MoDOT contract 250516-F12 bid tabulation
JSL0202-VARIOUS ROUTES-VARIOUS COUNTIES. Let by Missouri DOT on May 16, 2025, St Louis, St. Louis. 4 bids received; low bid $929,121 by Gerstner Electric, Inc..
- Owner
- Missouri DOT
- Letting
- 16 MAY 2025
- Pay items
- 30
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerstner Electric, Inc. | $929,121 | Low |
| 2 | Meyer Electric Company, Inc. | $1,037,521 | +12% |
| 3 | Reinhold Electric, Inc. | $1,055,187 | +14% |
| 4 | CSD Environmental Services, Inc. | $1,617,520 | +74% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerstner Electric, Inc. | 2. Meyer Electric Company, Inc. | 3. Reinhold Electric, Inc. | 4. CSD Environmental Services, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $3,500.00 | $3,000.00 | $1,000.00 | $25,000 |
| 0020 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 2 | $1,750.00 | $5,700.00 | $1,500.00 | $3,120.00 |
| 0030 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $20,400 | $38,000 | $30,000 | $25,200 |
| 0040 | Mobilization (6181000) | LS | 1 | $28,521 | $27,000 | $40,000 | $95,409 |
| 0050 | Conduit, 3 in., rigid, in trench (9105201) | LF | 409 | $17.25 | $25.00 | $20.00 | $39.60 |
| 0060 | Cable, 2 AWG, 1 conductor, power (9108202) | LF | 1,840 | $4.00 | $4.25 | $3.50 | $6.00 |
| 0070 | Wire, 2 AWG, bare neutral (9108402) | LF | 620 | $3.75 | $4.25 | $3.50 | $6.00 |
| 0080 | Base, concrete (9109100) | CY | 9 | $3,900.00 | $1,600.00 | $2,800.00 | $5,400.00 |
| 0090 | Misc.DMS training (9109901) | LS | 1 | $4,000.00 | $4,600.00 | $5,000.00 | $4,200.00 |
| 0100 | Misc.ITS asset management tool (9109901) | LS | 1 | $4,275.00 | $11,676 | $1,200.00 | $13,200 |
| 0110 | Misc.ethernet switch replacement (9109902) | EACH | 110 | $375.00 | $590.00 | $400.00 | $1,140.00 |
| 0120 | Misc.expansion module replacement (9109902) | EACH | 108 | $60.00 | $260.00 | $160.00 | $276.00 |
| 0130 | Misc.fiber optic fusion splice (9109902) | EACH | 132 | $85.00 | $68.00 | $70.00 | $88.80 |
| 0140 | Misc.fiber optic jumper, SM (9109902) | EACH | 680 | $14.75 | $65.00 | $40.00 | $28.80 |
| 0150 | Misc.fiber optic pigtail, SM (9109902) | EACH | 24 | $20.00 | $73.00 | $40.00 | $28.80 |
| 0160 | Misc.install communications equipment (9109902) | EACH | 6 | $425.00 | $1,600.00 | $800.00 | $420.00 |
| 0170 | Misc.install conduit into existing pull box (9109902) | EACH | 9 | $150.00 | $500.00 | $600.00 | $1,080.00 |
| 0180 | Misc.install modot furnished IP-addressable power strip (9109902) | EACH | 55 | $150.00 | $483.00 | $250.00 | $420.00 |
| 0190 | Misc.intercept conduit with pull box (9109902) | EACH | 1 | $150.00 | $800.00 | $3,000.00 | $4,800.00 |
| 0200 | Misc.ITS pull box, preformed class 5 (9109902) | EACH | 1 | $3,925.00 | $3,950.00 | $3,500.00 | $4,800.00 |
| 0210 | Misc.modified type 7 cabinet (9109902) | EACH | 6 | $5,125.00 | $6,441.00 | $8,000.00 | $10,250 |
| 0220 | Misc.modot buried cable drivable delineator post (9109902) | EACH | 1 | $125.00 | $300.00 | $500.00 | $300.00 |
| 0230 | Misc.rack-mounted interconnect center (9109902) | EACH | 6 | $575.00 | $1,500.00 | $1,200.00 | $2,160.00 |
| 0240 | Misc.roadside dynamic message sign replacement (9109902) | EACH | 6 | $114,000 | $107,194 | $121,800 | $173,520 |
| 0250 | Misc.salvage existing sign components (9109902) | EACH | 6 | $125.00 | $1,450.00 | $1,580.00 | $1,500.00 |
| 0260 | Misc.sign structure base mesh (9109902) | EACH | 6 | $125.00 | $450.00 | $250.00 | $205.12 |
| 0270 | Misc.splice conduit (9109902) | EACH | 2 | $300.00 | $560.00 | $600.00 | $1,080.00 |
| 0280 | Misc.DMS control cable (9109903) | LF | 924 | $4.50 | $6.00 | $3.00 | $4.80 |
| 0290 | Misc.remove and reinstall FO cable (9109903) | LF | 401 | $3.50 | $4.80 | $3.00 | $4.80 |
| 0300 | Misc.remove and reinstall power cable (9109903) | LF | 404 | $3.50 | $5.80 | $3.00 | $4.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way