KYTC contract 25-2049 bid tabulation
PAVEMENT (WITH ALTERNATES) AA HIGHWAY (KY 9). Let by Kentucky Transportation Cabinet on January 23, 2025, Lewis, District 9. 3 bids received; low bid $523,241 by H G Mays Corporation, -21% against the engineer's estimate of $664,329.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 JAN 2025
- Pay items
- 20
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | H G Mays Corporation | $523,241 | Low | -21% |
| 2 | Strawser Construction Inc | $626,130 | +20% | -6.0% |
| 3 | Eaton Asphalt Paving Co Inc | $653,306 | +25% | -2.0% |
Engineer's estimate: $664,329.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H G Mays Corporation | 2. Strawser Construction Inc | 3. Eaton Asphalt Paving Co Inc |
|---|---|---|---|---|---|---|
| 0010 | Pave striping-temp paint-4 in | LF A | 76,800 | $0.24 | ||
| 0020 | Microsurfacing-leveling course | SQYD A | 87,618 | $2.25 | ||
| 0030 | Microsurfacing-surface course - type B | SQYD A | 87,618 | $2.18 | ||
| 0040 | Mobilization for mill & text | LS A | 1 | $1,500.00 | $3,175.00 | |
| 0050 | Asphalt pave milling & texturing | TON A | 30 | $30.00 | $170.00 | |
| 0060 | Pave striping-temp paint-4 in | LF A | 4,000 | $0.20 | $0.20 | |
| 0070 | CL3 asph surf no.4B PG64-22 | TON A | 3,615 | $99.75 | $132.50 | |
| 0080 | Asphalt material for tack non-tracking | TON A | 32 | $1.00 | $1.00 | |
| 0090 | Temporary signs | SQFT A | 140 | $1.00 | $21.00 | $5.00 |
| 0100 | Maintain & control traffic | LS A | 1 | $8,598.58 | $24,650 | $10,220 |
| 0105 | Trenching and backfilling | LF A | 10 | $25.00 | $27.00 | $25.00 |
| 0110 | Portable changeable message sign | EACH A | 2 | $750.00 | $835.00 | $2,550.00 |
| 0115 | Piezoelectric sensor | EACH A | 4 | $3,000.00 | $3,375.00 | $3,000.00 |
| 0120 | Pave striping-thermo-6 in W | LF A | 55,200 | $1.10 | $1.25 | $1.10 |
| 0125 | Loop saw slot and fill | LF A | 80 | $14.00 | $15.00 | $14.00 |
| 0130 | Pave striping-thermo-6 in Y | LF A | 21,600 | $1.10 | $1.25 | $1.10 |
| 0140 | Centerline rumble strips | LF A | 27,600 | $0.14 | $0.20 | $0.19 |
| 0150 | Overband crack sealing | LB A | 19,500 | $1.74 | $1.90 | $1.74 |
| 0160 | Remove pavement marker | EACH A | 350 | $16.00 | $25.00 | $6.75 |
| 0170 | Demobilization | LS A | 1 | $7,930.17 | $28,000 | $9,805.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.