MoDOT contract 250919-A01 bid tabulation

JNW0013 - VARIOUS ROUTES - LINN , GRUNDY COUNTIES. Let by Missouri DOT on September 19, 2025, Linn, Northwest. 2 bids received; low bid $1,996,564 by Louis-Company, LLC.

Owner
Missouri DOT
Letting
19 SEP 2025
Pay items
54
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Louis-Company, LLC$1,996,564Low
2Emery Sapp & Sons, Inc.$2,229,627+12%
MoDOT contract 250919-A01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Louis-Company, LLC2. Emery Sapp & Sons, Inc.
0010Signet dbe reporting (1081000)LS1$1,000.00$1,000.00
0020Clearing and grubbing (2013000)ACRE1$17,756$6,000.00
0030Removal of improvements (2022010)LS1$31,696$24,500
0040Linear grading class 2 (2072000)STA11$2,907.31$1,900.00
0050Type 1 aggregate for base (4 in. thick) (3040143)SY1,115$11.84$23.00
0060Gravel (A) or crushed stone (B) (3105003)SY28$50.52$20.00
0070Misc.optional pavement (4019905)SY1,006.80$144.98$150.00
0080Furnishing type 1 rock ditch liner (6096010A)CY4.60$115.42$95.00
0090Placing type 1 rock ditch liner (6096041)CY4.60$193.27$150.00
0100Furnishing type 2 rock blanket (6113020)CY1,114$76.21$95.00
0110Placing type 2 rock blanket (6113040)CY1,114$20.75$42.00
0120Construction signs (6161005)SF402$12.61$7.50
0130Type 3 moveable barricade (6161030)EACH22$172.56$128.00
0140Mobilization (6181000)LS1$128,475$230,000
01504 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF1,242$3.98$2.25
0160Flowable backfill (6214600A)CY2$3,891.96$4,800.00
0170Permanent erosion control geotextile (6240103A)SY1,709$3.32$3.80
0180Contractor furnished surveying and staking (6274000)LS1$25,220$14,750
0190Mulching (8025006)ACRE0.40$9,829.00$3,950.00
0200Seeding - cool season grasses (8051000A)ACRE0.40$9,829.00$3,950.00
0210Sediment removal (8061016)CY59$30.30$22.00
0220Silt fence (8061019)LF856$3.65$2.95
0230Type C berm (8061050)LF966$25.25$60.00
0240Type 2C erosion control blanket (8064137)SY1,530$3.92$3.15
02502 in. PSST post - 12 GA. (9031270A)LF360$53.09$30.90
0260SHF-flat sheet fluorescent (9035069A)SF108$33.18$34.10
0270Removal of miscellaneous acm (non-friable) (2024018)LF12$99.55$430.00
0280Removal of existing bridge deck (2162500)SF3,908$12.66$12.00
0290Bridge approach slab (minor road) (5031011A)SY118$512.98$420.00
0300Slab on steel (7034212)SY434$425.86$545.00
0310Type H barrier (7034216)LF272$158.19$150.00
0320Strengthening existing beams (7121250)LS1$27,505$29,000
0330Slab drain (7123610)EACH24$481.09$600.00
0340Surface preparation for applying epoxy-mastic primer (7125102)LS1$3,840.67$3,085.00
0350Aluminum epoxy-mastic primer (7125960)LS1$3,840.67$3,085.00
0360Non-destructive testing (7126000)LF120$46.46$65.00
0370Removal of existing bridge deck (2162500)SF2,486$16.89$12.50
0380Bridge approach slab (minor road) (5031011A)SY105$476.85$515.00
0390Slab on steel (7034212)SY294$700.39$675.00
0400Type H barrier (7034216)LF214$175.00$160.00
0410Protective coating - concrete bents and piers (epoxy) (7110200)LS1$6,211.97$5,000.00
0420Shear connectors (7121159)EACH1,656$12.85$14.00
0430Strengthening existing beams (7121250)LS1$27,505$29,000
0440Slab drain (7123610)EACH18$353.53$600.00
0450Surface preparation for applying epoxy-mastic primer (7125102)LS1$3,928.94$3,160.00
0460Aluminum epoxy-mastic primer (7125960)LS1$3,928.94$3,160.00
0470Removal of existing bridge deck (2162500)SF6,502$9.63$10.00
0480Bridge approach slab (minor road) (5031011A)SY110$440.49$515.00
0490Slab on steel (7034212)SY780$450.95$510.00
0500Type H barrier (7034216)LF527$124.28$130.00
0510Protective coating - concrete bents and piers (epoxy) (7110200)LS1$8,229.54$6,610.00
0520Shear connectors (7121159)EACH2,832$13.37$11.50
0530Slab drain (7123610)EACH48$444.17$600.00
0540Non-destructive testing (7126000)LF120$46.46$65.00
MoDOT contract 250919-A01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy