NYSDOT contract D265671 bid tabulation

BRIDGE CLEANING - Various Routes, Various Locations. Let by New York State DOT on January 8, 2026, Genesee, Livingston, Monroe, Orleans,, Region 04. 3 bids received; low bid $1,862,895 by Hunting Valley Construction Inc.

Owner
New York State DOT
Letting
08 JAN 2026
Pay items
18
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hunting Valley Construction Inc$1,862,895Low
2DD&N Contracting LLC$1,971,148+6.0%
3Aad Contracting Inc$2,643,586+42%
NYSDOT contract D265671: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hunting Valley Construction Inc2. DD&N Contracting LLC3. Aad Contracting Inc
1Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03)SF597,547$0.48$0.60$0.80
2Basic Work Zone Traffic Control (Daily Operations) (619.0101)LS1$1,024,000$771,000$800,000
3Type III Construction Barricades (619.04)EACH512$6.00$10.00$4.00
4 (619.111211)WEEK4$1,000.00$1,000.00$1,000.00
5Nighttime Operations (Entire Project) (619.24)LS1$4,000.00$10,000$4,000.00
6Engineer’s Field Office – Type 2 (637.12)MONTH10$1,500.00$2,000.00$500.00
7Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00
8 (641.51012016)52$1,500.00$3,000.00$3,000.00
9 (641.51012116)103$1,500.00$3,000.00$4,000.00
10 (641.51012316)56$1,500.00$3,000.00$8,000.00
11 (641.51022016)1$2,500.00$3,000.00$4,000.00
12 (641.51022116)4$2,500.00$3,000.00$4,000.00
13 (641.51022316)5$2,500.00$3,000.00$20,000
14 (641.51032016)2$5,000.00$3,000.00$12,000
15 (641.51032116)1$5,000.00$3,000.00$12,000
16 (675.99000023)13,000$1.00$1.00$1.00
17Field Change Payment (FCP) (697.03)DOL85,000$1.00$1.00$1.00
18Mobilization (699.040001)LS1$71,000$32,000$80,000
NYSDOT contract D265671: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy