Consolidated Steel & Aluminum Fence Co., Inc.: NJDOT bid record

Consolidated Steel & Aluminum Fence Co., Inc. submitted 14 bids on New Jersey DOT contracts in the data, from 28 APR 2020 to 06 NOV 2025, and was the low bidder on 13 of them (93%).

Owner
New Jersey DOT
Low bid volume
$11,081,825
Latest bid
06 NOV 2025
Data through
16 APR 2026
14Bids
13Low bids
93Win rate, percent

By year

YearBidsLow bidsWin rate
202022100%
202133100%
202233100%
20233267%
202533100%
Consolidated Steel & Aluminum Fence Co., Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
N455100%
C455100%
S44375%
Consolidated Steel & Aluminum Fence Co., Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Emergency mobilizationMMR006MU1111 (100%)$1,000.00$10,000
Field office equipmentMMG018MDOL1111 (100%)$1.00$1.00
Force account, labor, equipment and materialsMMB091MDOL1111 (100%)$1.00$1.00
Chain-link fence, aluminum- coated steel, 6' high605009PLF1110 (91%)$65.00$60.00
Chain-link fence, PVC-coated steel, 6' high605027PLF1110 (91%)$63.00$65.00
Repairing chain-link fence605174MLF1110 (91%)$60.00$60.00
Gate, chain-link fence, PVC- coated steel, 10' wide605108MU1010 (100%)$0.01$0.01
Gate, chain-link fence, PVC- coated steel, 4' wide605099MU1010 (100%)$0.01$0.01
Gate, chain-link fence, aluminum coated steel, 8' wide605066MU1010 (100%)$0.01$0.01
Gate, chain-link fence, PVC- coated steel, 16' wide605120MU1010 (100%)$0.01$0.01
Gate, chain-link fence, aluminum coated steel, 4' wide605060MU1010 (100%)$0.01$0.01
Gate, chain-link fence, aluminum coated steel, 16' wide605081MU1010 (100%)$0.01$0.01
Consolidated Steel & Aluminum Fence Co., Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Iew Construction Group, Inc.110 of 11
South State, Inc.21 of 2
Senco Metals, LLC10 of 1
Consolidated Steel & Aluminum Fence Co., Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 NOV 202526449C4MTN Fence Repair Contract Central 20261 of 1$927,003Low
30 OCT 202526450S4MTN Fence Repair Contract South 20261 of 1$395,252Low
23 OCT 202526448N4MTN Fence Repair Contract North 20261 of 1$952,153Low
14 DEC 202324450S4MTN Fence Repair Contract South 20242 of 4$650,917+2.0%
30 NOV 202324449C4MTN Fence Repair Contract Central 20241 of 3$911,625Low, 35% under the second
28 NOV 202324448N4MTN Fence Repair Contract North 20241 of 2$1,750,581Low, 43% under the second
14 APR 202222462C4Re-ADV Maintenance Fence Repair Contract, Central - 20221 of 2$757,201Low, 32% under the second
25 JAN 202222424N4Maintenance Fence Repair Contract, North - 20221 of 2$766,387Low, 30% under the second
13 JAN 202222426S4Maintenance Fence Repair Contract, South - 20221 of 2$707,603Low, 33% under the second
11 FEB 202121438S4Maintenance Fence Repair Contract, South - 20211 of 2$944,503Low, 1.0% under the second
09 FEB 202121437C4Maintenance Fence Repair Contract, Central - 20211 of 2$614,433Low, 18% under the second
04 FEB 202121436N4Maintenance Fence Repair Contract, North - 20211 of 2$679,284Low, 6.0% under the second
30 APR 202020463C4Maintenance Fence Repair Contract, Central 20201 of 2$832,989Low, 14% under the second
28 APR 202020462N4Maintenance Fence Repair Contract, North - 20201 of 2$842,813Low, 15% under the second
Consolidated Steel & Aluminum Fence Co., Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way