Pay items
130
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ahern Painting Contractors Inc$20,893,024Low
2FCS Group LLC$24,954,747+19%
NYSDOT contract D265631: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ahern Painting Contractors Inc2. FCS Group LLC
1Clearing and Grubbing (201.06)LS1$20,000$30,000
2Clearing and Grubbing (201.07)ACRE1$7,500.00$35,000
3Unclassified Excavation and Disposal (203.02)CY50$200.00$150.00
4Embankment In Place (203.03)CY100$100.00$80.00
5 (206.04010011)100$150.00$600.00
6 (564.10010011)1,400$10.00$12.75
7 (564.10020011)1,400$100.00$71.50
8 (564.510001)LB13,585$88.00$71.00
9Lead-Exposure Control Plan (570.01)LS1$7,500.00$1,000.00
10Medical Testing (570.02)DOL100,000$1.00$1.00
11Personal-Exposure-Monitoring Sample Analysis (570.03)DOL79,000$1.00$1.00
12Decontamination Facilities (570.04)CALENDAR WEEK72$150.00$100.00
13 (570.090001)LS1$2,000.00$7,000.00
14 (570.090002)LS1$2,000.00$3,000.00
15 (570.090003)LS1$2,000.00$3,000.00
16 (570.090004)LS1$2,000.00$5,000.00
17 (570.090005)LS1$2,000.00$5,000.00
18 (570.090006)LS1$2,000.00$5,000.00
19 (570.090007)LS1$2,000.00$7,000.00
20 (570.090008)LS1$2,000.00$3,000.00
21 (570.090009)LS1$2,000.00$3,000.00
22 (570.090010)LS1$2,000.00$3,000.00
23 (570.090011)LS1$2,000.00$3,000.00
24 (570.090012)LS1$2,000.00$7,000.00
25 (570.090013)LS1$2,000.00$7,000.00
26 (570.090014)LS1$2,000.00$7,000.00
27 (570.090015)LS1$2,000.00$7,000.00
28 (570.150001)LS1$448,250$495,000
29 (570.150002)LS1$359,580$250,000
30 (570.150003)LS1$227,692$250,000
31 (570.150004)LS1$263,356$245,000
32 (570.150005)LS1$571,817$480,000
33 (570.150006)LS1$646,852$540,000
34 (570.150007)LS1$732,865$750,000
35 (570.150008)LS1$249,398$200,000
36 (570.150009)LS1$228,426$150,000
37 (570.150010)LS1$778,809$600,000
38 (570.150011)LS1$949,578$600,000
39 (570.150012)LS1$767,411$450,000
40 (570.150013)LS1$807,760$450,000
41 (570.150014)LS1$543,355$355,000
42 (570.150015)LS1$649,439$401,500
43Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB170,000$0.30$0.16
44Disposal of Non-Hazardous Industrial Solid Paint Removal Waste (571.04)LB170,000$0.30$0.16
45 (573.010001)LS1$298,833$1,080,000
46 (573.010002)LS1$239,720$450,000
47 (573.010003)LS1$151,794$450,000
48 (573.010004)LS1$175,571$430,000
49 (573.010005)LS1$381,211$1,040,000
50 (573.010006)LS1$431,234$1,170,000
51 (573.010007)LS1$488,576$1,300,000
52 (573.010008)LS1$166,265$430,000
53 (573.010009)LS1$152,284$395,000
54 (573.010010)LS1$519,206$1,350,000
55 (573.010011)LS1$633,052$1,350,000
56 (573.010012)LS1$511,607$975,000
57 (573.010013)LS1$538,507$975,000
58 (573.010014)LS1$362,237$600,000
59 (573.010015)LS1$432,959$700,000
60 (585.01)EACH25$39,000$25,100
61Removal of Rivets-Replacement with High Strength Bolts (586.05)EACH610$90.00$148.00
62Field Drill Holes in Existing Structural Steel (586.10)EACH720$90.00$148.00
63 (589.010001)LB12,350$37.00$17.00
64 (607.41010010)3,200$10.00$12.00
65Limestone (610.06)LB50$2.00$2.50
66Mycorrhizal Fungi (610.0701)LB50$10.00$20.00
67Compost (610.10)CY50$120.00$1.50
68Mulch for Planting Type C – USDA-APHIS Protocol Wood Chips (610.1102)CY200$80.00$25.00
69Weed Removal (610.13)SY1,000$4.00$10.00
70Topsoil - Roadside (610.1402)CY200$110.00$85.00
71Topsoil - Lawns (610.1403)CY25$125.00$220.00
72Turf Establishment - Roadside (610.1601)SY1,000$9.00$7.00
73Turf Establishment -Lawns (610.1602)SY500$13.00$7.00
74Watering Vegetation (610.19)1,000 GALLONS200$160.00$60.00
75Mowing (610.21)SY1,000$3.00$4.00
76Care of Trees Over 24” to 36” Diam. at Breast Height - Pruning (614.0431)EACH25$950.00$250.00
77Improvement of Vegetated Areas (614.05)SY200$20.00$30.00
78 (614.060503)EACH20$1,500.00$750.00
79Tree Root Zone Treatment (Vertical Mulching/Aeration) (614.08)SY200$32.00$40.00
80 (614.08110009)50$450.00$350.00
81 (614.08120009)50$65.00$200.00
82 (614.08210009)50$275.00$700.00
83 (614.08220009)50$30.00$500.00
84Tree Root Pruning (614.09)LF50$30.00$200.00
85 (615.33010011)15$625.00$500.00
86 (615.33020011)30$650.00$1,500.00
87 (615.33030011)315$20.00$100.00
88 (615.43000011)4,400$12.50$40.00
89Basic Work Zone Traffic Control (619.01)LS1$1,150,000$584,000
90Type III Construction Barricades (619.04)EACH1,320$20.00$75.00
91 (619.080102)LF1,200$3.00$6.00
92 (619.100101)LF1,200$3.00$5.00
93 (619.10050020)2,010$20.00$40.00
94 (619.110512)EACH4$7,500.00$1,500.00
95Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF2,700$50.00$100.00
96Warning Lights on Temporary Positive Barriers (619.1719)EACH180$50.00$40.00
97Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH2$25,000$5,000.00
98Temporary Sand Barrel Module (619.21)EACH4$1,000.00$2,500.00
99Nighttime Operations (Entire Project) (619.24)LS1$270,000$20,000
100 (619.67020010)LS1$25,000$7,000.00
101 (619.70040011)2,400$25.00$35.00
102 (634.97100011)3,000$40.00$25.00
103 (634.98010011)200$10.00$30.00
104Engineer’s Field Office – Type 5 (637.15)MONTH27$8,000.00$5,280.00
105 (637.31020020)27$1,000.00$1,250.00
106Office Technology and Supplies (637.34)DOL8,500$1.00$1.00
107Partnering Workshop (637.35)DOL5,000$1.00$1.00
108 (639.10210011)LS1$78,000$80,000
109White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF1,200$3.00$6.00
110 (691.04000020)109,200$1.00$1.00
111 (695.33110105)LS1$5,000.00$5,000.00
112 (695.33110205)LS1$5,000.00$2,500.00
113 (695.33110305)LS1$5,000.00$2,500.00
114 (695.33110405)LS1$5,000.00$2,500.00
115 (695.33110505)LS1$5,000.00$2,500.00
116 (695.33110605)LS1$5,000.00$2,500.00
117 (695.33110705)LS1$5,000.00$2,500.00
118 (695.33110805)LS1$5,000.00$2,500.00
119 (695.33110905)LS1$5,000.00$2,500.00
120 (695.33111005)LS1$5,000.00$2,500.00
121 (695.33111105)LS1$5,000.00$2,500.00
122 (695.33111205)LS1$5,000.00$2,500.00
123 (695.33111305)LS1$5,000.00$2,414.00
124 (695.33111405)LS1$5,000.00$5,000.00
125 (695.33111505)LS1$5,000.00$5,000.00
126Field Change Payment (FCP) (697.03)DOL310,000$1.00$1.00
127Asphalt Price Adjustment (698.04)DOL100$1.00$1.00
128Fuel Price Adjustment (698.05)DOL100$1.00$1.00
129Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00
130Mobilization (699.040001)LS1$800,000$959,798
NYSDOT contract D265631: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy