Reinhold Electric, Inc.: MoDOT bid record
Reinhold Electric, Inc. submitted 30 bids on Missouri DOT contracts in the data, from 21 FEB 2020 to 15 MAY 2026, and was the low bidder on 10 of them (33%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $4,892,825
- Latest bid
- 15 MAY 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 0 | 0% |
| 2021 | 4 | 2 | 50% |
| 2022 | 4 | 2 | 50% |
| 2023 | 3 | 1 | 33% |
| 2024 | 6 | 3 | 50% |
| 2025 | 5 | 1 | 20% |
| 2026 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| St. Louis | 25 | 9 | 36% |
| Central | 2 | 0 | 0% |
| Southeast | 1 | 0 | 0% |
| Northwest | 1 | 1 | 100% |
| Kansas City | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signal sign, mounting hardware | 9020834 | EACH | 7 | 6 (86%) | $68.00 | $199.96 |
| Cable, 2 AWG, 1 conductor, power | 9108202 | LF | 7 | 6 (86%) | $3.50 | $4.00 |
| Wire, 2 AWG, bare neutral | 9108402 | LF | 7 | 6 (86%) | $3.50 | $4.00 |
| Conduit, 3 in., rigid, in trench | 9105201 | LF | 8 | 4 (50%) | $17.50 | $20.00 |
| Signal head, type 4B | 9020514 | EACH | 7 | 4 (57%) | $1,075.00 | $1,565.00 |
| Cable, 8 AWG 1 conductor, power | 9028208 | LF | 5 | 4 (80%) | $1.00 | $1.65 |
| Pull box, preformed class 5 | 9108816 | EACH | 5 | 4 (80%) | $2,400.00 | $3,150.00 |
| CCTV camera assembly, installed | 9103700 | EACH | 5 | 4 (80%) | $800.00 | $6,740.00 |
| Cable, 16 AWG 2 conductor | 9028308 | LF | 8 | 3 (38%) | $1.50 | $1.77 |
| Conduit, 2 in., trench with tracer wire | 9025200 | LF | 8 | 3 (38%) | $12.50 | $18.00 |
| Base, concrete | 9029100 | CY | 7 | 3 (43%) | $1,680.00 | $2,100.00 |
| Conduit, 3 in., trench with tracer wire | 9025300 | LF | 7 | 3 (43%) | $14.00 | $25.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gerstner Electric, Inc. | 28 | 19 of 28 |
| Meyer Electric Company, Inc. | 21 | 6 of 21 |
| R/S Electric Utility Services Corp. | 2 | 0 of 2 |
| CSD Environmental Services, Inc. | 2 | 0 of 2 |
| T.G.B., Inc. | 1 | 0 of 1 |
| J M Scheidle, LLC | 1 | 1 of 1 |
| Custom Lighting Services, LLC dba Black & McDonald | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 MAY 2026 | 260515-F07 | St. Louis | JSLM0083 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 2 | $1 | Low, 24% under the second |
| 20 MAR 2026 | 260320-F03 | St. Louis | JSL0184 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 3 | $2,412,357 | +8.0% |
| 20 FEB 2026 | 260220-F03 | St. Louis | JSL0203 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 3 | $1,095,135 | +8.0% |
| 17 OCT 2025 | 251017-F03 | St. Louis | J6Q2026E - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 2 | $1,677,088 | +12% |
| 16 MAY 2025 | 250516-A02 | Northwest | JNW0152 - ROUTE I-29 - BUCHANAN COUNTY | 1 of 3 | $173,488 | Low, 32% under the second |
| 16 MAY 2025 | 250516-C10 | Kansas City | JKU0063-VARIOUS ROUTES-PLATTE, JACKSON, CASS COUNTIES | 3 of 4 | $539,274 | +57% |
| 16 MAY 2025 | 250516-F12 | St. Louis | JSL0202-VARIOUS ROUTES-VARIOUS COUNTIES | 3 of 4 | $1,055,187 | +14% |
| 16 MAY 2025 | 250516-F13 | St. Louis | JSL0240 - VARIOUS ROUTES - STL COUNTY & STL CITY | 2 of 3 | $679,500 | +52% |
| 15 NOV 2024 | 241115-F08 | St. Louis | JSL0177 - VARIOUS ROUTES - ST.LOUIS, ST, CHARLES COUNTIES | 3 of 3 | $334,392 | +216% |
| 18 OCT 2024 | 241018-F02 | St. Louis | J6Q2025E-VARIOUS ROUTES-VARIOUS COUNTIES | 2 of 2 | $1,774,525 | +12% |
| 20 SEP 2024 | 240920-F01 | St. Louis | JSL0179 - ROUTE 180 - ST LOUIS COUNTY | 2 of 3 | $2,154,564 | +7.0% |
| 17 MAY 2024 | 240517-F12 | St. Louis | JSL0110 - ROUTE 141 - ST LOUIS COUNTY | 1 of 3 | $1,608,288 | Low, 20% under the second |
| 17 MAY 2024 | 240517-F17 | St. Louis | JSLM0044-VARIOUS ROUTES-ST. LOUIS, ST. CHARLES, FRANKLIN, JEFFERSON, ST. LOUIS CITY | 1 of 3 | $62,320 | Low, 74% under the second |
| 16 FEB 2024 | 240216-F01 | St. Louis | J6I3644, J6I3645-VARIOUS ROUTES-ST LOUIS, ST LOUIS CITY, JEFFERSON, FRANKLIN, ST CHARLES | 1 of 3 | $611,176 | Low, 7.0% under the second |
| 17 NOV 2023 | 231117-F05 | St. Louis | J6Q3174E - VARIOUS ROUTES - VARIOUS COUNTY | 2 of 2 | $1,683,950 | +6.0% |
| 19 MAY 2023 | 230519-F09 | St. Louis | J6S3583 - ROUTE 109 - ST LOUIS COUNTY | 2 of 3 | $1,056,429 | +6.0% |
| 21 APR 2023 | 230421-F05 | St. Louis | JSL0089 - VARIOUS ROUTES - FRANLIN, JEFFERSON COUNTIES | 1 of 3 | $527,314 | Low, 7.0% under the second |
| 16 DEC 2022 | 221216-F03 | St. Louis | J6I3576 - Various Routes - St. Louis City and St. Louis County | 2 of 3 | $2,397,850 | +1.0% |
| 21 OCT 2022 | 221021-F04 | St. Louis | J6Q3386E - ROUTE VARIOUS - ST. LOUIS, ST. LOUIS CITY, ST. CHARLES, JEFFERSON, FRANKLIN | 1 of 2 | $1,387,725 | Low, 6.0% under the second |
| 20 MAY 2022 | 220520-F05 | St. Louis | J6M0281-VARIOUS ROUTES-VARIOUS COUNTIES | 1 of 2 | $94,300 | Low |
| 18 FEB 2022 | 220218-D04 | Central | J5S3505 - ROUTE BB - PHELPS COUNTY | 2 of 3 | $206,734 | +5.0% |
| 19 NOV 2021 | 211119-F06 | St. Louis | J6P3478 - VARIOUS ROUTES - VARIOUS COUTIES | 3 of 4 | $163,972 | +30% |
| 20 AUG 2021 | 210820-F01 | St. Louis | J6M0287 - ROUTE B - JEFFERSON COUNTY | 1 of 3 | $182,822 | Low, 7.0% under the second |
| 20 AUG 2021 | 210820-F02 | St. Louis | J6P3596 - ROUTE 21 - JEFFERSON COUNTY | 1 of 3 | $245,391 | Low, 8.0% under the second |
| 19 MAR 2021 | 210319-F05 | St. Louis | J6Q3469,J6Q3473 - VARIOUS ROUTES - VARIOUS COUNTIES | 3 of 4 | $1,433,659 | +8.0% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.