MoDOT contract 250516-F13 bid tabulation
JSL0240 - VARIOUS ROUTES - STL COUNTY & STL CITY. Let by Missouri DOT on May 16, 2025, St Louis City, St. Louis. 3 bids received; low bid $448,153 by Gerstner Electric, Inc..
- Owner
- Missouri DOT
- Letting
- 16 MAY 2025
- Pay items
- 10
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerstner Electric, Inc. | $448,153 | Low |
| 2 | Reinhold Electric, Inc. | $679,500 | +52% |
| 3 | Meyer Electric Company, Inc. | $687,942 | +54% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerstner Electric, Inc. | 2. Reinhold Electric, Inc. | 3. Meyer Electric Company, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $1,587.00 | $5,000.00 | $8,000.00 |
| 0020 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $2,200.00 | $500.00 | $1,000.00 |
| 0030 | Misc.temporary traffic control (6169901) | LS | 1 | $6,500.00 | $2,500.00 | $4,000.00 |
| 0040 | Mobilization (6181000) | LS | 1 | $26,488 | $8,900.00 | $10,000 |
| 0050 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $1,771.00 | $1,000.00 | $900.00 |
| 0060 | Misc.accessible pedestrian pushbutton and signing (9029902) | EACH | 8 | $1,341.00 | $850.00 | $1,500.00 |
| 0070 | Misc.rectangular rapid flashing beacon assembly - front & rear facing (2 sided) (9029902) | EACH | 17 | $16,102 | $24,150 | $25,206 |
| 0080 | Misc.rectangular rapid flashing beacon assembly - front facing only (1 sided) (9029902) | EACH | 10 | $11,192 | $21,150 | $20,000 |
| 0090 | Misc.rectangular rapid flashing beacon post reflective sheeting (9029902) | EACH | 50 | $73.00 | $350.00 | $203.00 |
| 0100 | 36 in. surface-mount delineator post (9031242) | EACH | 59 | $125.00 | $250.00 | $210.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.