KYTC contract 25-2198 bid tabulation
ASPHALT RESURFACING VARIOUS ROUTES IN KENTON AND BOONE COUNTY. Let by Kentucky Transportation Cabinet on May 22, 2025. 2 bids received; low bid $1,396,569 by Riegler Blacktop Inc, -8.2% against the engineer's estimate of $1,522,047.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 MAY 2025
- Pay items
- 96
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Riegler Blacktop Inc | $1,396,569 | Low | -8.0% |
| 2 | Eaton Asphalt Paving Co Inc | $1,457,142 | +4.0% | -4.0% |
Engineer's estimate: $1,522,047.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Riegler Blacktop Inc | 2. Eaton Asphalt Paving Co Inc |
|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 141 | $100.00 | $107.00 |
| 0020 | CL2 asph surf 0.38B PG64-22 | TON A A | 1,980 | $97.50 | $105.50 |
| 0030 | Asphalt material for tack | TON A A | 43 | $1.00 | $1.00 |
| 0040 | CL3 asph surf 0.38B PG64-22 | TON A A | 1,090 | $98.50 | $105.50 |
| 0050 | Temporary signs | SQFT A A | 1,420 | $11.00 | $5.00 |
| 0060 | Maintain & control traffic | LS A A | 1 | $11,200 | $10,515 |
| 0070 | Maintain & control traffic | LS A A | 1 | $11,200 | $6,475.00 |
| 0080 | Maintain & control traffic | LS A A | 1 | $11,200 | $5,340.00 |
| 0090 | Maintain & control traffic | LS A A | 1 | $11,200 | $12,185 |
| 0100 | Portable changeable message sign | EACH A A | 10 | $750.00 | $1,350.00 |
| 0110 | Mobilization for mill & text | LS A A | 1 | $2,500.00 | $3,075.00 |
| 0120 | Mobilization for mill & text | LS A A | 1 | $2,500.00 | $3,075.00 |
| 0130 | Mobilization for mill & text | LS A A | 1 | $2,500.00 | $3,075.00 |
| 0140 | Mobilization for mill & text | LS A A | 1 | $2,500.00 | $3,075.00 |
| 0150 | Asphalt pave milling & texturing | TON A A | 6,610 | $19.00 | $18.00 |
| 0160 | Sidewalk-4 in concrete | SQYD A A | 96 | $150.00 | $176.00 |
| 0170 | Arrow panel | EACH A A | 8 | $500.00 | $200.00 |
| 0180 | Base failure repair | SQYD A A | 828 | $77.00 | $127.60 |
| 0190 | Conduit-1 1/4 in | LF A A | 60 | $6.44 | $6.44 |
| 0200 | Conduit-1 1/4 in | LF A A | 40 | $6.44 | $6.44 |
| 0210 | Conduit-1 1/4 in | LF A A | 60 | $6.44 | $6.44 |
| 0220 | Conduit-1 1/4 in | LF A A | 15 | $6.44 | $6.44 |
| 0230 | Conduit-2 in | LF A A | 10 | $8.93 | $8.93 |
| 0240 | Conduit-2 in | LF A A | 10 | $8.93 | $8.93 |
| 0250 | Trenching and backfilling | LF A A | 55 | $10.00 | $10.00 |
| 0260 | Trenching and backfilling | LF A A | 25 | $10.00 | $10.00 |
| 0270 | Trenching and backfilling | LF A A | 65 | $10.00 | $10.00 |
| 0280 | Trenching and backfilling | LF A A | 10 | $10.00 | $10.00 |
| 0290 | Piezoelectric sensor | EACH A A | 2 | $3,000.00 | $3,000.00 |
| 0300 | Piezoelectric sensor | EACH A A | 2 | $3,000.00 | $3,000.00 |
| 0310 | Loop wire | LF A A | 900 | $0.25 | $0.25 |
| 0320 | Loop wire | LF A A | 1,800 | $0.25 | $0.25 |
| 0330 | Loop wire | LF A A | 900 | $0.25 | $0.25 |
| 0340 | Loop wire | LF A A | 800 | $0.25 | $0.25 |
| 0350 | Loop saw slot and fill | LF A A | 220 | $10.00 | $10.00 |
| 0360 | Loop saw slot and fill | LF A A | 335 | $10.00 | $10.00 |
| 0370 | Loop saw slot and fill | LF A A | 220 | $10.00 | $10.00 |
| 0380 | Loop saw slot and fill | LF A A | 160 | $10.00 | $10.00 |
| 0390 | Remove and replace sidewalk | SQYD A A | 3 | $250.00 | $360.00 |
| 0400 | Remove and replace sidewalk | SQYD A A | 3 | $250.00 | $360.00 |
| 0410 | Remove and replace sidewalk | SQYD A A | 3 | $250.00 | $360.00 |
| 0420 | Remove and replace sidewalk | SQYD A A | 2 | $250.00 | $430.00 |
| 0430 | Pave striping-temp paint-4 in | LF A A | 83,648 | $0.18 | $0.18 |
| 0440 | Pave striping-thermo-6 in W | LF A A | 39,552 | $1.05 | $1.05 |
| 0450 | Pave striping-thermo-6 in Y | LF A A | 41,334 | $1.05 | $1.05 |
