Barnhill Contracting Company: NCDOT bid record
Barnhill Contracting Company submitted 320 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 20 OCT 2026, and was the low bidder on 115 of them (36%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $1,404,903,605
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 36 | 10 | 28% |
| 2014 | 22 | 12 | 55% |
| 2015 | 42 | 16 | 38% |
| 2016 | 26 | 10 | 38% |
| 2017 | 17 | 9 | 53% |
| 2018 | 26 | 10 | 38% |
| 2019 | 14 | 4 | 29% |
| 2020 | 18 | 4 | 22% |
| 2021 | 19 | 7 | 37% |
| 2022 | 15 | 6 | 40% |
| 2023 | 20 | 6 | 30% |
| 2024 | 17 | 4 | 24% |
| 2025 | 27 | 10 | 37% |
| 2026 | 21 | 7 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 22 | 3 | 14% |
| Cumberland | 20 | 5 | 25% |
| Richmond | 15 | 7 | 47% |
| Brunswick | 15 | 3 | 20% |
| Onslow | 13 | 7 | 54% |
| Robeson | 13 | 6 | 46% |
| Sampson | 12 | 5 | 42% |
| Nash | 11 | 7 | 64% |
| Pender | 10 | 2 | 20% |
| Johnston | 10 | 1 | 10% |
| Hoke, Scotland | 8 | 5 | 63% |
| Wayne | 8 | 1 | 13% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 269 | 214 (80%) | $120.00 | $135.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 226 | 183 (81%) | $0.16 | $0.27 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 212 | 172 (81%) | $0.53 | $0.75 |
| Paint pavement marking symbol | 4845000000-N | EACH | 191 | 153 (80%) | $40.00 | $50.00 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 189 | 150 (79%) | $3.00 | $3.50 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 192 | 147 (77%) | $2.00 | $2.25 |
| Permanent raised pavement markers | 4900000000-N | EACH | 178 | 146 (82%) | $6.00 | $10.00 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 166 | 134 (81%) | $2.62 | $3.05 |
| Temporary silt fence | 6000000000-E | LF | 192 | 132 (69%) | $2.25 | $2.63 |
| Inductive loop sawcut | 7444000000-E | LF | 176 | 127 (72%) | $6.25 | $7.25 |
| Seeding and mulching | 6084000000-E | ACRE | 197 | 124 (63%) | $2,100.00 | $2,365.00 |
| Paint pavement marking lines (8") | 4820000000-E | LF | 145 | 119 (82%) | $0.65 | $0.82 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| S T Wooten Corporation | 136 | 79 of 136 |
| FSC II LLC DBA Fred Smith Company | 126 | 80 of 126 |
| Highland Paving Co LLC | 69 | 30 of 69 |
| Rose Brothers Paving Co Inc | 33 | 8 of 33 |
| Hudson Paving, Inc. | 31 | 12 of 31 |
| Carolina Sunrock LLC | 25 | 17 of 25 |
| Branch Civil Inc | 25 | 13 of 25 |
| W C English Incorporated | 24 | 6 of 24 |
| Blythe Construction Inc | 21 | 11 of 21 |
| The Lane Construction Corp | 15 | 10 of 15 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C205216 | Martin | GRADING, DRAINAGE, AND PAVING. US-17 FROM SR-1521 (MILL INN RD) TO SR-1119 (RALPH TAYLOR RD) | 1 of 4 | $7,495,824 | Low, 8.0% under the second |
| 15 SEP 2026 | C205206 | Onslow | GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION OF US-17 BUSINESS (MARINE BLVD) AND SR-1308 (BELL FORK RD) | 1 of 3 | $7,349,796 | Low, 12% under the second |
| 15 SEP 2026 | C205203 | Wayne | GRADING, DRAINAGE, AND PAVING. INTERSECTION OF NC-55 AND SR-1744 (OLD SEVEN SPRINGS RD/INDIAN SPRINGS RD) | 2 of 6 | $2,903,456 | 0.0% |
| 18 AUG 2026 | C205205 | Robeson | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #770587 ON SR-2225 (CREEK RD) OVER US-74 | 2 of 2 | $7,350,959 | +10% |
| 21 JUL 2026 | C205183 | Nash | PAVEMENT REHABILITATION AND BRIDGE PRESERVATION. I-95 FROM SR-1770 (SUNSET AVE) TO SR-1524 (RED OAK BATTLEBORO RD) | 2 of 2 | $8,452,432 | +13% |
