MoDOT contract 250815-C01 bid tabulation
Fas s303(61). Let by Missouri DOT on August 15, 2025, Platte, Kansas City. 2 bids received; low bid $1,804,738 by Louis-Company, LLC.
- Owner
- Missouri DOT
- Letting
- 15 AUG 2025
- Pay items
- 60
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Louis-Company, LLC | $1,804,738 | Low |
| 2 | Capital Paving & Construction, LLC | $2,134,619 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louis-Company, LLC | 2. Capital Paving & Construction, LLC |
|---|---|---|---|---|---|
| 0010 | Project: J4S3492 bridge replacement section: 0001 roadway items - J4S3492 signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 |
| 0020 | Clearing and grubbing (2013000) | ACRE | 1 | $25,000 | $21,000 |
| 0030 | Removal of improvements (2022010) | LS | 1 | $13,262 | $46,500 |
| 0040 | Class A excavation (2031000) | CY | 1,174 | $15.31 | $22.00 |
| 0050 | Compacting embankment (2036000) | CY | 144 | $69.52 | $6.00 |
| 0060 | Class 3 excavation (2063000) | CY | 85 | $75.00 | $42.00 |
| 0070 | Linear grading class 1 (2071000) | STA | 2 | $8,500.00 | $2,600.00 |
| 0080 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 1,431 | $13.95 | $13.00 |
| 0090 | Misc. optional pavement (4019905) | SY | 1,275 | $125.00 | $110.00 |
| 0100 | Chain-link fence (60 in.) (6071012A) | LF | 141 | $70.42 | $67.00 |
| 0110 | Misc. 12-FT tube gate (6079902) | EACH | 1 | $3,456.82 | $3,300.00 |
| 0120 | Furnishing type 2 rock ditch liner (6096020) | CY | 70 | $112.67 | $81.00 |
| 0130 | Placing type 2 rock ditch liner (6096042) | CY | 70 | $36.75 | $81.00 |
| 0140 | Furnishing type 2 rock blanket (6113020) | CY | 414 | $105.45 | $72.00 |
| 0150 | Placing type 2 rock blanket (6113040) | CY | 414 | $31.07 | $72.00 |
| 0160 | Construction signs (6161005) | SF | 944 | $10.24 | $10.00 |
| 0170 | Channelizer (trim-line) (6161025) | EACH | 35 | $23.05 | $25.00 |
| 0180 | Type 3 moveable barricade (6161030) | EACH | 13 | $198.45 | $250.00 |
| 0190 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 7 | $4,160.99 | $4,800.00 |
| 0200 | Mobilization (6181000) | LS | 1 | $125,000 | $185,000 |
| 0210 | Additional mobilization for seeding (6181020) | EACH | 4 | $600.00 | $600.00 |
| 0220 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 1,159 | $0.83 | $1.50 |
| 0230 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 485 | $0.83 | $2.00 |
| 0240 | Permanent erosion control geotextile (6240103A) | SY | 242 | $1.60 | $8.50 |
| 0250 | Contractor furnished surveying and staking (6274000) | LS | 1 | $15,364 | $16,000 |
| 0260 | 24 in. pipe group C (7250424) | LF | 128 | $78.46 | $145.00 |
| 0270 | 24 in. or allowed substitute group C flared end section (7320824A) | EACH | 8 | $736.39 | $2,050.00 |
| 0280 | Mulching (8025006) | ACRE | 1.80 | $2,304.54 | $2,000.00 |
| 0290 | Seeding - cool season grasses (8051000A) | ACRE | 0.90 | $4,417.04 | $3,800.00 |
| 0300 | Sediment trap excavation (8061003) | CY | 17.40 | $49.28 | $50.00 |
| 0310 | Sediment trap rock (8061004) | CY | 4.40 | $320.08 | $250.00 |
| 0320 | Alternate ditch check (8061006) | LF | 310 | $15.36 | $15.00 |
| 0330 | Sediment removal (8061016) | CY | 31 | $67.71 | $20.00 |
| 0340 | Temporary seeding (8061017) | ACRE | 0.90 | $1,024.23 | $1,000.00 |
| 0350 | Silt fence (8061019) | LF | 824 | $4.48 | $4.00 |
| 0360 | Type C berm (8061050) | LF | 110 | $87.74 | $24.00 |
| 0370 | Section: 0002 guardrail/guard cable items - J4S3492 MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 50 | $41.61 | $40.00 |
| 0380 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 3 | $4,865.15 | $4,600.00 |
| 0390 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 3 | $4,609.09 | $4,400.00 |
| 0400 | Section: 0003 signing items - J4S3492 concrete footings, embedded (9031010) | CY | 0.20 | $4,481.05 | $4,300.00 |
| 0410 | Pipe posts (9031220) | LB | 90 | $19.20 | $18.00 |
| 0420 | Wood post, 4 in. by 4 in. (9031260) | LF | 8 | $38.41 | $36.00 |
| 0430 | 2 in. PSST post - 12 GA. (9031270A) | LF | 47 | $32.01 | $30.00 |
| 0440 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 4 | $192.05 | $180.00 |
| 0450 | SH-flat sheet (9035004A) | SF | 43 | $28.81 | $27.00 |
| 0460 | Section: 0004 bridge A9335 items - J4S3492 class 1 excavation (2061000) | CY | 70 | $40.96 | $110.00 |
| 0470 | Removal of bridges (2160500) | LS | 1 | $50,000 | $155,000 |
| 0480 | Bridge approach slab (minor road) (5031011A) | SY | 117 | $359.20 | $430.00 |
| 0490 | Galvanized structural steel piles (12 in) (7021212) | LF | 165 | $190.00 | $200.00 |
| 0500 | Galvanized structural steel piles (14 in) (7021214) | LF | 170 | $200.00 | $240.00 |
| 0510 | Pre-bore for piling (7026000) | LF | 215 | $159.53 | $230.00 |
| 0520 | Pile point reinforcement (7027000) | EACH | 20 | $344.35 | $200.00 |
| 0530 | Class B concrete (substructure) (7032003) | CY | 31.10 | $1,310.75 | $3,050.00 |
| 0540 | Class B-1 concrete (substructure) (7034003) | CY | 63.20 | $1,500.00 | $2,260.00 |
| 0550 | Class B-2 concrete (superstructure solid slab) (7034208) | CY | 279.10 | $2,437.28 | $2,070.00 |
| 0560 | Concrete curb (bridge rail) (7034630) | LF | 249 | $40.00 | $137.00 |
| 0570 | Reinforcing steel (bridges) (7061060) | LB | 5,330 | $1.07 | $2.60 |
| 0580 | Reinforcing steel (epoxy coated) (7101000) | LB | 50,400 | $0.90 | $2.50 |
| 0590 | Bridge rail (32 in. two tube structural steel) (7122300) | LF | 251 | $409.70 | $400.00 |
| 0600 | Vertical drain at end bents (7151001) | EACH | 2 | $1,113.87 | $5,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of August 15, 2025. Compiled by Mirage Metrics.