| 0460 | Pave marking-thermo X-walk-6 in | LF A A | 6,692 | $3.50 | $3.50 |
| 0470 | Pave marking-thermo stop bar-24IN | LF A A | 1,458 | $10.00 | $10.00 |
| 0480 | Pave marking-thermo cross-hatch | SQFT A A | 838 | $6.00 | $6.00 |
| 0490 | Pave marking-thermo STR arrow | EACH A A | 9 | $115.00 | $115.00 |
| 0500 | Pave marking-thermo curv arrow | EACH A A | 114 | $120.00 | $120.00 |
| 0510 | Pave marking-thermo comb arrow | EACH A A | 36 | $150.00 | $150.00 |
| 0520 | Pave marking-thermo only | EACH A A | 5 | $300.00 | $300.00 |
| 0530 | Pavement marking removal | SQFT A A | 223 | $5.00 | $5.00 |
| 0540 | Remove pavement marker type V | EACH A A | 432 | $5.00 | $6.00 |
| 0550 | Fuel adjustment | DOLL A A | 10,525 | $1.00 | $1.00 |
| 0560 | Asphalt adjustment | DOLL A A | 26,438 | $1.00 | $1.00 |
| 0570 | Pave mark temp paint stop bar | LF A A | 990 | $7.00 | $7.00 |
| 0580 | Pave mark temp paint line arrow | EACH A A | 157 | $60.00 | $60.00 |
| 0590 | Galvanized steel cabinet | EACH A A | 1 | $1,054.70 | $1,054.70 |
| 0600 | Galvanized steel cabinet | EACH A A | 1 | $1,054.70 | $1,054.70 |
| 0610 | Wood post | EACH A A | 2 | $500.00 | $500.00 |
| 0620 | Wood post | EACH A A | 3 | $500.00 | $500.00 |
| 0630 | Wood post | EACH A A | 2 | $500.00 | $500.00 |
| 0640 | Wood post | EACH A A | 1 | $500.00 | $500.00 |
| 0650 | Electrical junction box type A | EACH A A | 1 | $3,000.00 | $3,000.00 |
| 0660 | Electrical junction box type A | EACH A A | 1 | $3,000.00 | $3,000.00 |
| 0670 | Electrical junction box-10 X 8 X 4 | EACH A A | 3 | $750.00 | $750.00 |
| 0680 | Electrical junction box-10 X 8 X 4 | EACH A A | 1 | $750.00 | $750.00 |
| 0690 | Pave marking thermo-bike | EACH A A | 48 | $250.00 | $250.00 |
| 0700 | CL3 asph surf 0.38A PG64-22 | TON A A | 2,340 | $103.50 | $105.50 |
| 0710 | Pave mark temp paint stop bar-24 in | LF A A | 468 | $7.00 | $7.00 |
| 0720 | Detectable warnings | SQFT A A | 181 | $50.00 | $47.00 |
| 0730 | Pave marking thermo-bike lane arrow | EACH A A | 48 | $120.00 | $120.00 |
| 0740 | Pave marking-thermo dotted lane exten | LF A A | 120 | $5.00 | $5.00 |
| 0750 | Pave marking-thermo dotted lane exten | LF A A | 465 | $8.00 | $8.00 |
| 0760 | Pave marking-thermo dotted lane exten | LF A A | 555 | $5.00 | $5.00 |
| 0770 | CL2 asph surf 0.38A PG64-22 | TON A A | 1,200 | $101.50 | $105.50 |
| 0780 | Install radar presence detector type A | EACH A A | 46 | $1,020.00 | $1,020.00 |
| 0790 | Electronic delivery MGMT system | LS A A | 1 | $1.00 | $0.01 |
| 0800 | Electronic delivery MGMT system | LS A A | 1 | $1.00 | $0.01 |
| 0810 | Electronic delivery MGMT system | LS A A | 1 | $1.00 | $0.01 |
| 0820 | Electronic delivery MGMT system | LS A A | 1 | $1.00 | $0.01 |
| 0830 | Temporary signs | SQFT A A | 120 | $11.00 | $5.00 |
| 0840 | Maintain & control traffic | LS A A | 1 | $3,400.00 | $4,250.00 |
| 0850 | Maintain & control traffic | LS A A | 1 | $3,400.00 | $1,850.00 |
| 0860 | Portable changeable message sign | EACH A A | 6 | $750.00 | $1,350.00 |
| 0870 | Sidewalk-4 in concrete | SQYD A A | 74 | $150.00 | $183.00 |
| 0880 | Repair concrete curb | LF A A | 26 | $100.00 | $100.00 |
| 0890 | Reconstruct curb box inlet | EACH A A | 5 | $4,500.00 | $3,635.00 |
| 0900 | Detectable warnings | SQFT A A | 28 | $50.00 | $47.00 |
| 0910 | SBM alum sheet signs .080 in | SQFT A A | 46.50 | $30.00 | $30.00 |
| 0920 | Install span mounted sign | EACH A A | 6 | $250.00 | $250.00 |
| 0930 | Remove sign | EACH A A | 4 | $250.00 | $250.00 |
| 0940 | Install LED signal-3 section | EACH A A | 10 | $800.00 | $800.00 |
| 0950 | Remove signal equipment | EACH A A | 3 | $250.00 | $250.00 |
| 0960 | Demobilization | LS A A | 1 | $21,000 | $21,310 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.