| 16 JUN 2026 | C205182 | Carteret | GRADING, DRAINAGE, SIGNALS, AND PAVING. INTERSECTION OF NC-24 AND NC-58 | 1 of 2 | $8,873,341 | Low, 7.0% under the second |
| 16 JUN 2026 | C205213 | New Hanover | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 5 SECTIONS OF US-117, 3 SECTIONS OF NC-133, AND 46 SECTIONS OF SECONDARY ROADS | 1 of 3 | $5,331,174 | Low, 2.0% under the second |
| 16 JUN 2026 | C205212 | Pender | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421, 9 SECTIONS OF SECONDARY ROADS, AND 6 SECTIONS OF TOWN ROADS | 2 of 4 | $4,269,142 | +5.0% |
| 16 JUN 2026 | C204970 | Brunswick | GRADING, DRAINAGE, PAVING, AND SIGNALS. NEW ROUTE FROM 0.5 MILES EAST OF BRUNSWICK COUNTY LINE TO 1.5 MILES EAST OF BRUNSWICK COUNTY LINE ON | 1 of 7 | $7,881,585 | Low, 1.0% under the second |
| 19 MAY 2026 | C205153 | Hertford | GRADING, DRAINAGE, AND PAVING. US-158/US-258 FROM 0.56 MILES WEST OF SR-1157 (POWELL RD) TO 0.60 MILES EAST OF SR-1160 (BENTHALL BRIDGE RD) | 3 of 4 | $5,799,999 | +4.0% |
| 19 MAY 2026 | C205199 | Brunswick | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF NC-133, AND 19 SECTIONS OF SECONDARY ROADS | 2 of 4 | $5,235,358 | +2.0% |
| 19 MAY 2026 | C205187 | Cumberland | GRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURES., GRADING, DRAINAGE, AND PAVI | 3 of 4 | $16,735,353 | +8.0% |
| 21 APR 2026 | C205192 | Sampson | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-421, 1 SECTION OF US-701, AND 7 SECTIONS OF SECONDARY ROADS | 3 of 3 | $6,806,845 | +11% |
| 21 APR 2026 | C205130 | Wayne | GRADING, DRAINAGE PAVING, AND SIGNALS. SR-1556 (WAYNE MEMORIAL DR) FROM SR-1003 (NEW HOPE RD) TO I-42 | 3 of 5 | $20,945,781 | +6.0% |
| 21 APR 2026 | C205190 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS | 5 of 6 | $4,687,679 | +17% |
| 17 MAR 2026 | C205175 | Onslow | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF NC-111, 2 SECTIONS OF US-258, AND 6 SECTIONS OF SECONDARY ROADS | 2 of 4 | $6,346,569 | +2.0% |
| 17 MAR 2026 | C205176 | Richmond | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-74, AND 7 SECTIONS OF SECONDARY ROADS | 1 of 2 | $4,288,024 | Low, 4.0% under the second |
| 17 FEB 2026 | C205036 | Robeson | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-1997 (FAYETTEVILLE RD) FROM FARRINGDOM ST TO EAST 22ND ST | 1 of 4 | $39,239,190 | Low, 11% under the second |
| 17 FEB 2026 | C205035 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-13 (BERKELEY BLVD) FROM SR-1003 (NEW HOPE RD) TO US-70 BYPASS | 2 of 8 | $31,573,717 | +3.0% |
| 17 FEB 2026 | C205166 | Hoke, Scotland | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-401, 1 SECTION OF NC-79, AND 4 SECTIONS OF SECONDARY ROADS | 2 of 2 | $4,100,138 | +8.0% |
| 20 JAN 2026 | C205162 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF PRIMARY ROADS, AND 26 SECTIONS OF SECONDARY ROADS | 4 of 5 | $5,123,109 | +8.0% |
| 18 NOV 2025 | C205148 | Durham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-55 | 3 of 5 | $4,332,537 | +9.0% |
| 21 OCT 2025 | C205034 | Northampton | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. NC-46 FROM THE VIRGINIA STATE LINE TO NC-48 | 2 of 2 | $42,433,639 | +6.0% |
| 21 OCT 2025 | C205092 | Pitt | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-1203 (ALLEN RD) FROM SR-1467 (STANTONSBURG RD) TO US-13 (DICKINSON AVE EXT) | 1 of 3 | $47,191,561 | Low, 13% under the second |
| 21 OCT 2025 | C205136 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 14 SECTIONS OF SECONDARY ROADS | 2 of 5 | $4,767,803 | +8.0% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.