NCDOT contract C205058 bid tabulation

MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 7 SECTIONS OF SECONDARY ROADS. Let by North Carolina DOT on March 18, 2025, Granville. 2 bids received; low bid $2,369,325 by Sunrock Industries LLC DBA Carolina Sunrock LLC.

Owner
North Carolina DOT
Letting
18 MAR 2025
Pay items
15
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sunrock Industries LLC DBA Carolina Sunrock LLC$2,369,325Low
2S T Wooten Corporation$2,523,320+6.0%
NCDOT contract C205058: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sunrock Industries LLC DBA Carolina Sunrock LLC2. S T Wooten Corporation
0001Mobilization (0000100000-N)LS1$115,522$125,000
0002Incidental stone base (1220000000-E)TON932$80.50$35.00
0003Shoulder reconstruction (1245000000-E)SMI37.23$2,755.00$2,935.00
0004Aggregate shoulder borrow (1260000000-E)TON3,443$20.50$25.75
0005Incidental milling (1330000000-E)SY3,329$9.20$14.50
0006Asphalt conc surface course, type S9.5B (1519000000-E)TON20,376$51.60$62.25
0007Asphalt binder for plant mix (1575000000-E)TON1,334$500.00$415.00
0008Patching existing pavement (1704000000-E)TON196$189.00$130.00
0009Work zone advance/general warning signing (4413000000-E)SF2,103$6.25$6.78
0010Temporary traffic control (4457000000-N)LS1$18,120$69,457
0011Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E)LF369,690$0.50$0.50
0012Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E)LF152$2.50$2.50
0013Thermoplastic pavement marking lines (16", 90 mils) (4704000000-E)LF81$11.50$11.50
0014Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E)LF123$11.50$11.50
0015Thermoplastic pavement marking character (90 mils) (4720000000-E)EACH6$120.00$120.00
NCDOT contract C205058: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of March 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy