Aad Contracting Inc: NYSDOT bid record

Aad Contracting Inc submitted 20 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 26 FEB 2026, and was the low bidder on 3 of them (15%). When it was not low, its total sat a median +50% above the low bid.

Owner
New York State DOT
Low bid volume
$4,583,444
Latest bid
26 FEB 2026
Data through
15 OCT 2026
20Bids
3Low bids
15Win rate, percent
+50%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
20227114%
20235120%
20245120%
2026300%
Aad Contracting Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 044250%
Region 084125%
Region 05400%
Region 01300%
Region 09200%
Region 03100%
Region 06100%
Region 02100%
Aad Contracting Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Office Technology and Supplies637.34DOL1919 (100%)$1.00$1.00
Field Change Payment (FCP)697.03DOL1717 (100%)$1.00$1.00
Engineer’s Field Office – Type 2637.12MONTH109 (90%)$750.00$2,500.00
641.51011016128 (67%)$2,000.00$3,000.00
675.9900002388 (100%)$1.00$1.00
641.51012016106 (60%)$3,000.00$2,950.00
641.51012116125 (42%)$4,000.00$2,800.00
641.51011116143 (21%)$3,200.00$3,700.00
Protective Sealing of Existing Structural Concrete and Existing Bridge Decks559.03SF142 (14%)$0.70$1.20
641.51021116122 (17%)$4,000.00$3,900.00
641.5102101652 (40%)$2,000.00$3,500.00
641.51011316111 (9%)$6,000.00$3,600.00
Aad Contracting Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Fleetwash, Inc.139 of 13
Hunting Valley Construction Inc75 of 7
DD&N Contracting LLC66 of 6
Atlas Painting & Sheeting Corporation20 of 2
FCS Group LLC11 of 1
Aad Contracting Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
26 FEB 2026D265656Region 02Bridge Cleaning Project 262 of 2$789,000+18%
05 FEB 2026D265630Region 08BRIDGE WASHING/ DECK SEALING 2026 - Various Locations.3 of 3$1,724,135+52%
08 JAN 2026D265671Region 04BRIDGE CLEANING - Various Routes, Various Locations.3 of 3$2,643,586+42%
19 DEC 2024D265380Region 09BRIDGE WASHING PROJECT REGIONWIDE FFY252 of 2$3,004,030+50%
19 DEC 2024D265387Region 08BRIDGE WASHING/ DECK SEALING: REGION WIDE2 of 2$3,476,689+33%
21 NOV 2024D265351Region 05Bridge Washing & Deck Sealing SFY 24/252 of 2$1,670,370+81%
10 OCT 2024D265333Region 01Region 1 Bridge Washing SFY 242 of 2$1,583,412+94%
11 JAN 2024D265175Region 04BRIDGE WASHING CONTRACT 20241 of 2$1,724,530Low, 22% under the second
14 DEC 2023D265149Region 05Bridge Cleaning & Sealing - SFY 23/243 of 3$1,041,700+18%
14 DEC 2023D265153Region 01Bridge Washing Contract SFY 20232 of 3$1,272,777+27%
23 MAR 2023D264999Region 082023 Bridge Washing and Deck Sealing Contract1 of 2$1,424,519Low, 4.0% under the second
05 JAN 2023D264941Region 09Bridge Washing Project FFY232 of 2$2,651,872+53%
05 JAN 2023D264950Region 04BRIDGE WASHING CONTRACT 20232 of 3$1,413,615+69%
15 DEC 2022D264932Region 05PIN 5813.77 - Bridge Washing & Deck Sealing SFY 22/232 of 3$1,240,933+67%
15 DEC 2022D264933Region 05BRIDGE CLEANING & DECK SEALING, Various Routes & Towns.2 of 2$1,046,158+96%
06 OCT 2022D264884Region 01Bridge Washing Contract SFY 20222 of 2$3,572,603+31%
24 MAR 2022D264708Region 08NYSDOT Region 8 Bridge Washing/Deck Sealing2 of 3$1,072,407+1.0%
17 FEB 2022D264740Region 06Bridge Washing and Deck Sealing THROUGHOUT NYSDOT REGION 63 of 4$3,470,244+67%
03 FEB 2022D264681Region 03BRIDGE CLEANING AND WASHING, NYSDOT Region-32 of 2$2,432,300+47%
06 JAN 2022D264673Region 04NYSDOT Region-4, BRIDGE WASHING CONTRACT 20221 of 2$1,434,395Low, 7.0% under the second
Aad Contracting Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.