Fleetwash, Inc.: NYSDOT bid record

Fleetwash, Inc. submitted 17 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 08 FEB 2024, and was the low bidder on 10 of them (59%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
New York State DOT
Low bid volume
$14,473,744
Latest bid
08 FEB 2024
Data through
15 OCT 2026
17Bids
10Low bids
59Win rate, percent
+7.0%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
20227457%
20236467%
20244250%
Fleetwash, Inc., NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 054250%
Region 043133%
Region 0322100%
Region 062150%
Region 082150%
Region 0122100%
Region 0911100%
Region 02100%
Fleetwash, Inc., NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Office Technology and Supplies637.34DOL1414 (100%)$1.00$1.00
Field Change Payment (FCP)697.03DOL1313 (100%)$1.00$1.00
Protective Sealing of Existing Structural Concrete and Existing Bridge Decks559.03SF107 (70%)$0.40$1.20
675.9900002377 (100%)$1.00$1.00
Engineer’s Field Office – Type 2637.12MONTH75 (71%)$1,000.00$2,500.00
641.5103211655 (100%)$2,800.00$9,000.00
641.51021116104 (40%)$3,350.00$3,900.00
641.5102131684 (50%)$2,900.00$3,000.00
641.5101231674 (57%)$2,800.00$2,900.00
641.5103111654 (80%)$3,000.00$5,000.00
641.51011316103 (30%)$3,400.00$3,600.00
641.5101211693 (33%)$2,800.00$2,800.00
Fleetwash, Inc., NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Aad Contracting Inc134 of 13
Hunting Valley Construction Inc84 of 8
Atlas Painting & Sheeting Corporation20 of 2
Economy Paving Co Inc10 of 1
Fleetwash, Inc., NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
08 FEB 2024D265178Region 03Regional Bridge Cleaning and Washing1 of 1$1,752,400Low
08 FEB 2024D265191Region 06Bridge Washing & Deck Sealing 23/241 of 3$2,298,266Low, 8.0% under the second
11 JAN 2024D265175Region 04BRIDGE WASHING CONTRACT 20242 of 2$2,102,300+22%
11 JAN 2024D265176Region 02BRIDGE CLEANING PROJECT 20242 of 2$732,000+5.0%
14 DEC 2023D265149Region 05Bridge Cleaning & Sealing - SFY 23/241 of 3$881,772Low, 12% under the second
14 DEC 2023D265153Region 01Bridge Washing Contract SFY 20231 of 3$998,767Low, 27% under the second
30 NOV 2023D265148Region 05Bridge Washing & Deck Sealing_SFY 23_24_Erie and Niagara Co.2 of 2$898,656+5.0%
23 MAR 2023D264999Region 082023 Bridge Washing and Deck Sealing Contract2 of 2$1,476,862+4.0%
05 JAN 2023D264941Region 09Bridge Washing Project FFY231 of 2$1,738,355Low, 53% under the second
05 JAN 2023D264950Region 04BRIDGE WASHING CONTRACT 20231 of 3$836,615Low, 69% under the second
15 DEC 2022D264932Region 05PIN 5813.77 - Bridge Washing & Deck Sealing SFY 22/233 of 3$1,282,655+73%
15 DEC 2022D264933Region 05BRIDGE CLEANING & DECK SEALING, Various Routes & Towns.1 of 2$532,684Low, 96% under the second
06 OCT 2022D264884Region 01Bridge Washing Contract SFY 20221 of 2$2,719,000Low, 31% under the second
24 MAR 2022D264708Region 08NYSDOT Region 8 Bridge Washing/Deck Sealing1 of 3$1,066,470Low, 1.0% under the second
17 FEB 2022D264740Region 06Bridge Washing and Deck Sealing THROUGHOUT NYSDOT REGION 62 of 4$2,895,830+40%
03 FEB 2022D264681Region 03BRIDGE CLEANING AND WASHING, NYSDOT Region-31 of 2$1,649,415Low, 47% under the second
06 JAN 2022D264673Region 04NYSDOT Region-4, BRIDGE WASHING CONTRACT 20222 of 2$1,537,540+7.0%
Fleetwash, Inc.: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy