MoDOT contract 260320-F03 bid tabulation
JSL0184 - VARIOUS ROUTES - VARIOUS COUNTIES. Let by Missouri DOT on March 20, 2026, St Louis, St. Louis. 3 bids received; low bid $2,235,401 by Gerstner Electric, Inc..
- Owner
- Missouri DOT
- Letting
- 20 MAR 2026
- Pay items
- 48
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerstner Electric, Inc. | $2,235,401 | Low |
| 2 | Reinhold Electric, Inc. | $2,412,357 | +8.0% |
| 3 | Meyer Electric Company, Inc. | $2,626,679 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerstner Electric, Inc. | 2. Reinhold Electric, Inc. | 3. Meyer Electric Company, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $6,900.00 | $6,500.00 | $9,000.00 |
| 0020 | Truck mounted attenuator (TMA) (6123001) | LS | 2 | $2,870.00 | $1,200.00 | $4,000.00 |
| 0030 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 2 | $1,600.00 | $1,500.00 | $3,000.00 |
| 0040 | Misc.misc. lump sum temporary traffic control (6169901) | LS | 1 | $35,280 | $22,000 | $35,000 |
| 0050 | Mobilization (6181000) | LS | 1 | $180,336 | $47,000 | $55,000 |
| 0060 | Cable, 2 AWG, 1 conductor, power (9108202) | LF | 7,200 | $5.25 | $4.25 | $4.50 |
| 0070 | Cable, 4 AWG, 1 conductor, power (9108204) | LF | 8,920 | $3.35 | $3.25 | $2.60 |
| 0080 | Cable, 6 AWG, 1 conductor, power (9108206) | LF | 1,510 | $4.25 | $2.65 | $1.98 |
| 0090 | Cable, 8 AWG, 1 conductor, power (9108208) | LF | 7,770 | $2.25 | $2.00 | $1.60 |
| 0100 | Wire, 2 AWG, bare neutral (9108402) | LF | 1,350 | $4.00 | $4.25 | $4.50 |
| 0110 | Wire, 4 AWG, bare neutral (9108404) | LF | 2,980 | $2.50 | $3.25 | $2.60 |
| 0120 | Wire, 6 AWG, bare neutral (9108406) | LF | 510 | $2.00 | $2.65 | $1.98 |
| 0130 | Wire, 8 AWG, bare neutral (9108408) | LF | 2,590 | $1.80 | $2.00 | $1.60 |
| 0140 | Base, concrete (9109100) | CY | 6 | $3,670.00 | $3,800.00 | $2,800.00 |
| 0150 | Misc.ITS asset management tool (9109901) | LS | 1 | $11,000 | $2,200.00 | $12,400 |
| 0160 | Misc.add circuit breaker (9109902) | EACH | 2 | $340.00 | $350.00 | $250.00 |
| 0170 | Misc.buried fiber driveable delineator post (9109902) | EACH | 75 | $125.00 | $160.00 | $150.00 |
| 0180 | Misc.CCTV camera pole 50FT. (9109902) | EACH | 11 | $10,375 | $11,250 | $9,200.00 |
| 0190 | Misc.CCTV camera pole 60 FT., with lowering device (9109902) | EACH | 4 | $31,825 | $37,640 | $35,000 |
| 0200 | Misc.CCTV camera pole 70 FT., with lowering device (9109902) | EACH | 1 | $36,100 | $41,620 | $40,250 |
| 0210 | Misc.CCTV extension pole, 20FT metallic finish (9109902) | EACH | 54 | $2,750.00 | $2,337.00 | $2,800.00 |
| 0220 | Misc.drilled shaft (2FT. 6IN. dia.) (9109902) | EACH | 11 | $7,350.00 | $10,105 | $19,000 |
| 0230 | Misc.drilled shaft (3 FT. 0 in. dia.) (9109902) | EACH | 4 | $10,000 | $10,105 | $22,082 |
| 0240 | Misc.drilled shaft (3 FT. 6 in. dia.) (9109902) | EACH | 1 | $13,250 | $20,060 | $22,700 |
| 0250 | Misc.fiber optic fusion splice (9109902) | EACH | 736 | $97.00 | $40.00 | $70.00 |
| 0260 | Misc.fiber optic jumper, SM (9109902) | EACH | 78 | $52.50 | $28.00 | $72.00 |
| 0270 | Misc.fiber optic pigtail, SM (9109902) | EACH | 108 | $42.50 | $28.00 | $70.00 |
| 0280 | Misc.furnish & install dome CCTV camera and assembly (9109902) | EACH | 126 | $3,700.00 | $3,600.00 | $4,500.00 |
| 0290 | Misc.furnish & install dome CCTV camera on high mast tower (9109902) | EACH | 3 | $5,400.00 | $3,600.00 | $6,900.00 |
| 0300 | Misc.install commission furnished and programmed IP-addressable power strip (9109902) | EACH | 20 | $200.00 | $260.00 | $350.00 |
| 0310 | Misc.install conduit into existing pull box (9109902) | EACH | 20 | $150.00 | $190.00 | $400.00 |
| 0320 | Misc.install or relocate existing communication equipment (9109902) | EACH | 20 | $355.00 | $380.00 | $1,600.00 |
| 0330 | Misc.intercept conduit with pull box (9109902) | EACH | 7 | $150.00 | $2,590.00 | $2,300.00 |
| 0340 | Misc.ITS pull box with concrete pad, preformed class 2 (9109902) | EACH | 27 | $3,185.00 | $2,390.00 | $2,900.00 |
| 0350 | Misc.ITS pull box with concrete pad, preformed class 5 (9109902) | EACH | 18 | $3,700.00 | $3,300.00 | $3,400.00 |
| 0360 | Misc.modified type 7 cabinet (9109902) | EACH | 4 | $5,200.00 | $5,610.00 | $7,000.00 |
| 0370 | Misc.power supply assembly, pad-mounted, 240/120 V, ITS (9109902) | EACH | 18 | $7,000.00 | $15,120 | $6,900.00 |
| 0380 | Misc.rack-mounted interconnect center (9109902) | EACH | 20 | $725.00 | $980.00 | $1,600.00 |
| 0390 | Misc.type 7 cabinet (9109902) | EACH | 16 | $5,150.00 | $5,100.00 | $7,210.00 |
| 0400 | Misc.underground splice closure (9109902) | EACH | 1 | $1,400.00 | $1,500.00 | $1,200.00 |
| 0410 | Misc.vertical mounting arm on existing DMS (9109902) | EACH | 7 | $3,350.00 | $2,500.00 | $2,950.00 |
| 0420 | Misc.CCTV camera cable (9109903) | LF | 11,570 | $1.40 | $2.50 | $2.60 |
| 0430 | Misc.conduit, 2 in., HDPE, bored (9109903) | LF | 3,920 | $17.50 | $23.00 | $19.00 |
| 0440 | Misc.conduit, 2 in., PVC, in trench (9109903) | LF | 1,070 | $13.25 | $14.00 | $15.00 |
| 0450 | Misc.conduit, 2 in.,HDPE, in trench (9109903) | LF | 5,380 | $12.00 | $14.00 | $14.00 |
| 0460 | Misc.conduit, 3 in., PVC, in trench (9109903) | LF | 410 | $16.00 | $17.00 | $20.00 |
| 0470 | Misc.fiber optic cable, 24-strand, single mode (9109903) | LF | 40,620 | $2.15 | $3.75 | $3.60 |
| 0480 | Misc.remove and reinstall FO cable (9109903) | LF | 34,430 | $1.00 | $4.00 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of March 20, 2026. Compiled by Mirage Metrics.