Sunrock Industries LLC DBA Carolina Sunrock LLC: NCDOT bid record
Sunrock Industries LLC DBA Carolina Sunrock LLC submitted 31 bids on North Carolina DOT contracts in the data, from 19 NOV 2024 to 15 SEP 2026, and was the low bidder on 12 of them (39%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $53,063,842
- Latest bid
- 15 SEP 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 5 | 1 | 20% |
| 2025 | 14 | 6 | 43% |
| 2026 | 12 | 5 | 42% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 12 | 1 | 8% |
| Granville | 3 | 3 | 100% |
| Alamance | 3 | 0 | 0% |
| Durham | 2 | 1 | 50% |
| Vance | 2 | 2 | 100% |
| Granville, Vance, Warren | 1 | 1 | 100% |
| Warren | 1 | 1 | 100% |
| Franklin | 1 | 0 | 0% |
| Person, Caswell | 1 | 1 | 100% |
| Orange | 1 | 0 | 0% |
| Durham, Wake | 1 | 1 | 100% |
| Johnston | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking lines (24", 90 mils) | 4709000000-E | LF | 29 | 26 (90%) | $11.00 | $13.50 |
| Thermoplastic pavement marking character (90 mils) | 4720000000-E | EACH | 25 | 24 (96%) | $100.00 | $116.50 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 26 | 21 (81%) | $125.00 | $135.00 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 22 | 20 (91%) | $2.00 | $2.25 |
| Aggregate shoulder borrow | 1260000000-E | TON | 25 | 19 (76%) | $25.50 | $28.00 |
| Inductive loop sawcut | 7444000000-E | LF | 20 | 18 (90%) | $12.00 | $7.25 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 24 | 17 (71%) | $0.60 | $0.75 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 17 | 16 (94%) | $3.00 | $3.05 |
| Adjustment of manholes | 2830000000-N | EACH | 22 | 14 (64%) | $900.00 | $900.00 |
| Thermoplastic pavement marking lines (6", 90 mils) | 4688000000-E | LF | 18 | 14 (78%) | $0.88 | $0.95 |
| Asphalt binder for plant mix | 1575000000-E | TON | 31 | 13 (42%) | $510.00 | $595.00 |
| Adjustment of meter boxes or valve boxes | 2845000000-N | EACH | 22 | 12 (55%) | $900.00 | $725.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| FSC II LLC DBA Fred Smith Company | 26 | 16 of 26 |
| S T Wooten Corporation | 20 | 5 of 20 |
| Blythe Construction Inc | 16 | 7 of 16 |
| Barnhill Contracting Company | 7 | 5 of 7 |
| Cardinal Civil Contracting LLC | 5 | 2 of 5 |
| Conti Civil LLC | 4 | 2 of 4 |
| Branch Civil Inc | 4 | 2 of 4 |
| Truerock Construction LLC | 3 | 1 of 3 |
| Apac - Atlantic, Inc. Thompson Arthur Division | 2 | 2 of 2 |
| Vecellio & Grogan Inc DBA Sharpe Brothers | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 SEP 2026 | C205233 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64 BUS, AND 46 SECTIONS OF SECONDARY ROADS | 2 of 4 | $4,414,582 | +1.0% |
| 15 SEP 2026 | C204349 | Wake, Durham | PAVEMENT REHABILITATION. I-40 FROM EAST OF I-885/NC-885 TO SR-1728 (WADE AVE) | 4 of 4 | $26,639,697 | +27% |
| 21 APR 2026 | C204857 | Johnston | GRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1700 (COVERED BRIDGE RD) FROM WEST OF SR-2685 (HELENA LN) TO EAST OF SR-1003 (BUFFALO RD) | 1 of 7 | $12,325,526 | Low, 7.0% under the second |
| 21 APR 2026 | C205190 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS | 3 of 6 | $4,120,150 | +3.0% |
| 21 APR 2026 | C205088 | Wake, Franklin | PAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE | 3 of 4 | $17,329,084 | +10% |
| 17 MAR 2026 | C205167 | Granville | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS | 1 of 2 | $2,846,467 | Low, 31% under the second |
| 17 MAR 2026 | C205181 | Durham, Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-15, AND 28 SECTIONS OF SECONDARY ROADS | 1 of 3 | $4,209,610 | Low, 12% under the second |
| 17 MAR 2026 | C204512 | Wake | GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, AND SIGNALS. US-401 FROM SOUTH OF SR-1006 (OLD STAGE ROAD) TO SOUTH OF | 3 of 4 | $29,554,602 | +15% |
| 17 MAR 2026 | C205038 | Wake | GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION OF SR-1006 (OLD STAGE RD) AND SR-2736 (ROCK SERVICE STATION RD) | 6 of 6 | $9,194,585 | +32% |
| 17 FEB 2026 | C205174 | Vance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-1 BUSINESS, AND 4 SECTIONS OF SECONDARY ROADS | 1 of 2 | $1,938,366 | Low, 15% under the second |
| 17 FEB 2026 | C204765 | Wake | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-3126 (AIRPORT BLVD) FROM GARDEN SQUARE LANE TO SR-1637 (CHURCH ST) IN MORRISVILLE | 1 of 9 | $9,867,642 | Low, 5.0% under the second |
| 20 JAN 2026 | C205162 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF PRIMARY ROADS, AND 26 SECTIONS OF SECONDARY ROADS | 2 of 5 | $4,763,769 | +1.0% |
| 18 NOV 2025 | C205148 | Durham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-55 | 4 of 5 | $4,726,334 | +19% |
| 21 OCT 2025 | C205136 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 14 SECTIONS OF SECONDARY ROADS | 4 of 5 | $5,231,358 | +19% |
| 21 OCT 2025 | C205134 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-70, 3 SECTIONS OF SECONDARY ROADS, AND 1 RAMP | 4 of 5 | $4,434,130 | +17% |
| 16 SEP 2025 | C205127 | Orange | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 57 SECTIONS OF SECONDARY ROADS | 2 of 3 | $5,614,870 | +2.0% |
| 15 JUL 2025 | C205115 | Alamance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 41 SECTIONS OF SECONDARY ROADS | 3 of 3 | $6,179,763 | +12% |
| 20 MAY 2025 | C205103 | Person, Caswell | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS | 1 of 3 | $1,465,373 | Low, 8.0% under the second |
| 15 APR 2025 | C205083 | Warren | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-158 BUSINESS, 1SECTION OF NC-58 EAST, AND 12 SECTIONS OF SECONDARY ROADS | 1 of 3 | $2,355,127 | Low, 6.0% under the second |
| 15 APR 2025 | C205084 | Franklin | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 14 SECTIONS OF SECONDARY ROADS | 3 of 4 | $1,964,753 | +5.0% |
| 18 MAR 2025 | C205067 | Granville, Vance, Warren | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-1, 1 SECTION OF US-158, 1 SECTION OF NC-56, AND 1 SECTION OF SECONDARY R | 1 of 2 | $2,909,199 | Low, 12% under the second |
| 18 MAR 2025 | C205058 | Granville | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 7 SECTIONS OF SECONDARY ROADS | 1 of 2 | $2,369,325 | Low, 6.0% under the second |
| 18 MAR 2025 | C205063 | Vance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS | 1 of 2 | $1,287,979 | Low, 10% under the second |
| 18 FEB 2025 | C205052 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 6 SECTIONS OF SECONDARY ROADS | 2 of 4 | $4,380,097 | +5.0% |
| 21 JAN 2025 | C205007 | Durham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US 15 BUSINESS, 2 SECTIONS OF US 70 BUSINESS, AND 31 SECTIONS OF SECONDARY | 1 of 2 | $5,249,708 | Low, 8.0% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.