Sunrock Industries LLC DBA Carolina Sunrock LLC: NCDOT bid record

Sunrock Industries LLC DBA Carolina Sunrock LLC submitted 31 bids on North Carolina DOT contracts in the data, from 19 NOV 2024 to 15 SEP 2026, and was the low bidder on 12 of them (39%). When it was not low, its total sat a median +11% above the low bid.

Owner
North Carolina DOT
Low bid volume
$53,063,842
Latest bid
15 SEP 2026
Data through
20 OCT 2026
31Bids
12Low bids
39Win rate, percent
+11%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
20245120%
202514643%
202612542%
Sunrock Industries LLC DBA Carolina Sunrock LLC, NCDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Wake1218%
Granville33100%
Alamance300%
Durham2150%
Vance22100%
Granville, Vance, Warren11100%
Warren11100%
Franklin100%
Person, Caswell11100%
Orange100%
Durham, Wake11100%
Johnston11100%
Sunrock Industries LLC DBA Carolina Sunrock LLC, NCDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Thermoplastic pavement marking lines (24", 90 mils)4709000000-ELF2926 (90%)$11.00$13.50
Thermoplastic pavement marking character (90 mils)4720000000-EEACH2524 (96%)$100.00$116.50
Thermoplastic pavement marking symbol (90 mils)4725000000-EEACH2621 (81%)$125.00$135.00
Thermoplastic pavement marking lines (8", 90 mils)4695000000-ELF2220 (91%)$2.00$2.25
Aggregate shoulder borrow1260000000-ETON2519 (76%)$25.50$28.00
Inductive loop sawcut7444000000-ELF2018 (90%)$12.00$7.25
Thermoplastic pavement marking lines (4", 90 mils)4685000000-ELF2417 (71%)$0.60$0.75
Thermoplastic pavement marking lines (12", 90 mils)4700000000-ELF1716 (94%)$3.00$3.05
Adjustment of manholes2830000000-NEACH2214 (64%)$900.00$900.00
Thermoplastic pavement marking lines (6", 90 mils)4688000000-ELF1814 (78%)$0.88$0.95
Asphalt binder for plant mix1575000000-ETON3113 (42%)$510.00$595.00
Adjustment of meter boxes or valve boxes2845000000-NEACH2212 (55%)$900.00$725.00
Sunrock Industries LLC DBA Carolina Sunrock LLC, NCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Sunrock Industries LLC DBA Carolina Sunrock LLC, NCDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 SEP 2026C205233WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64 BUS, AND 46 SECTIONS OF SECONDARY ROADS2 of 4$4,414,582+1.0%
15 SEP 2026C204349Wake, DurhamPAVEMENT REHABILITATION. I-40 FROM EAST OF I-885/NC-885 TO SR-1728 (WADE AVE)4 of 4$26,639,697+27%
21 APR 2026C204857JohnstonGRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1700 (COVERED BRIDGE RD) FROM WEST OF SR-2685 (HELENA LN) TO EAST OF SR-1003 (BUFFALO RD)1 of 7$12,325,526Low, 7.0% under the second
21 APR 2026C205190WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS3 of 6$4,120,150+3.0%
21 APR 2026C205088Wake, FranklinPAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE3 of 4$17,329,084+10%
17 MAR 2026C205167GranvilleMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS1 of 2$2,846,467Low, 31% under the second
17 MAR 2026C205181Durham, WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-15, AND 28 SECTIONS OF SECONDARY ROADS1 of 3$4,209,610Low, 12% under the second
17 MAR 2026C204512WakeGRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, AND SIGNALS. US-401 FROM SOUTH OF SR-1006 (OLD STAGE ROAD) TO SOUTH OF 3 of 4$29,554,602+15%
17 MAR 2026C205038WakeGRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION OF SR-1006 (OLD STAGE RD) AND SR-2736 (ROCK SERVICE STATION RD)6 of 6$9,194,585+32%
17 FEB 2026C205174VanceMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-1 BUSINESS, AND 4 SECTIONS OF SECONDARY ROADS1 of 2$1,938,366Low, 15% under the second
17 FEB 2026C204765WakeGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-3126 (AIRPORT BLVD) FROM GARDEN SQUARE LANE TO SR-1637 (CHURCH ST) IN MORRISVILLE1 of 9$9,867,642Low, 5.0% under the second
20 JAN 2026C205162WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF PRIMARY ROADS, AND 26 SECTIONS OF SECONDARY ROADS2 of 5$4,763,769+1.0%
18 NOV 2025C205148DurhamMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-554 of 5$4,726,334+19%
21 OCT 2025C205136WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 14 SECTIONS OF SECONDARY ROADS4 of 5$5,231,358+19%
21 OCT 2025C205134WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-70, 3 SECTIONS OF SECONDARY ROADS, AND 1 RAMP4 of 5$4,434,130+17%
16 SEP 2025C205127OrangeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 57 SECTIONS OF SECONDARY ROADS2 of 3$5,614,870+2.0%
15 JUL 2025C205115AlamanceMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 41 SECTIONS OF SECONDARY ROADS3 of 3$6,179,763+12%
20 MAY 2025C205103Person, CaswellMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS1 of 3$1,465,373Low, 8.0% under the second
15 APR 2025C205083WarrenMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-158 BUSINESS, 1SECTION OF NC-58 EAST, AND 12 SECTIONS OF SECONDARY ROADS1 of 3$2,355,127Low, 6.0% under the second
15 APR 2025C205084FranklinMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 14 SECTIONS OF SECONDARY ROADS3 of 4$1,964,753+5.0%
18 MAR 2025C205067Granville, Vance, WarrenMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-1, 1 SECTION OF US-158, 1 SECTION OF NC-56, AND 1 SECTION OF SECONDARY R1 of 2$2,909,199Low, 12% under the second
18 MAR 2025C205058GranvilleMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 7 SECTIONS OF SECONDARY ROADS1 of 2$2,369,325Low, 6.0% under the second
18 MAR 2025C205063VanceMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS1 of 2$1,287,979Low, 10% under the second
18 FEB 2025C205052WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 6 SECTIONS OF SECONDARY ROADS2 of 4$4,380,097+5.0%
21 JAN 2025C205007DurhamMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US 15 BUSINESS, 2 SECTIONS OF US 70 BUSINESS, AND 31 SECTIONS OF SECONDARY 1 of 2$5,249,708Low, 8.0% under the second
Sunrock Industries LLC DBA Carolina Sunrock LLC: latest NCDOT bids in the data

How this record was read

NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy