NCDOT letting results, January 20, 2026
8 contracts let by North Carolina DOT on January 20, 2026, $51,340,624 in low bids, a median of 4 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 8
- Low bids, total
- $51,340,624
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C205117 | GRADING, DRAINAGE, PAVING, AND SIGNALS. US-29 FROM 0.6 MILES WEST OF SR-1414 (ROCK HILL CHURCH RD) TO JUST EAST OF SR-1414 (ROCK HILL CHURCH RD) | Cabarrus | 5 | NJR Group Inc | $14,016,733 | $14,607,188 | +4.0% | NCDOT |
| C204814 | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #950020 OVER CSX TRANSPORTATION RAILROAD TRACKS ON US-70 BUS | Wayne | 7 | Blythe Construction Inc | $8,774,776 | $9,045,834 | +3.0% | NCDOT |
| C205161 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 6 SECTIONS OF PRIMARY ROADS, AND 16 SECTIONS OF SECONDARY ROADS | Chatham | 3 | Cardinal Civil Contracting LLC | $8,014,884 | $8,119,130 | +1.0% | NCDOT |
| C205132 | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #220075 ON NC-226 (POLKVILLE ROAD) OVER HINTON CREEK | Cleveland | 6 | Blythe Construction Inc | $5,417,482 | $6,385,066 | +18% | NCDOT |
| C205162 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF PRIMARY ROADS, AND 26 SECTIONS OF SECONDARY ROADS | Wake | 5 | FSC II LLC DBA Fred Smith Company | $4,721,893 | $4,763,769 | +1.0% | NCDOT |
| C205129 | GRADING, DRAINAGE, PAVING AND STRUCTURE. BRIDGE #680078 OVER NEUSE RIVER ON NC-306 | Pamlico | 2 | Smith-Rowe, LLC | $4,333,322 | $5,157,507 | +19% | NCDOT |
| C205163 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 4 SECTIONS OF PRIMARY ROADS, AND 14 SECTIONS OF SECONDARY ROADS | Lee | 3 | Highland Paving Co LLC | $3,073,927 | $3,131,644 | +2.0% | NCDOT |
| C205128 | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780176 OVER NC-14/NC-87 ON SR-1700 (FISHER HILL RD) | Rockingham | 3 | Smith-Rowe, LLC | $2,987,609 | $3,525,000 | +18% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.