MoDOT contract 251017-D08 bid tabulation

JCD0248 - VARIOUS ROUTES - VARIOUS COUNTIES. Let by Missouri DOT on October 17, 2025, Various, Central. 4 bids received; low bid $2,247,000 by Pace Construction Company, LLC.

Owner
Missouri DOT
Letting
17 OCT 2025
Pay items
23
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pace Construction Company, LLC$2,247,000Low
2N.B. West Contracting Company$2,395,145+7.0%
3Emery Sapp & Sons, Inc.$2,473,576+10%
4Capital Paving & Construction, LLC$3,058,184+36%
MoDOT contract 251017-D08: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pace Construction Company, LLC2. N.B. West Contracting Company3. Emery Sapp & Sons, Inc.4. Capital Paving & Construction, LLC
0010Signet dbe reporting (1081000)LS1$1,000.00$1,000.00$1,000.00$1,000.00
0020Removal of improvements (2022010)LS1$9,013.43$5,500.00$5,560.00$5,128.75
0030Shaping slopes, class III (2153000)100F20$1,427.43$1,427.43$1,700.00$1,427.43
0040Gravel (A) or crushed stone (B) (3105002)TON712$76.00$125.00$76.00$157.27
0050Misc.replacement of damaged pavement (4029910)TON300$77.00$250.00$85.00$256.34
0060Tack coat (4071005)GAL27,949$2.45$2.20$2.50$2.46
0070Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH4$2,950.00$2,950.00$3,300.00$3,500.00
0080Misc.lump sum temporary traffic control (6169901)LS1$16,500$16,500$18,000$22,500
0090Mobilization (6181000)LS1$195,000$170,000$238,000$135,145
0100Preformed thermoplastic pavement marking, 24 in. white (6200015)LF49$25.00$25.00$27.50$25.00
0110Preformed thermoplastic pavement marking, R/R crossing marker (6200033)EACH2$1,250.00$1,250.00$1,400.00$1,250.00
01204 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF288,679$0.15$0.15$0.16$0.15
01304 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF288,679$0.11$0.11$0.12$0.11
0140Pavement marking removal (symbols) (6207002)EACH1$200.00$1.00$218.00$200.00
0150Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY7,420$4.25$8.05$5.00$6.58
0160Modified coldmilling (depth transitions) (6224010)SY3,604$2.70$12.50$8.50$13.55
0170Misc.removal of damaged pavement (6229905)SY900$6.70$40.00$17.50$43.51
0180Misc.transverse rumble strip (6269905)SY68$76.00$300.00$82.50$156.42
0190MGS guardrail (6061060)LF1,500$27.52$27.52$30.00$27.52
0200Type A crashworthy end terminal (MASH) (6063014)EACH9$3,300.42$3,300.42$3,600.00$3,300.42
0210Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON7,996.10$78.00$75.50$79.00$103.77
0220Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON9,660.60$78.00$76.50$80.00$103.62
0230Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON3,510.80$74.00$80.50$102.00$132.74
MoDOT contract 251017-D08: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of October 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy