Meyer Electric Company, Inc.: MoDOT bid record
Meyer Electric Company, Inc. submitted 33 bids on Missouri DOT contracts in the data, from 21 FEB 2020 to 16 OCT 2026, and was the low bidder on 5 of them (15%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $3,637,302
- Latest bid
- 16 OCT 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 7 | 1 | 14% |
| 2021 | 4 | 0 | 0% |
| 2022 | 3 | 1 | 33% |
| 2023 | 7 | 1 | 14% |
| 2024 | 6 | 1 | 17% |
| 2025 | 3 | 1 | 33% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| St. Louis | 22 | 0 | 0% |
| Central | 3 | 2 | 67% |
| Kansas City | 3 | 1 | 33% |
| Southeast | 3 | 1 | 33% |
| Southwest | 1 | 0 | 0% |
| Northeast | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Cable, 16 AWG 7 conductor | 9028311 | LF | 11 | 11 (100%) | $1.45 | $2.50 |
| Base, concrete | 9109100 | CY | 9 | 9 (100%) | $1,600.00 | $2,800.00 |
| Conduit, 3 in., trench with tracer wire | 9025300 | LF | 9 | 6 (67%) | $12.00 | $25.00 |
| Conduit, 3 in., pushed with tracer wire | 9027300 | LF | 8 | 6 (75%) | $23.00 | $37.50 |
| Cable, 16 AWG 5 conductor | 9028310 | LF | 7 | 6 (86%) | $1.25 | $2.15 |
| Base, concrete | 9029100 | CY | 11 | 5 (45%) | $1,450.00 | $2,100.00 |
| Signal head, type 3S | 9020213 | EACH | 9 | 5 (56%) | $977.00 | $1,074.00 |
| Conduit, 2 in., trench with tracer wire | 9025200 | LF | 11 | 4 (36%) | $10.50 | $18.00 |
| Cable, 2 AWG, 1 conductor, power | 9108202 | LF | 9 | 4 (44%) | $4.00 | $4.00 |
| Pull box, preformed class 3 | 9028812 | EACH | 7 | 4 (57%) | $2,300.00 | $3,336.14 |
| Lighting pole, 45 FT. or 13.5 M, type at design 2 | 9011062 | EACH | 5 | 4 (80%) | $3,413.00 | $3,961.50 |
| SH-flat sheet - signal sign | 9020833 | SF | 9 | 3 (33%) | $42.00 | $39.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gerstner Electric, Inc. | 27 | 22 of 27 |
| Reinhold Electric, Inc. | 21 | 15 of 21 |
| Capital Electric Line Builders, Inc. | 3 | 1 of 3 |
| CSD Environmental Services, Inc. | 2 | 1 of 2 |
| Ewing Signal Construction, LLC | 1 | 1 of 1 |
| Custom Lighting Services, LLC dba Black | 1 | 0 of 1 |
| T.G.B., Inc. | 1 | 0 of 1 |
| J M Scheidle, LLC | 1 | 1 of 1 |
| Collins & Hermann, Inc. | 1 | 0 of 1 |
| Custom Lighting Services, LLC dba Black & McDonald | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2026 | 261016-F04 | St. Louis | JSL0283 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 2 | $515,817 | +17% |
| 20 MAR 2026 | 260320-F03 | St. Louis | JSL0184 - VARIOUS ROUTES - VARIOUS COUNTIES | 3 of 3 | $2,626,679 | +18% |
| 20 FEB 2026 | 260220-F03 | St. Louis | JSL0203 - VARIOUS ROUTES - VARIOUS COUNTIES | 3 of 3 | $1,099,566 | +8.0% |
| 16 MAY 2025 | 250516-F12 | St. Louis | JSL0202-VARIOUS ROUTES-VARIOUS COUNTIES | 2 of 4 | $1,037,521 | +12% |
| 16 MAY 2025 | 250516-F13 | St. Louis | JSL0240 - VARIOUS ROUTES - STL COUNTY & STL CITY | 3 of 3 | $687,942 | +54% |
| 21 FEB 2025 | 250221-B07 | Northeast | JNEM0062-ROUTE 47-WARREN COUNTY | 1 of 2 | $42,125 | Low, 30% under the second |
| 15 NOV 2024 | 241115-F08 | St. Louis | JSL0177 - VARIOUS ROUTES - ST.LOUIS, ST, CHARLES COUNTIES | 2 of 3 | $285,650 | +170% |
| 20 SEP 2024 | 240920-F01 | St. Louis | JSL0179 - ROUTE 180 - ST LOUIS COUNTY | 3 of 3 | $2,360,319 | +18% |
| 17 MAY 2024 | 240517-F12 | St. Louis | JSL0110 - ROUTE 141 - ST LOUIS COUNTY | 3 of 3 | $2,194,364 | +36% |
| 17 MAY 2024 | 240517-H08 | Southeast | JSE0169 - VARIOUS ROUTES - BUTLER, HOWELL, OREGON, ST FRANCOIS, STODDARD COUNTIES | 2 of 2 | $1,590,377 | +5.0% |
| 16 FEB 2024 | 240216-F01 | St. Louis | J6I3644, J6I3645-VARIOUS ROUTES-ST LOUIS, ST LOUIS CITY, JEFFERSON, FRANKLIN, ST CHARLES | 3 of 3 | $882,039 | +44% |
| 19 JAN 2024 | 240119-C01 | Kansas City | J3P3085H - ROUTE I-70 - LAFAYETTE COUNTY | 1 of 2 | $868,232 | Low, 9.0% under the second |
| 19 MAY 2023 | 230519-F09 | St. Louis | J6S3583 - ROUTE 109 - ST LOUIS COUNTY | 3 of 3 | $1,111,158 | +11% |
| 19 MAY 2023 | 230519-F10 | St. Louis | J6S3597 - ROUTE 231 - ST LOUIS | 2 of 2 | $1,348,108 | +16% |
| 19 MAY 2023 | 230519-H08 | Southeast | JSE0096 - ROUTE 60 - TEXAS COUNTY | 1 of 1 | $1,649,341 | Low |
| 21 APR 2023 | 230421-F05 | St. Louis | JSL0089 - VARIOUS ROUTES - FRANLIN, JEFFERSON COUNTIES | 3 of 3 | $716,000 | +36% |
| 17 MAR 2023 | 230317-D02 | Central | JCD0080, JCD0081 - I-70, I-44 - VARIOUS COUNTIES | 2 of 3 | $2,174,944 | +1.0% |
| 17 FEB 2023 | 230217-F06 | St. Louis | J6Q3470, J6Q3475 - VARIOUS ROUTES - ST. LOUIS CITY, ST. LOUIS, ST. CHARLES, FRANKLIN, | 2 of 2 | $1,513,137 | +1.0% |
| 20 JAN 2023 | 230120-C03 | Kansas City | J3P3118E - ROUTE 13 - LAFAYETTE COUNTY | 2 of 3 | $268,072 | +4.0% |
| 16 DEC 2022 | 221216-F03 | St. Louis | J6I3576 - Various Routes - St. Louis City and St. Louis County | 3 of 3 | $2,582,044 | +9.0% |
| 18 FEB 2022 | 220218-D04 | Central | J5S3505 - ROUTE BB - PHELPS COUNTY | 1 of 3 | $196,593 | Low, 5.0% under the second |
| 18 FEB 2022 | 220218-F03 | St. Louis | J6I3485 - I-70 - ST. CHARLES COUNTY | 2 of 3 | $547,790 | +19% |
| 19 NOV 2021 | 211119-F06 | St. Louis | J6P3478 - VARIOUS ROUTES - VARIOUS COUTIES | 4 of 4 | $169,606 | +34% |
| 20 AUG 2021 | 210820-F01 | St. Louis | J6M0287 - ROUTE B - JEFFERSON COUNTY | 2 of 3 | $196,517 | +7.0% |
| 20 AUG 2021 | 210820-F02 | St. Louis | J6P3596 - ROUTE 21 - JEFFERSON COUNTY | 2 of 3 | $263,936 | +8.0% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.