NYSDOT contract D265799 bid tabulation
Bridge Repairs at Long Island Expressway over Commack Rd. Let by New York State DOT on July 30, 2026, Suffolk, Region 10. 7 bids received; low bid $11,331,713 by Peter Scalamandre & Sons Inc.
- Owner
- New York State DOT
- Letting
- 30 JUL 2026
- Pay items
- 95
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Scalamandre & Sons Inc | $11,331,713 | Low |
| 2 | Tully Construction Company Inc | $13,447,257 | +19% |
| 3 | H & L Contracting LLC | $13,990,550 | +23% |
| 4 | Northeast Structural Steel Inc | $14,847,120 | +31% |
| 5 | Bove Industries Inc | $18,658,000 | +65% |
| 6 | Defoe Corporation | $19,120,995 | +69% |
| 7 | Posillico Civil Inc | $24,762,575 | +119% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Scalamandre & Sons Inc | 2. Tully Construction Company Inc | 3. H & L Contracting LLC | 4. Northeast Structural Steel Inc | 5. Bove Industries Inc | 6. Defoe Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Select Structural Fill (203.21) | CY | 30 | $250.00 | $420.00 | $650.00 | $1,200.00 | $200.00 | $460.00 |
| 2 | Structure Excavation (206.01) | CY | 30 | $200.00 | $440.00 | $650.00 | $700.00 | $300.00 | $430.00 |
| 3 | Prefabricated Composite Structural Drain (207.26) | SY | 30 | $20.00 | $310.00 | $19.00 | $18.00 | $17.00 | $220.00 |
| 4 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 680 | $120.00 | $130.00 | $135.00 | $90.00 | $180.00 | $72.00 |
| 5 | (404.0951) | TON | 340 | $275.00 | $320.00 | $300.00 | $280.00 | $350.00 | $325.00 |
| 6 | (404.4289) | TON | 900 | $175.00 | $310.00 | $315.00 | $325.00 | $300.00 | $240.00 |
| 7 | Straight Tack Coat (407.0103) | GAL | 120 | $60.00 | $34.00 | $31.00 | $35.00 | $10.00 | $60.00 |
| 8 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 8,030 | $15.15 | $30.00 | $19.00 | $19.00 | $35.00 | $22.00 |
| 9 | Bump Grinding - PCC with Slurry Removal (505.0102) | SY | 140 | $350.00 | $480.00 | $255.00 | $575.00 | $320.00 | $130.00 |
| 10 | Concrete for Structures, Performance (555.0021) | CY | 60 | $4,500.00 | $3,300.00 | $8,000.00 | $6,500.00 | $8,500.00 | $5,580.00 |
| 11 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 12 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 12,680 | $20.00 | $3.25 | $17.00 | $16.32 | $5.00 | $3.70 |
| 13 | Stud Shear Connectors for Bridges (556.03) | EACH | 440 | $15.00 | $170.00 | $80.00 | $60.00 | $55.00 | $48.00 |
| 14 | (557.1011) | SY | 110 | $750.00 | $900.00 | $1,100.00 | $1,680.00 | $3,000.00 | $1,200.00 |
| 15 | (557.1111) | SY | 250 | $1,250.00 | $560.00 | $970.00 | $1,010.00 | $1,750.00 | $4,000.00 |
| 16 | (557.75010216) | 510 | $350.00 | $300.00 | $360.00 | $300.00 | $625.00 | $400.00 | |
| 17 | (557.75010416) | 110 | $750.00 | $1,000.00 | $444.00 | $450.00 | $1,300.00 | $870.00 | |
| 18 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $39.05 | $39.05 | $39.05 | $39.05 | $39.05 | $39.05 |
| 19 | Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03) | SF | 24,100 | $5.00 | $0.45 | $3.00 | $2.88 | $4.00 | $2.10 |
| 20 | (564.47040007) | 24 | $3,000.00 | $2,900.00 | $1,800.00 | $3,500.00 | $6,500.00 | $4,800.00 | |
| 21 | (564.510001) | LB | 880 | $20.00 | $35.00 | $7.00 | $12.50 | $32.00 | $35.00 |
| 22 | (564.510002) | LB | 2,060 | $10.00 | $44.00 | $9.00 | $15.00 | $32.00 | $29.00 |
| 23 | (564.510003) | LB | 1,760 | $30.00 | $52.00 | $30.00 | $34.00 | $40.00 | $37.00 |
| 24 | (564.700001) | EACH | 4 | $4,500.00 | $4,500.00 | $4,500.00 | $12,500 | $7,500.00 | $10,500 |
| 25 | (564.700002) | EACH | 20 | $6,000.00 | $4,500.00 | $5,000.00 | $21,500 | $10,000 | $14,000 |
| 26 | (564.700003) | EACH | 12 | $4,500.00 | $5,800.00 | $5,000.00 | $12,500 | $6,400.00 | $7,000.00 |
| 27 | (564.700004) | EACH | 8 | $3,500.00 | $5,800.00 | $5,000.00 | $10,000 | $5,500.00 | $5,000.00 |
| 28 | (564.700005) | EACH | 4 | $15,000 | $7,300.00 | $5,500.00 | $30,000 | $32,500 | $28,500 |
| 29 | Type E.B. Fixed Bearing (56 to 111 k) (565.2022) | EACH | 26 | $4,500.00 | $7,300.00 | $2,500.00 | $9,500.00 | $5,000.00 | $5,500.00 |
| 30 | Type E.B. Expansion Bearing (56 to 111 k) (565.2032) | EACH | 78 | $4,250.00 | $7,300.00 | $2,500.00 | $9,000.00 | $5,000.00 | $6,000.00 |
| 31 | Type E.B. Expansion Bearing (112 to 168 k) (565.2033) | EACH | 52 | $4,500.00 | $7,300.00 | $2,500.00 | $9,000.00 | $5,200.00 | $7,000.00 |
| 32 | (567.51000016) | 210 | $100.00 | $150.00 | $205.00 | $115.00 | $205.00 | $226.00 | |
| 33 | Bridge Joint Seal (567.63) | LF | 210 | $100.00 | $370.00 | $124.43 | $140.00 | $192.00 | $226.00 |
| 34 | (568.09010001) | 310 | $375.00 | $200.00 | $270.00 | $350.00 | $294.00 | $300.00 | |
| 35 | (568.12010010) | 160 | $275.00 | $650.00 | $205.00 | $300.00 | $205.00 | $215.00 | |
| 36 | Permanent Concrete Traffic Barrier for Structures (Half Section) (569.02) | LF | 80 | $750.00 | $700.00 | $1,500.00 | $1,000.00 | $1,200.00 | $1,040.00 |
| 37 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $143.88 | $143.88 | $143.88 | $143.88 | $143.88 | $143.88 |
| 38 | Lead-Exposure Control Plan (570.01) | LS | 1 | $10,000 | $10,000 | $10,000 | $12,000 | $4,000.00 | $4,200.00 |
| 39 | Medical Testing (570.02) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 36,400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 41 | Decontamination Facilities (570.04) | CALENDAR WEEK | 52 | $500.00 | $1,500.00 | $100.00 | $110.00 | $150.00 | $160.00 |
| 42 | (570.090001) | LS | 1 | $5,000.00 | $5,500.00 | $15,000 | $12,000 | $3,600.00 | $3,780.00 |
| 43 | (570.160001) | LS | 1 | $5,000.00 | $5,500.00 | $11,000 | $12,500 | $5,000.00 | $5,250.00 |
| 44 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 220 | $75.00 | $1.50 | $10.00 | $12.50 | $12.00 | $12.00 |
| 45 | (572.010001) | SF | 2,070 | $10.00 | $24.00 | $13.50 | $5.00 | $17.00 | $14.00 |
| 46 | (574.030001) | SF | 220 | $750.00 | $200.00 | $400.00 | $425.00 | $171.00 | $245.00 |
| 47 | Removal of Structural Concrete (580.01) | CY | 160 | $10,000 | $3,200.00 | $14,250 | $6,500.00 | $9,039.00 | $6,600.00 |
| 48 | (585.01) | EACH | 52 | $15,000 | $7,500.00 | $23,000 | $12,000 | $34,000 | $33,500 |
| 49 | (585.02) | EACH | 52 | $15,000 | $7,500.00 | $25,000 | $12,000 | $34,000 | $33,500 |
| 50 | (585.03) | EACH | 20 | $12,500 | $12,000 | $28,000 | $15,000 | $27,500 | $25,000 |
| 51 | (585.04) | EACH | 32 | $10,000 | $12,000 | $28,000 | $12,000 | $22,000 | $28,000 |
| 52 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 2,100 | $75.00 | $45.00 | $62.00 | $75.00 | $75.00 | $71.00 |
| 53 | Field Drill Holes in Existing Structural Steel (586.10) | EACH | 1,190 | $75.00 | $60.00 | $75.00 | $75.00 | $120.00 | $100.00 |
| 54 | (589.520001) | EACH | 156 | $750.00 | $4,200.00 | $3,950.00 | $4,000.00 | $3,400.00 | $1,900.00 |
| 55 | (589.520002) | EACH | 24 | $1,500.00 | $3,400.00 | $1,250.00 | $7,500.00 | $3,300.00 | $3,700.00 |
| 56 | (589.520003) | EACH | 24 | $450.00 | $2,300.00 | $1,250.00 | $7,500.00 | $2,800.00 | $2,000.00 |
| 57 | (589.520004) | EACH | 2 | $450.00 | $5,400.00 | $1,100.00 | $6,000.00 | $525.00 | $11,000 |
| 58 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 120 | $100.00 | $95.00 | $67.00 | $100.00 | $70.00 | $70.00 |
| 59 | Half Section Concrete Barrier (Optional) (606.3004) | LF | 60 | $1,250.00 | $270.00 | $1,900.00 | $1,083.33 | $1,200.00 | $530.00 |
| 60 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 240 | $30.00 | $41.00 | $30.00 | $95.00 | $32.00 | $31.00 |
| 61 | Removing and Disposing Concrete Barrier-Half Section (606.7510) | LF | 70 | $75.00 | $150.00 | $420.00 | $125.00 | $170.00 | $233.00 |
| 62 | Corrugated Beam Guide Railing Transition Assembly Concrete Parapets, or Concrete Barrier (606.8704) | EACH | 4 | $7,000.00 | $10,000 | $6,800.00 | $11,000 | $7,000.00 | $7,140.00 |
| 63 | Improvement of Vegetated Areas (614.05) | SY | 108 | $70.00 | $50.00 | $50.00 | $62.96 | $50.00 | $52.00 |
| 64 | (614.060102) | EACH | 1 | $1,250.00 | $900.00 | $900.00 | $1,250.00 | $1,325.00 | $840.00 |
| 65 | (614.060302) | EACH | 2 | $2,250.00 | $1,500.00 | $1,500.00 | $1,000.00 | $1,925.00 | $630.00 |
| 66 | (614.060702) | EACH | 1 | $10,000 | $7,000.00 | $7,000.00 | $6,000.00 | $7,425.00 | $4,725.00 |
| 67 | (617.01010024) | 11 | $75.00 | $50.00 | $50.00 | $150.00 | $50.00 | $105.00 | |
| 68 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $898,705 | $3,100,000 | $949,992 | $2,700,683 | $3,581,155 | $3,109,000 |
| 69 | Type III Construction Barricades (619.04) | EACH | 25 | $150.00 | $600.00 | $250.00 | $400.00 | $378.00 | $440.00 |
| 70 | (619.100102) | LF | 6,800 | $4.00 | $3.00 | $2.95 | $3.00 | $2.95 | $2.00 |
| 71 | (619.110512) | EACH | 3 | $36,000 | $25,000 | $25,000 | $23,000 | $19,000 | $30,000 |
| 72 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 720 | $250.00 | $140.00 | $115.00 | $100.00 | $110.00 | $145.00 |
| 73 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 40 | $150.00 | $390.00 | $200.00 | $130.00 | $65.00 | $254.00 |
| 74 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 2 | $20,000 | $40,000 | $15,000 | $65,000 | $10,000 | $44,485 |
| 75 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $399,751 | $950,000 | $175,000 | $250,000 | $375,000 | $700,000 |
| 76 | Survey Operations (625.01) | LS | 1 | $120,000 | $80,000 | $25,000 | $112,800 | $176,233 | $1,200,000 |
| 77 | Concrete Cylinder Curing Equipment (637.04) | EACH | 2 | $4,500.00 | $1,500.00 | $4,800.00 | $10,000 | $5,000.00 | $1,900.00 |
| 78 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 14 | $5,500.00 | $25,000 | $11,000 | $20,000 | $13,500 | $10,700 |
| 79 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 81 | (637.41000115) | 14 | $350.00 | $500.00 | $260.00 | $200.00 | $105.00 | $255.00 | |
| 82 | (639.21010011) | LS | 1 | $75,000 | $75,000 | $75,000 | $75,000 | $75,000 | $75,000 |
| 83 | (641.01010010) | 16 | $4,000.00 | $3,000.00 | $1,875.00 | $1,000.00 | $2,500.00 | $10,500 | |
| 84 | (680.83200010) | LS | 1 | $10,000 | $11,000 | $2,900.00 | $12,500 | $15,000 | $15,750 |
| 85 | (685.07200110) | 10,110 | $1.25 | $1.00 | $0.95 | $1.00 | $1.00 | $1.00 | |
| 86 | (685.07200310) | 2 | $250.00 | $200.00 | $200.00 | $205.00 | $200.00 | $210.00 | |
| 87 | (685.07200410) | 1,650 | $3.50 | $2.50 | $2.45 | $2.50 | $2.50 | $2.60 | |
| 88 | (685.07200610) | 1,070 | $1.25 | $1.00 | $0.95 | $1.00 | $1.00 | $1.00 | |
| 89 | (685.07200710) | 760 | $3.50 | $2.50 | $2.45 | $2.50 | $2.50 | $2.60 | |
| 90 | (691.04000020) | 70,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 91 | Field Change Payment (FCP) (697.03) | DOL | 1,033,049.22 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 92 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 93 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 94 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 95 | Mobilization (699.040001) | LS | 1 | $375,000 | $510,000 | $520,000 | $570,000 | $710,000 | $730,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 30, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.