.00 |
| 0710 | Pave mark-thermo-X-walk-24 in | LF A A | 50 | $13.05 | $13.05 | $13.05 | $13.05 |
| 0720 | Concrete trench | LF A A | 2,026 | $17.00 | $17.00 | $17.00 | $17.00 |
| 0730 | Railroad coordination | LS A A | 1 | $15,500 | $30,000 | $40,000 | $39,000 |
| 0740 | Pave marking-thermo dotted lane exten | LF A A | 69 | $3.95 | $3.95 | $3.95 | $3.95 |
| 0750 | Remove & reset light pole | EACH A A | 13 | $12,804 | $13,478 | $13,478 | $12,804 |
| 0760 | Lane separator curb | LF A A | 35 | $155.00 | $155.00 | $155.00 | $155.00 |
| 0770 | Pipeline inspection | LF A A | 3,182 | $2.35 | $2.35 | $2.35 | $2.35 |
| 0780 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.47 | $1.00 | $1.00 |
| 0790 | Storm sewer pipe-8 in | LF A A | 16 | $197.41 | $180.00 | $205.00 | $500.00 |
| 0800 | Storm sewer pipe-12 in | LF A A | 1,016 | $100.77 | $135.00 | $160.00 | $400.00 |
| 0810 | Storm sewer pipe-15 in | LF A A | 2,546 | $92.67 | $140.00 | $170.00 | $350.00 |
| 0820 | Storm sewer pipe-18 in | LF A A | 695 | $105.79 | $160.00 | $400.00 | $385.00 |
| 0830 | Storm sewer pipe-24 in | LF A A | 573 | $121.82 | $165.00 | $410.00 | $400.00 |
| 0840 | Storm sewer pipe-15 in equiv | LF A A | 58 | $220.56 | $230.00 | $420.00 | $560.00 |
| 0850 | Pipe culvert headwall-12 in | EACH A A | 1 | $1,609.21 | $3,500.00 | $3,400.00 | $5,400.00 |
| 0860 | Curb box inlet type B | EACH A A | 1 | $6,772.96 | $13,000 | $8,400.00 | $13,000 |
| 0870 | Curb box inlet type F | EACH A A | 1 | $2,559.42 | $10,000 | $5,300.00 | $8,500.00 |
| 0880 | Drop box inlet type 3 | EACH A A | 4 | $2,834.09 | $13,500 | $6,200.00 | $8,515.00 |
| 0890 | Drop box inlet type 13G | EACH A A | 18 | $3,326.78 | $4,500.00 | $6,150.00 | $8,700.00 |
| 0900 | Drop box inlet type 14 | EACH A A | 15 | $2,850.58 | $5,250.00 | $5,400.00 | $8,500.00 |
| 0910 | Drop box inlet type 15 mod | EACH A A | 2 | $3,302.05 | $5,200.00 | $5,900.00 | $8,700.00 |
| 0920 | Drop box inlet type 16G | EACH A A | 1 | $3,239.90 | $5,000.00 | $6,000.00 | $8,400.00 |
| 0930 | Adjust inlet | EACH A A | 9 | $1,857.39 | $2,500.00 | $1,700.00 | $4,900.00 |
| 0940 | Reconstruct inlet | EACH A A | 3 | $4,263.66 | $10,000 | $3,200.00 | $11,000 |
| 0950 | Cored hole drainage box con-12 in | EACH A A | 3 | $771.26 | $2,500.00 | $3,400.00 | $175.00 |
| 0960 | Manhole type A | EACH A A | 20 | $3,325.89 | $5,000.00 | $5,300.00 | $12,000 |
| 0970 | Cap inlet | SQYD A A | 1 | $3,328.30 | $3,000.00 | $3,200.00 | $2,500.00 |
| 0980 | Cored hole drainage box con- 18 in | EACH A A | 1 | $771.26 | $2,500.00 | $4,000.00 | $225.00 |
| 0990 | Cored hole drainage box con-15 in | EACH A A | 2 | $771.26 | $2,500.00 | $3,700.00 | $200.00 |
| 1000 | Drainage junction box TY B | EACH A A | 3 | $2,904.09 | $5,000.00 | $4,500.00 | $8,800.00 |
| 1010 | MSD 18 in X 18 in yard drain | EACH A A | 24 | $1,941.32 | $4,500.00 | $4,400.00 | $6,100.00 |
| 1020 | MSD catch basin type 1 | EACH A A | 8 | $2,804.49 | $4,800.00 | $5,900.00 | $8,800.00 |
| 1030 | Sidewalk underdrain | EACH A A | 1 | $2,133.72 | $1,900.00 | $4,300.00 | $9,850.00 |
| 1040 | SBM alum sheet signs .080 in | SQFT A A | 89 | $55.52 | $55.52 | $55.52 | $55.52 |
| 1050 | Steel post type 1 | LF A A | 118 | $39.07 | $39.07 | $39.07 | $39.07 |
| 1060 | Barcode sign inventory | EACH A A | 13 | $53.42 | $53.42 | $53.42 | $53.42 |
| 1070 | W fire hydrant assembly | EACH A A | 6 | $10,099 | $3,850.00 | $18,500 | $12,500 |
| 1080 | W fire hydrant remove | EACH A A | 6 | $812.55 | $2,430.00 | $2,300.00 | $3,500.00 |
| 1090 | W meter 1 inch | EACH A A | 9 | $820.76 | $2,500.00 | $750.00 | $500.00 |
| 1100 | W meter 3/4 inch | EACH A A | 41 | $740.95 | $1,600.00 | $740.00 | $500.00 |
| 1110 | W meter adjust | EACH A A | 12 | $489.29 | $1,820.00 | $940.00 | $850.00 |
| 1120 | W meter relocate | EACH A A | 34 | $749.37 | $1,005.00 | $550.00 | $1,000.00 |
| 1130 | W pipe ductile iron 06 inch | LF A A | 180 | $348.91 | $585.00 | $520.00 | $150.00 |
| 1140 | W pipe ductile iron 08 inch | LF A A | 60 | $582.37 | $750.00 | $885.00 | $225.00 |
| 1150 | W pipe ductile iron 16 inch | LF A A | 940 | $499.93 | $620.00 | $650.00 | $257.00 |
| 1160 | W tie-in 06 inch | EACH A A | 5 | $2,847.46 | $6,250.00 | $6,500.00 | $4,500.00 |
| 1170 | W tie-in 08 inch | EACH A A | 5 | $2,839.32 | $4,725.00 | $6,550.00 | $5,500.00 |
| 1180 | W tie-in 16 inch | EACH A A | 19 | $7,448.61 | $11,450 | $10,350 | $6,000.00 |
| 1190 | W valve 06 inch | EACH A A | 12 | $2,389.57 | $3,977.00 | $2,590.00 | $6,500.00 |
| 1200 | W valve 08 inch | EACH A A | 3 | $3,095.65 | $4,791.00 | $3,825.00 | $7,250.00 |
| 1210 | W valve 16 inch | EACH A A | 9 | $13,951 | $17,198 | $18,820 | $15,000 |
| 1220 | W valve box adjust | EACH A A | 40 | $397.32 | $839.00 | $450.00 | $500.00 |
| 1230 | W serv copper long side 1 in | EACH A A | 4 | $4,834.54 | $5,008.00 | $4,880.00 | $4,750.00 |
| 1240 | W serv copper long side 3/4 in | EACH A A | 19 | $3,860.13 | $4,706.00 | $4,420.00 | $4,500.00 |
| 1250 | W serv copper short side 1 in | EACH A A | 5 | $4,096.05 | $2,698.00 | $2,950.00 | $4,000.00 |
| 1260 | W serv copper short side 3/4 in | EACH A A | 22 | $3,331.20 | $2,851.00 | $2,770.00 | $3,500.00 |
| 1270 | W valve box remove | EACH A A | 11 | $230.66 | $1,140.00 | $250.00 | $500.00 |
| 1280 | Mobilization | LS A A | 1 | $263,000 | $316,000 | $355,000 | $430,000 |
| 1290 | Demobilization | LS A A | 1 | $80,000 | $99,088 | $120,000 | $160,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.