NCDOT contract C204996 bid tabulation
ITS. I-295 FROM SOUTHERN I-95 INTERCHANGE TO NORTHERN I-95 INTERCHANGE. Let by North Carolina DOT on March 17, 2026, Cumberland, Robeson. 2 bids received; low bid $6,243,764 by Fulcher Electric of Fayetteville Inc.
- Owner
- North Carolina DOT
- Letting
- 17 MAR 2026
- Pay items
- 63
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Fulcher Electric of Fayetteville Inc | $6,243,764 | Low |
| 2 | Als of North Carolina, Inc. | $6,875,000 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fulcher Electric of Fayetteville Inc | 2. Als of North Carolina, Inc. |
|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $500,000 | $332,100 |
| 0002 | Borrow excavation (0106000000-E) | CY | 80 | $100.00 | $20.00 |
| 0003 | Fine grading (1011000000-N) | LS | 1 | $50,000 | $27,234 |
| 0004 | Aggregate base course (1121000000-E) | TON | 70 | $100.00 | $120.00 |
| 0005 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 40 | $640.00 | $850.00 |
| 0006 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 30 | $575.00 | $850.00 |
| 0007 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 30 | $600.00 | $875.00 |
| 0008 | Asphalt binder for plant mix (1575000000-E) | TON | 10 | $655.00 | $750.00 |
| 0009 | Steel beam guardrail (3030000000-E) | LF | 700 | $26.00 | $26.00 |
| 0010 | Additional guardrail posts (3150000000-N) | EACH | 20 | $55.00 | $54.00 |
| 0011 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 1 | $1,190.00 | $2,000.00 |
| 0012 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 3 | $3,700.00 | $4,000.00 |
| 0013 | Remove existing guardrail (3360000000-E) | LF | 100 | $2.10 | $2.25 |
| 0014 | Overhead footing (4057000000-E) | CY | 54 | $2,500.00 | $1,650.00 |
| 0015 | Temporary traffic control (4457000000-N) | LS | 1 | $400,000 | $132,999 |
| 0016 | Temporary silt fence (6000000000-E) | LF | 200 | $25.00 | $5.00 |
| 0017 | Sediment control stone (6012000000-E) | TON | 30 | $100.00 | $44.00 |
| 0018 | Temporary mulching (6015000000-E) | ACRE | 0.20 | $15,000 | $5,000.00 |
| 0019 | Safety fence (6029000000-E) | LF | 100 | $15.00 | $5.00 |
| 0020 | 1/4" hardware cloth (6042000000-E) | LF | 130 | $10.00 | $10.00 |
| 0021 | Seeding and mulching (6084000000-E) | ACRE | 0.20 | $15,000 | $5,500.00 |
| 0022 | Mowing (6087000000-E) | ACRE | 0.20 | $5,000.00 | $4,000.00 |
| 0023 | Specialized hand mowing (6114500000-N) | MHR | 10 | $100.00 | $125.00 |
| 0024 | Response for erosion control (6117000000-N) | EACH | 7 | $1,500.00 | $52.00 |
| 0025 | Tracer wire (7279000000-E) | LF | 187,030 | $0.75 | $0.75 |
| 0026 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 4,100 | $6.50 | $15.75 |
| 0027 | Unpaved trench (***********) - (2, 1-1/4") (7300000000-E) | LF | 685 | $6.50 | $15.75 |
| 0028 | Unpaved trench (***********) - (3, 1-1/4") (7300000000-E) | LF | 148,735 | $6.75 | $15.75 |
| 0029 | Direct drill (***********) - (1, 2") (7301000000-E) | LF | 1,135 | $13.00 | $20.00 |
| 0030 | Direct drill (***********) - (2, 1-1/4") (7301000000-E) | LF | 2,845 | $13.00 | $20.00 |
| 0031 | Direct drill (***********) - (3, 1-1/4") (7301000000-E) | LF | 33,570 | $24.00 | $21.00 |
| 0032 | Junction box (***************) - (special oversized, heavy duty) (7312000000-N) | EACH | 25 | $2,250.00 | $2,400.00 |
| 0033 | Junction box (standard size) (7324000000-N) | EACH | 33 | $425.00 | $600.00 |
| 0034 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 232 | $1,345.00 | $1,400.00 |
| 0035 | Wood pole (7360000000-N) | EACH | 4 | $2,500.00 | $2,800.00 |
| 0036 | 1" riser with weatherhead (7408000000-E) | EACH | 12 | $1,000.00 | $700.00 |
| 0037 | Communications cable (** fiber) - (144) (7516000000-E) | LF | 195,830 | $3.50 | $3.75 |
| 0038 | Drop cable (7528000000-E) | LF | 5,195 | $2.80 | $3.00 |
| 0039 | Splice enclosure (7540000000-N) | EACH | 25 | $2,300.00 | $2,450.00 |
| 0040 | Interconnect center (7552000000-N) | EACH | 28 | $3,500.00 | $3,575.00 |
| 0041 | Delineator marker (7566000000-N) | EACH | 257 | $128.00 | $100.00 |
| 0042 | Generic signal item (EA) - 5/8" X 10' grounding electrode (7980000000-N) | EACH | 257 | $300.00 | $400.00 |
| 0043 | Generic signal item (EA) - CCTV wood pole (7980000000-N) | EACH | 8 | $6,500.00 | $4,800.00 |
| 0044 | Generic signal item (EA) - digital CCTV camera assembly (7980000000-N) | EACH | 10 | $6,500.00 | $6,200.00 |
| 0045 | Generic signal item (EA) - DMS access ladder (7980000000-N) | EACH | 3 | $45,000 | $11,700 |
| 0046 | Generic signal item (EA) - DMS pedestal structure (7980000000-N) | EACH | 3 | $45,000 | $68,000 |
| 0047 | Generic signal item (EA) - dynamic message sign (type 2C) (7980000000-N) | EACH | 5 | $155,000 | $118,000 |
| 0048 | Generic signal item (EA) - electronic marker ball (orange) (7980000000-N) | EACH | 257 | $200.00 | $75.00 |
| 0049 | Generic signal item (EA) - electronic marker ball (red) (7980000000-N) | EACH | 33 | $250.00 | $75.00 |
| 0050 | Generic signal item (EA) - equipment cabinet disconnect (7980000000-N) | EACH | 11 | $1,750.00 | $2,000.00 |
| 0051 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 26 | $2,300.00 | $1,650.00 |
| 0052 | Generic signal item (EA) - fiber-optic hub cabinet (7980000000-N) | EACH | 1 | $29,610 | $33,271 |
| 0053 | Generic signal item (EA) - field equipment cabinet (7980000000-N) | EACH | 8 | $6,800.00 | $9,984.00 |
| 0054 | Generic signal item (EA) - install cellular modem and antenna (7980000000-N) | EACH | 3 | $500.00 | $1,500.00 |
| 0055 | Generic signal item (EA) - meter base/disconnect combination panel (7980000000-N) | EACH | 6 | $2,500.00 | $4,000.00 |
| 0056 | Generic signal item (EA) - modify electrical service (7980000000-N) | EACH | 5 | $2,500.00 | $575.00 |
| 0057 | Generic signal item (EA) - removal of wireless equipment from ITS device site (7980000000-N) | EACH | 15 | $1,500.00 | $250.00 |
| 0058 | Generic signal item (EA) - removal of wireless repeater equipment (7980000000-N) | EACH | 4 | $3,000.00 | $550.00 |
| 0059 | Generic signal item (EA) - remove solar power equipment (7980000000-N) | EACH | 2 | $5,500.00 | $1,500.00 |
| 0060 | Generic signal item (EA) - solar power assembly (7980000000-N) | EACH | 3 | $15,000 | $17,500 |
| 0061 | Generic signal item (LF) - #4 solid bare grounding conductor (7990000000-E) | LF | 1,200 | $11.00 | $14.00 |
| 0062 | Generic signal item (LF) - 3-wire copper feeder conductors (7990000000-E) | LF | 4,545 | $14.85 | $14.00 |
| 0063 | Generic signal item (LF) - 4-wire copper feeder conductors (7990000000-E) | LF | 1,295 | $21.50 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of March 17, 2026. Compiled by Mirage Metrics.