Top Line Construction Corp.: NJDOT bid record

Top Line Construction Corp. submitted 12 bids on New Jersey DOT contracts in the data, from 28 SEP 2017 to 19 FEB 2026, and was the low bidder on 1 of them (8%). When it was not low, its total sat a median +29% above the low bid.

Owner
New Jersey DOT
Low bid volume
$8,386,039
Latest bid
19 FEB 2026
Data through
16 APR 2026
12Bids
1Low bids
8Win rate, percent
+29%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
2017200%
201911100%
2020200%
2021300%
2023200%
2024100%
2026100%
Top Line Construction Corp., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
N17114%
C4300%
C1100%
N4100%
Top Line Construction Corp., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Straw mulching809003MSY1211 (92%)$0.24$1.00
Bridge deck waterproof surface course555006MT1010 (100%)$607.07$800.00
Tack coat 76-22401034MGAL1010 (100%)$6.00$11.00
Fertilizing and seeding, type A-3806006PSY119 (82%)$0.25$1.75
Detectable warning surface606084PSY117 (64%)$144.00$300.00
Reset water valve box651255MU107 (70%)$29.12$75.00
Reset gas valve box653084MU107 (70%)$29.12$60.00
Fuel price adjustment160004MDOL77 (100%)$4,500.00$2,700.00
Asphalt price adjustment160007MDOL77 (100%)$9,100.00$10,200
Fertilizing and seeding, type F806018PSY66 (100%)$0.25$2.10
Traffic stripes, latex, 4"159300MLF134 (31%)$0.22$0.26
Full depth concrete pavement repair, HMA453006MSY114 (36%)$173.81$200.00
Top Line Construction Corp., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Crisdel Group, Inc.127 of 12
Schifano Construction Corp.107 of 10
Black Rock Enterprises, LLC107 of 10
Della Pello Paving, Inc.87 of 8
D'Annunzio & Sons, Inc.64 of 6
Tilcon New York, Inc.53 of 5
South State, Inc.33 of 3
Intercounty Paving Associates, LLC22 of 2
Joseph Defino Trucking Co., Inc. T/A Defino Contrcting Co.21 of 2
Green Construction, Inc.22 of 2
Top Line Construction Corp., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
19 FEB 202626402N1Maintenance Roadway Contract N1129 of 9$9,695,005+29%
28 MAR 202424465C4ROUTE 1, CR522 TO THOMAS AVE HSR PILOT PROJECT4 of 5$7,378,589+12%
23 FEB 202323405C4Maintenance Roadway Contract C217, DP 234058 of 8$12,797,918+27%
24 JAN 202323401N4Maintenance Roadway Contract N110, DP 234016 of 7$12,913,661+37%
08 APR 202121107N1Rt 31, Franklin Rd (CR 634) to Route 462 of 8$7,275,116+18%
18 MAR 202121403C4Maintenance Roadway Contract C213, DP 214036 of 8$16,222,851+42%
21 JAN 202120146N1ROUTE 1, COLLEGE RD TO CR 522 (STOUTS LANE/PROMENADE BLVD)7 of 7$4,344,878+50%
18 JUN 202020125N1Rt 202, Childs Rd/N Maple to Academy Pl9 of 9$8,883,567+48%
09 APR 202020111N1ROUTE 171 FROM ROUTE 130 TO LINCOLN AVENUE5 of 7$4,204,878+54%
07 FEB 201918152N1ROUTE 57 FROM ROUTRE 22 TO ROUTE 311 of 6$8,386,039Low, 7.0% under the second
17 OCT 201717142C1ROUTE 27 BRIDGE STREET TO FREDERIC ST7 of 7$4,012,963+22%
28 SEP 201717141N1ROUTE 181 NORTHBOUND AND SOUTHBOUND2 of 5$1,774,097+8.0%
Top Line Construction Corp.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy