Arawak Paving Co., Inc. submitted 17 bids on New Jersey DOT contracts in the data, from 06 MAR 2018 to 26 MAR 2026, and was the low bidder on 4 of them (24%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $25,371,000
- Latest bid
- 26 MAR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 0 | 0% |
| 2019 | 3 | 1 | 33% |
| 2020 | 2 | 1 | 50% |
| 2021 | 3 | 1 | 33% |
| 2022 | 1 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 2 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| S1 | 9 | 4 | 44% |
| S4 | 8 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 10 | 10 (100%) | $20,650 | $2,700.00 |
| Asphalt price adjustment | 160007M | DOL | 10 | 10 (100%) | $38,950 | $10,200 |
| Hot mix asphalt 12.5 M 64 surface course | 401054M | T | 13 | 9 (69%) | $77.60 | $120.00 |
| Removal of RPM | 610024M | U | 10 | 8 (80%) | $4.00 | $10.00 |
| Full depth concrete pavement repair, HMA | 453006M | SY | 10 | 7 (70%) | $75.00 | $200.00 |
| Hot mix asphalt 9.5 M E surface course | 401049M | T | 8 | 7 (88%) | $80.25 | $118.00 |
| Rumble strip | 610033M | LF | 19 | 6 (32%) | $0.75 | $1.07 |
| HMA milling, 3" or less | 401009P | SY | 18 | 6 (33%) | $3.75 | $6.85 |
| Curb piece | 602213M | U | 13 | 6 (46%) | $350.00 | $500.00 |
| Cleaning drainage structure | 602216M | U | 12 | 6 (50%) | $300.00 | $450.00 |
| Bicycle safe grate | 602210M | U | 11 | 6 (55%) | $300.00 | $469.00 |
| Hot mix asphalt 12.5 M E surface course | 401061M | T | 9 | 6 (67%) | $115.00 | $125.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| South State, Inc. | 14 | 10 of 14 |
| A.E. Stone, Inc. | 10 | 5 of 10 |
| Richard E. Pierson Construction Co., Inc. | 4 | 2 of 4 |
| Earle Asphalt Company | 4 | 4 of 4 |
| Schifano Construction Corp. | 2 | 0 of 2 |
| Black Rock Enterprises, LLC | 2 | 0 of 2 |
| Joseph Defino Contracting Co., Inc. Ta Defino Contrcting Co. | 2 | 0 of 2 |
| Joseph Defino Trucking Co., Inc. T/A Defino Contrcting Co. | 1 | 0 of 1 |
| Richard E. Pierson Constr Co., Inc. | 1 | 1 of 1 |
| Trap Rock Industries, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 MAR 2026 | 26408 | S4 | MAINTENANCE ROADWAY CONTRACT S314 | 2 of 2 | $11,279,000 | +19% |
| 05 JUN 2025 | 25111 | S1 | Rt 9, CR 559 (Mays Landing RD) to Bayview Drive | 3 of 3 | $6,193,000 | +23% |
| 21 NOV 2024 | 24140 | S1 | Rt. 206 - Park Av to Willow Grove Rd / Old Indian Mill Rd | 2 of 3 | $2,068,900 | +3.0% |
| 25 JUN 2024 | 24125 | S1 | ROUTE 73, CENTRAL AVENUE TO CR 534 (JACKSON ROAD) | 3 of 4 | $4,933,000 | +24% |
| 01 JUN 2023 | 23108 | S1 | Route 9 Wrights Lane to Harbor Road | 1 of 2 | $8,589,000 | Low, 2.0% under the second |
| 09 FEB 2023 | 23407 | S4 | MAINTENANCE ROADWAY CONTRACT S118, DP 23407 | 3 of 4 | $9,788,000 | +16% |
| 04 JAN 2022 | 22408 | S4 | Maintenance Roadway Contract S310, DP 22408 | 2 of 2 | $8,388,000 | +17% |
| 27 MAY 2021 | 21122 | S1 | Route 30 Atco Avenue to Route 206 | 4 of 4 | $13,398,000 | +20% |
| 13 MAY 2021 | 20142 | S1 | ROUTE 322, RT 73 (MAYS LANDING) TO RT 50 | 1 of 3 | $5,067,000 | Low, 7.0% under the second |
| 15 APR 2021 | 21408 | S4 | MRC S212, DP 21408 | 3 of 3 | $5,389,000 | +8.0% |
| 06 AUG 2020 | 20128 | S1 | ADA South, Contract 1 without ROW (Route 206 & Route 322) | 1 of 2 | $3,198,000 | Low, 24% under the second |
| 21 MAY 2020 | 20106 | S1 | Route 322, RT 50 to Leipzig Ave. | 5 of 5 | $13,274,000 | +16% |
| 30 MAY 2019 | 19111 | S1 | Route 73, CR 721 to NJ Transit Bridge | 1 of 3 | $8,517,000 | Low, 9.0% under the second |
| 21 FEB 2019 | 19409 | S4 | MRRC South, Sub-Region S-3, Contract No. S308 | 2 of 3 | $8,429,000 | +5.0% |
| 15 JAN 2019 | 19417 | S4 | MTN Resurfacing Contract South 2019 | 3 of 6 | $8,414,000 | +9.0% |
| 12 APR 2018 | 18401 | S4 | MRRC South, Sub Region S-1, Contract No. S111 | 3 of 5 | $6,117,000 | +7.0% |
| 06 MAR 2018 | 18433 | S4 | MTN Resurfacing Contract South 2018 | 2 of 6 | $3,988,000 | +11% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.