KYTC contract 26-1106 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE US 31W BYPASS. Let by Kentucky Transportation Cabinet on January 29, 2026. 2 bids received; low bid $7,433,731 by Scotty'S Contracting & Stone LLC, +6.6% against the engineer's estimate of $6,973,596.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 29 JAN 2026
- Pay items
- 161
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $7,433,731 | Low | +7.0% |
| 2 | Cleary Construction Inc | $7,920,000 | +7.0% | +14% |
Engineer's estimate: $6,973,596.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 2,904 | $44.73 | $45.00 |
| 0020 | Crushed aggregate size no 2 | TON A A | 5,279 | $40.47 | $42.00 |
| 0030 | CL3 asph base 1.00D PG64-22 | TON A A | 4,352 | $99.22 | $125.00 |
| 0040 | JPC pavement-12 in | SQYD A A | 29 | $352.38 | $352.38 |
| 0050 | Cem conc ent pavement-8 in | SQYD A A | 995 | $124.06 | $124.06 |
| 0060 | Fabric-geotextile class 1 | SQYD A A | 7,650 | $4.41 | $3.00 |
| 0070 | Fabric-geotextile class 4A | SQYD A A | 7,400 | $4.62 | $4.50 |
| 0080 | CL3 asph surf 0.38A PG64-22 | TON A A | 1,634 | $143.51 | $145.00 |
| 0090 | Asphalt material for tack non-tracking | TON A A | 18 | $538.42 | $950.00 |
| 0100 | Reconstruct manhole | EACH A A | 1 | $2,500.00 | $5,000.00 |
| 0110 | Adjust manhole | EACH A A | 2 | $1,500.00 | $1,200.00 |
| 0120 | Standard curb and gutter | LF A A | 4,350 | $28.12 | $28.12 |
| 0130 | Standard curb and gutter mod | LF A A | 531 | $55.09 | $55.88 |
| 0140 | Lip curb and gutter mod | LF A A | 54 | $48.59 | $48.59 |
| 0150 | Standard header curb | LF A A | 958 | $44.43 | $44.43 |
| 0160 | Standard header curb mod | LF A A | 84 | $67.53 | $67.53 |
| 0170 | Standard barrier median type 2 | SQYD A A | 264 | $145.02 | $145.02 |
| 0180 | Standard barrier median type 4 | SQYD A A | 16 | $219.49 | $219.49 |
| 0190 | Barricade-type III | EACH A A | 5 | $295.63 | $87.00 |
| 0200 | Remove concrete island | SQYD A A | 147 | $57.93 | $32.00 |
| 0210 | Roadway excavation | CUYD A A | 4,759 | $61.54 | $75.00 |
| 0220 | Structure excav-unclassified | CUYD A A | 51 | $1,128.96 | $185.00 |
| 0230 | Water | MGAL A A | 221 | $0.01 | $0.01 |
| 0240 | Right-of-way monument type 1 | EACH A A | 39 | $216.62 | $186.29 |
| 0250 | Right-of-way monument type 1A | EACH A A | 5 | $216.62 | $186.29 |
| 0260 | Clearing and grubbing | LS A A | 1 | $50,702 | $95,000 |
| 0270 | Concrete-class B | CUYD A A | 68 | $858.95 | $858.95 |
| 0280 | Temporary signs | SQFT A A | 288 | $8.08 | $9.00 |
| 0290 | Edge key | LF A A | 378 | $52.23 | $42.00 |
| 0300 | Fabric-geotextile class 2 for pipe | SQYD A A | 16,070 | $2.00 | $2.00 |
| 0310 | Maintain & control traffic | LS A A | 1 | $397,591 | $195,000 |
| 0320 | Lane closure | EACH A A | 2 | $1,632.09 | $6,500.00 |
| 0330 | Portable changeable message sign | EACH A A | 2 | $9,486.34 | $5,555.00 |
| 0340 | Mobilization for mill & text | LS A A | 1 | $5,981.12 | $3,400.00 |
| 0350 | Asphalt pave milling & texturing | TON A A | 86 | $52.48 | $33.04 |
| 0360 | Safeloading | CUYD A A | 110 | $500.00 | $365.27 |
| 0370 | Temp silt fence | LF A A | 2,300 | $4.54 | $2.50 |
| 0380 | Silt trap type C | EACH A A | 62 | $232.91 | $375.00 |
| 0390 | Clean silt trap type C | EACH A A | 31 | $0.01 | $1.00 |
| 0400 | Sidewalk-4 in concrete | SQYD A A | 2,430 | $68.78 | $59.44 |
| 0410 | Staking | LS A A | 1 | $78,637 | $153,000 |
| 0420 | Arrow panel | EACH A A | 2 | $3,170.66 | $1,855.00 |
| 0430 | Temporary signal modification | EACH A A | 2 | $30,000 | $30,000 |
| 0440 | Temp mulch | SQYD A A | 1,863 | $0.50 | $0.42 |
| 0450 | Temp seeding and protection | SQYD A A | 1,863 | $0.75 | $0.44 |
| 0460 | Initial fertilizer | TON A A | 0.10 | $2,500.00 | $1,684.60 |
| 0470 | Maintenance fertilizer | TON A A | 0.10 | $2,500.00 | $1,684.60 |
| 0480 | Sodding | SQYD A A | 3,446 | $8.50 | $13.58 |
| 0490 | Agricultural limestone | TON A A | 0.10 | $600.00 | $89.00 |
| 0500 | Pave striping-temp paint-6 in | LF A A | 18,880 | $0.33 | $0.33 |
| 0510 | Pave striping-thermo-6 in W | LF A A | 7,828 | $1.35 | $1.35 |
| 0520 | Pave striping-thermo-6 in Y | LF A A | 7,974 | $1.35 | $1.35 |
| 0530 | Pave marking-thermo X-walk-6 in | LF A A | 1,286 | $1.35 | $1.35 |
| 0540 | Pave marking-thermo stop bar-24IN | LF A A | 476 | $15.00 | $15.00 |
| 0550 | Pave marking-thermo STR arrow | EACH A A | 1 | $150.00 | $150.00 |
| 0560 | Pave marking-thermo curv arrow | EACH A A | 36 | $150.00 | $150.00 |
| 0570 | Pave marking-thermo comb arrow | EACH A A | 7 | $300.00 | $300.00 |
| 0580 | Remove pavement marker type V | EACH A A | 245 | $8.97 | $5.00 |
| 0590 | Inlaid pavement marker-MW | EACH A A | 144 | $24.00 | $24.00 |
| 0600 | Inlaid pavement marker-MY | EACH A A | 102 | $24.00 | $24.00 |
| 0610 | Fuel adjustment | DOLL A A | 12,776 | $1.00 | $1.00 |
| 0620 | Asphalt adjustment | DOLL A A | 22,513 | $1.00 | $1.00 |
| 0630 | Pave mark temp paint line arrow | EACH A A | 30 | $50.00 | $50.00 |
| 0640 | Remove & reset traffic sign | EACH A A | 21 | $884.36 | $884.36 |
| 0650 | Sawcut pavement | LF A A | 133 | $4.59 | $11.25 |
| 0660 | Longitudinal edge key | LF A A | 4,883 | $4.62 | $2.97 |
| 0670 | Pave marking-thermo yield bar-36 in | LF A A | 11 | $45.00 | $45.00 |
| 0680 | Water blasting existing stripe | LF A A | 7,393 | $0.85 | $0.85 |
| 0690 | Pave marking-thermo stop | EACH A A | 1 | $500.00 | $500.00 |
| 0700 | Detectable warnings | SQFT A A | 389 | $45.83 | $45.83 |
| 0710 | Pave mark-thermo-X-walk-24 in | LF A A | 2,128 | $15.00 | $15.00 |
| 0720 | Pipeline inspection | LF A A | 3,760 | $2.35 | $2.35 |
| 0730 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $0.01 |
| 0740 | Storm sewer pipe-15 in | LF A A | 2,829 | $107.97 | $125.00 |
| 0750 | Storm sewer pipe-18 in | LF A A | 662 | $129.04 | $130.00 |
| 0760 | Storm sewer pipe-24 in | LF A A | 263 | $510.76 | $190.00 |
| 0770 | Storm sewer pipe-48 in | LF A A | 6 | $634.77 | $720.00 |
| 0780 | Curb box inlet type B | EACH A A | 15 | $6,500.00 | $10,000 |
| 0790 | Curb box inlet type F | EACH A A | 1 | $4,800.00 | $8,500.00 |
| 0800 | Drop box inlet type 11 | EACH A A | 4 | $4,600.00 | $11,000 |
| 0810 | Manhole type A | EACH A A | 2 | $4,500.00 | $5,500.00 |
| 0820 | Drop box inlet TY 13S(mod) | EACH A A | 1 | $10,500 | $12,000 |
| 0830 | Curb box inlet type B modified | EACH A A | 8 | $7,500.00 | $11,000 |
| 0840 | Curb box inlet TY F-mod | EACH A A | 1 | $4,800.00 | $8,500.00 |
| 0850 | Drainage junction box TY B | EACH A A | 1 | $4,000.00 | $5,500.00 |
| 0860 | CL3 asph base 1.00D PG64-22 | TON A A | 101 | $398.20 | $250.00 |
| 0870 | Sidewalk-4 in concrete | SQYD A A | 1,034 | $90.09 | $78.24 |
| 0880 | Surf restoration | SQYD A A | 936 | $35.09 | $21.00 |
| 0890 | W cap existing main | EACH A A | 13 | $2,650.00 | $4,000.00 |
| 0900 | W encasement steel open cut range 6 | LF A A | 192 | $870.00 | $855.00 |
| 0910 | W fire hydrant assembly | EACH A A | 3 | $11,250 | $12,000 |
| 0920 | W fire hydrant remove | EACH A A | 5 | $1,600.00 | $1,150.00 |
| 0930 | W meter 3/4 inch | EACH A A | 22 | $2,175.00 | $2,650.00 |
| 0940 | W meter relocate | EACH A A | 22 | $650.00 | $1,250.00 |
| 0950 | W pipe ductile iron 04 inch | LF A A | 30 | $140.00 | $250.00 |
| 0960 | W pipe ductile iron 06 inch | LF A A | 418 | $207.00 | $195.00 |
| 0970 | W pipe ductile iron 08 inch | LF A A | 45 | $233.00 | $275.00 |
| 0980 | W pipe ductile iron 16 inch | LF A A | 2,764 | $306.00 | $339.00 |
| 0990 | W service relocate | EACH A A | 29 | $775.00 | $1,500.00 |
| 1000 | W tie-in 04 inch | EACH A A | 1 | $3,250.00 | $4,250.00 |
| 1010 | W tie-in 06 inch | EACH A A | 1 | $6,400.00 | $8,000.00 |
| 1020 | W tie-in 08 inch | EACH A A | 2 | $8,050.00 | $10,000 |
| 1030 | W tapping sleeve and valve size 1 | EACH A A | 2 | $7,100.00 | $40,000 |
| 1035 | W tapping sleeve and valve size 2 | EACH A A | 2 | $37,500 | $40,000 |
| 1040 | W valve 04 inch | EACH A A | 1 | $1,850.00 | $2,250.00 |
| 1050 | W valve 06 inch | EACH A A | 1 | $2,250.00 | $2,750.00 |
| 1060 | W valve 08 inch | EACH A A | 1 | $3,050.00 | $4,000.00 |
| 1070 | W valve 16 inch | EACH A A | 7 | $8,800.00 | $13,500 |
| 1080 | W valve box remove | EACH A A | 3 | $1,600.00 | $325.00 |
| 1090 | S encasement steel bored range 4 | LF A A | 146 | $828.00 | $865.00 |
| 1100 | S encasement steel bored range 6 | LF A A | 110 | $1,270.00 | $1,360.00 |
| 1110 | S force main PVC 10 inch | LF A A | 132 | $178.00 | $230.00 |
| 1120 | S force main tie-in 10 inch | EACH A A | 1 | $8,600.00 | $8,500.00 |
| 1130 | S manhole | EACH A A | 11 | $8,000.00 | $10,500 |
| 1140 | S manhole abandon/remove | EACH A A | 10 | $1,700.00 | $3,000.00 |
| 1150 | S manhole adjust to grade | EACH A A | 1 | $700.00 | $3,000.00 |
| 1160 | S pipe PVC 08 inch | LF A A | 18 | $85.00 | $600.00 |
| 1170 | S pipe PVC 10 inch | LF A A | 90 | $164.00 | $175.00 |
| 1180 | S pipe PVC 21 inch | LF A A | 692 | $274.00 | $345.00 |
| 1190 | Plug pipe | EACH A A | 1 | $2,800.00 | $5,500.00 |
| 1195 | Plug pipe | EACH A A | 2 | $1,600.00 | $3,500.00 |
| 1200 | Plug pipe | EACH A A | 1 | $4,358.00 | $4,500.00 |
| 1210 | Fused connector kit | EACH A A | 26 | $250.00 | $250.00 |
| 1220 | Conduit-3 in | LF A A | 1,144 | $21.16 | $21.16 |
| 1230 | Trenching and backfilling | LF A A | 472 | $16.20 | $16.20 |
| 1240 | Open cut roadway | LF A A | 572 | $86.01 | $86.01 |
| 1250 | Cable-no. 14/5C | LF A A | 2,359 | $3.07 | $3.07 |
| 1260 | Cable-no. 14/7C | LF A A | 4,141 | $3.46 | $3.46 |
| 1270 | Mast arm pole | EACH A A | 8 | $65,239 | $65,239 |
| 1280 | Install pedestrian head-LED | EACH A A | 16 | $700.00 | $700.00 |
| 1290 | Install LED signal-3 section | EACH A A | 17 | $500.00 | $500.00 |
| 1300 | Install LED signal- 4 section | EACH A A | 6 | $600.00 | $600.00 |
| 1310 | Electrical junction box type A | EACH A A | 17 | $3,000.00 | $3,000.00 |
| 1320 | Install ped detector-audible | EACH A A | 16 | $500.00 | $500.00 |
| 1330 | Bore and jack conduit | LF A A | 1,144 | $39.44 | $39.44 |
| 1340 | Remove & reinstall coordinating unit | EACH A A | 2 | $2,500.00 | $2,500.00 |
| 1350 | Traffic signal pole base | CUYD A A | 26 | $300.00 | $300.00 |
| 1360 | Install signal pedestal | EACH A A | 8 | $5,000.00 | $5,000.00 |
| 1370 | PVC conduit-2 in-schedule 80 | LF A A | 364 | $1.64 | $1.64 |
| 1380 | PVC conduit-3 in-schedule 80 | LF A A | 172 | $2.94 | $2.94 |
| 1390 | Install signal controller-TY atc | EACH A A | 2 | $9,000.00 | $9,000.00 |
| 1400 | Remove signal equipment | EACH A A | 2 | $15,000 | $15,000 |
| 1410 | Install radar presence detector type A | EACH A A | 8 | $1,500.00 | $1,500.00 |
| 1420 | Install mast arm dampener | EACH A A | 8 | $300.00 | $300.00 |
| 1430 | Pole 40 FT MTG HT | EACH A A | 4 | $6,000.00 | $6,000.00 |
| 1440 | Pole base | EACH A A | 4 | $2,000.00 | $2,000.00 |
| 1450 | Trenching and backfilling | LF A A | 765 | $16.10 | $16.10 |
| 1460 | LED luminaire | EACH A A | 4 | $2,500.00 | $2,500.00 |
| 1470 | PVC conduit-2 in-schedule 80 | LF A A | 850 | $1.66 | $1.66 |
| 1480 | Conduit-1 1/4 in | LF A A | 40 | $7.18 | $7.18 |
| 1490 | Conduit-2 in | LF A A | 15 | $9.91 | $9.91 |
| 1500 | Trenching and backfilling | LF A A | 50 | $16.20 | $16.20 |
| 1510 | Piezoelectric sensor | EACH A A | 4 | $3,500.00 | $3,500.00 |
| 1520 | Loop wire | LF A A | 2,100 | $0.30 | $0.30 |
| 1530 | Loop saw slot and fill | LF A A | 400 | $15.00 | $15.00 |
| 1540 | Remove and replace sidewalk | SQYD A A | 3 | $250.00 | $250.00 |
| 1550 | Galvanized steel cabinet | EACH A A | 1 | $1,006.50 | $1,006.50 |
| 1560 | Wood post | EACH A A | 2 | $500.00 | $500.00 |
| 1570 | Electrical junction box type A | EACH A A | 1 | $3,000.00 | $3,000.00 |
| 1580 | Mobilization | LS A A | 1 | $333,680 | $365,000 |
| 1590 | Demobilization | LS A A | 1 | $104,490 | $112,748 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 29, 2026. Compiled by Mirage Metrics.