MoDOT contract 251017-H02 bid tabulation
J9S3798 - VARIOUS ROUTES - VARIOUS COUNTIES. Let by Missouri DOT on October 17, 2025, Various, Southeast. 4 bids received; low bid $297,533 by Putz Construction, LLC.
- Owner
- Missouri DOT
- Letting
- 17 OCT 2025
- Pay items
- 30
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Putz Construction, LLC | $297,533 | Low |
| 2 | Fronabarger Concreters, Inc. | $327,800 | +10% |
| 3 | Hessling Construction, Inc. | $439,467 | +48% |
| 4 | RL Persons Construction, Inc. | $894,995 | +201% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Putz Construction, LLC | 2. Fronabarger Concreters, Inc. | 3. Hessling Construction, Inc. | 4. RL Persons Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $25,000 | $35,000 | $65,853 | $150,000 |
| 0030 | Linear grading class 1 (2071000) | STA | 14.30 | $1,800.00 | $1,000.00 | $1,680.97 | $4,500.00 |
| 0040 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 198 | $13.75 | $15.00 | $22.05 | $30.50 |
| 0050 | Modified concrete gutter type A (6071101) | LF | 124 | $90.00 | $90.00 | $59.55 | $220.00 |
| 0060 | Concrete curb ramp (6081010) | SY | 168 | $185.00 | $170.00 | $253.90 | $485.00 |
| 0070 | Truncated domes (6081012) | SF | 230 | $38.00 | $38.00 | $39.95 | $35.00 |
| 0080 | Paved approach, 8 in. (6085008) | SY | 151 | $110.00 | $120.00 | $187.98 | $310.00 |
| 0090 | Concrete sidewalk, 4 in. (6086004) | SY | 372 | $75.00 | $108.00 | $100.57 | $180.00 |
| 0100 | Concrete sidewalk, 8 in. (6086008) | SY | 124 | $110.00 | $130.00 | $182.06 | $265.00 |
| 0110 | Integral curb (6 in. height and under) type A (6092011) | LF | 140 | $75.00 | $40.00 | $68.52 | $140.00 |
| 0120 | Construction signs (6161005) | SF | 481 | $7.15 | $6.50 | $12.73 | $17.25 |
| 0130 | Channelizer (trim-line) (6161025) | EACH | 200 | $15.40 | $14.00 | $78.87 | $39.50 |
| 0140 | Flashing arrow panel (6161040) | EACH | 3 | $1,100.00 | $1,000.00 | $4,435.36 | $2,025.00 |
| 0150 | Misc.ADA compliant moveable barricade (6169902) | EACH | 10 | $159.50 | $145.00 | $1,151.41 | $300.00 |
| 0160 | Mobilization (6181000) | LS | 1 | $25,000 | $42,150 | $14,976 | $193,216 |
| 0170 | Preformed thermoplastic pavement marking, 6 in. white (6200009) | LF | 859 | $7.15 | $6.50 | $8.95 | $8.75 |
| 0180 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 435 | $31.90 | $29.00 | $32.26 | $40.00 |
| 0190 | Pavement marking removal (6207001) | LF | 135 | $5.50 | $5.00 | $23.15 | $6.75 |
| 0200 | Contractor furnished surveying and staking (6274000) | LS | 1 | $8,500.00 | $15,000 | $13,032 | $10,500 |
| 0210 | Misc.water valve/manhole height adjustment (7319902) | EACH | 1 | $500.00 | $225.00 | $2,808.84 | $2,365.00 |
| 0220 | Turf type tall fescue soddingsodding (8031000A) | SY | 731 | $22.00 | $20.00 | $30.13 | $73.50 |
| 0230 | Seeding - cool season grasses (8051000A) | ACRE | 1 | $2,800.00 | $10,000 | $9,305.37 | $20,850 |
| 0240 | Curb inlet check (8061007A) | EACH | 7 | $200.00 | $150.00 | $472.20 | $525.00 |
| 0250 | Sediment removal (8061016) | CY | 7 | $12.00 | $50.00 | $263.81 | $65.00 |
| 0260 | Silt fence (8061019) | LF | 1,000 | $4.00 | $3.50 | $8.11 | $14.50 |
| 0270 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 378 | $22.00 | $20.00 | $26.73 | $27.00 |
| 0280 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 81 | $121.00 | $110.00 | $144.75 | $147.50 |
| 0290 | SHF-flat sheet fluorescent (9035069A) | SF | 340.50 | $41.80 | $38.00 | $48.70 | $50.95 |
| 0300 | Misc.relocate existing signs (9039902) | EACH | 1 | $550.00 | $500.00 | $1,632.41 | $675.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of October 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.