Mobile Dredging & Video Pipe, Inc.: NJDOT bid record
Mobile Dredging & Video Pipe, Inc. submitted 14 bids on New Jersey DOT contracts in the data, from 08 AUG 2017 to 20 NOV 2025, and was the low bidder on 6 of them (43%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $27,808,684
- Latest bid
- 20 NOV 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2022 | 2 | 1 | 50% |
| 2023 | 1 | 1 | 100% |
| 2024 | 1 | 1 | 100% |
| 2025 | 2 | 2 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 12 | 4 | 33% |
| S4 | 1 | 1 | 100% |
| S1 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Oil only emergency spill kit, type 1 | 158072M | U | 12 | 8 (67%) | $500.00 | $900.00 |
| Performance bond and payment bond | 151006M | DOL | 12 | 5 (42%) | $33,762 | $32,468 |
| Pollution liability insurance | 152015P | DOL | 12 | 5 (42%) | $10,000 | $8,500.00 |
| Field office type A maintenance | 155021M | MO | 12 | 5 (42%) | $2,725.00 | $2,500.00 |
| Construction driveway | 158060M | T | 6 | 4 (67%) | $100.00 | $60.00 |
| Construction identification sign, 6' X 12' | 159018M | U | 11 | 3 (27%) | $3,000.00 | $1,750.00 |
| Construction layout | 157004M | DOL | 10 | 3 (30%) | $37,500 | $40,000 |
| Dredging, transport and placement to CDF | 202041M | CY | 6 | 3 (50%) | $16.56 | $20.43 |
| Field office type A set UP | 155003M | U | 12 | 2 (17%) | $36,000 | $30,000 |
| Dredged material processing | MMG015M | CY | 6 | 2 (33%) | $15.68 | $15.68 |
| Heavy duty silt fence, orange | 158009M | LF | 5 | 2 (40%) | $15.00 | $8.00 |
| Dredging | MMG014M | CY | 7 | 1 (14%) | $26.16 | $28.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H&L Contracting, LLC | 10 | 6 of 10 |
| J.F. Brennan Co., Inc. | 5 | 0 of 5 |
| Ferreira Construction Co., Inc. | 2 | 0 of 2 |
| Mount Construction Co., Inc. | 2 | 0 of 2 |
| 22-2166036 Wickberg Marine Contracting, Inc. | 1 | 1 of 1 |
| 35-1474620 Southwind Construction Corp. | 1 | 1 of 1 |
| 26-0135998 Sumco Eco-Contracting, LLC | 1 | 1 of 1 |
| Sevenson Environmental Services, Inc. | 1 | 1 of 1 |
| Sumco Eco- Contracting, LLC | 1 | 0 of 1 |
| Wickberg Marine Contracting, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 NOV 2025 | 25706 | S1 | Maint Dredging and Imp for the Brigantine Channel Spur | 1 of 1 | $1,795,206 | Low |
| 28 OCT 2025 | 25704 | S4 | Maint Dredging Nacote Creek Channel # 166-167 | 1 of 3 | $889,000 | Low, 65% under the second |
| 27 AUG 2024 | 24703 | H4 | UPPER NAVESINK RIVER | 1 of 2 | $5,200,548 | Low, 91% under the second |
| 24 AUG 2023 | 23703 | H4 | Maintenance Dredging of Wildwood Channels Phase 1 | 1 of 3 | $9,764,072 | Low, 15% under the second |
| 17 NOV 2022 | 22465 | H4 | Maintenance Dredging of Keansburg Channels | 2 of 2 | $2,712,823 | +6.0% |
| 15 NOV 2022 | 23702 | H4 | Re-Adv of Maintenance Dredging of Cape May | 1 of 3 | $2,684,792 | Low, 26% under the second |
| 24 JUN 2021 | 21446 | H4 | Maintenance Dredging of Manasquan Channels, Phase II | 2 of 2 | $9,996,252 | +39% |
| 17 JUN 2021 | 21445 | H4 | Dredging for Cedar Run, West Creek and Parkers Run | 1 of 4 | $7,475,067 | Low, 3.0% under the second |
| 25 FEB 2021 | 21432 | H4 | Maintenance Dredging of Absecon Creek Channel | 3 of 5 | $7,170,835 | +12% |
| 07 JAN 2021 | 21447 | H4 | Re advert of JOC Maintenance Dredging 2020 - >35,000 CY | 3 of 3 | $5,391,397 | +32% |
| 10 DEC 2020 | 15430 | H4 | Maintenance Dredging of Lakes Bay Complex, Atlantic Co., NJ | 2 of 3 | $3,805,650 | +3.0% |
| 15 OCT 2020 | 20468 | H4 | Good Luck Point Channels | 2 of 3 | $2,123,900 | +1.0% |
| 26 JUL 2018 | 18472 | H4 | Maintenance Dredging of the Metedeconk/Kettle Creek Complex | 2 of 3 | $18,766,963 | +15% |
| 08 AUG 2017 | 17414 | H4 | Dredging of Spicers and Beach Creek and St. Georges Channels | 3 of 4 | $2,222,807 | +37% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.